Document p2gQovZYDan63y2QzvgjyEaDa
-
CHLOR - ALKALI 2 1994
REACTIVE CHEMICALS REVIEW CELL AREA
\
CELL AREA
Chlorine Cells
Potential Problem: Loss of Anolyte Level
Result: Hydrogen in Chlorine Explosion; Arcing within cell
Preventative Measures:
- 2 level transmitters and 1 low level carbon probe
- 4" rectifier shutdown (2/3,2/2,1/1)
- backup side feed level controller
- low level alarms
----------
low low-low
55" 5.0"
- 6" minimum operating head
- VRD conforming to CATC guidelines
- Level selection - high reading at >16* low reading at < 16"
- visual rounds
Potential Problem: High Series Hydrogen Pressure Result: Hydrogen in Chlorine Explosion Preventative Measures:
- 2 series relief on hydrogen stack at 45 - 6.0 " - high H2 pressure alarm at 4" - foam drains
October 6,1994 Dow Confidential Information
efp
00 A 037] p'p CONF T DENT IA(
Potential Problem: High Hydrogen During Operation
Result: Hydrogen in Chlorine Explosion
Preventative Measures:
- 2" air dilution valves
- open air dilution valves between 0.5 and 1.0%
- "quickie H2" and "total gas H2" analyzers
- Troubleshooting plugged radial feeders take salt off (300 gpl max salt) look for restricted H2 outlets bad cells
- Follow CATC guideline concerning air dilution and shutdown
- series voltage alarm to detect possible dip drop voltage prob.
- dip drop profiles quarterly by cell crew
- anolyte and catholyte temperature alarms > 80 C
October 6,1994 Dow Confidential Information
efp
DO A 037133 OONFrOFNTTAl'
Potential Problems Oxygen in hydrogen
Result: Explosion in hydrogen header ("pop" if minor in nature)
Incidents:
- 1993 Mod5 code problem resulted in no N2 purge on shutdown which lead to an explosion S-5/S-8 @ CA-2
- 1993 CA-2 Hydrogen log fire due to arcing at boot connection on S-8 hydrogen log caused by ground on series
- 1994 S-4 at Cl-1 plant; failure to bottle series before lowering head to stop under-cell leak.
- 1994 S-5 at CI-1 between cell leak caused loss of catholyte level; H2 ignited above caustic trap.
Preventative Meaures:
- Nitrogen purge activated in startup/shutdown steps for the hydrogen stacks
- Low nitrogen flow alarm at 200 lb/hr; normal rate 500 lb/hr
- Nitrogen valve position alarms
- hydrogen compressor shutdown -1.5 INWA instantaneous or 1/8 INWA for 2 seconds
- standard operating procedure to "bottle" series on all shutdowns (purges the cell with brine)
- off-line procedures for cell maintenance
- cell sprayers and housekeeping
October 6,1994
Dow Confidential Information efp
DO a
coMr rf