Document p2aEZ5yjD1LkJvpk6BM4kgeKk
Inter Ollice
Memo to Tile Subject: Visit to Johns-Manville's Jeffrey Mine,
Asbestos, Quebec on August 4-5, 1977
Engineering and Research Start August 24, 1977
In Attendance >
Johns-Manville - Robin D. Mallory, Supervisor, Technical Sales Service Joe McCarthy, Sales Manager Merton D. Webb, Manager, Engineering and Technical Services Mike Williams, Manager, Traduction Control Numerous production personnel
Ford
- A- E. Anderson, Engineering and Research Staff D. P. Cratcy, Materials Strategy R. K. Miller, NAAO Material Planning K. H. Weintraub, Engineering and Research Staff C. B. lelek, Vehicle Materials Planning
Ford visited Johns-Manville1s (J--M's) mine to review controls implemented to comply with Canadian asbestos lavs of 5 fibers/cc (U.S. standards are 2 fibers/ cc). This visit concluded a series of meetings and plant tours with suppliers of asbestos products designed to provide background necessary to evaluate Ford's need to develop non-asbestos brakes, clutches, gaskets, and transmission friction plates. A recommendation paper will be issued in September.
This communication vill comment on the mining and production operations and the apparent effectiveness of J-M's efforts to control airborne asbestos:
General Employment: 1976 Sales: Earnings: Open Pit Mine:
2,500 people, 6-day week, 3 shifts
$130 million
$30 million before tax
Approximately 1-1/4 miles across, 1,100 feet deep. Mine sides are sloped at approximately 30" with numerous spiral roads and "benches" providing access and work areas for trucks and shovels.
006121
PRODUCED BY FORD
Johns-ManyilleT s Jeffrey Mine
2
August 24, 1977
General (cone.)
Finished Product:
700,000 tons in 1976. Production projected for 1977 600,000 tons. Output in 1976 was increased due to customers increasing inventories and strikes at com peting companies. J-M produced at maximum capacity during 1976 and had to allocate its product.
Production Facilities: Two 12-story mills with combined floor space of approximately 2.2 million square feet.
Ore Moving Equipment: `
12 power shovels with 15 yard scoops. 60-100 ton and 4-200 ton capacity trucks costing about 5500,000 and SI million (each), respectively. The trucks are powered by 1200 HP diesel engines which power 2-450 HP electric motors on the rear wheels.
nationalization:
Agreement reached with Quebec Provincial Premier Levesque to permit J-M to continue operations. J-M agreed to invest $77 million over five years to expand mine and improve environmental controls.
As part of the nationalization discussion, J-M protested the increase in tax rate from 502 to 64%. Its mine taxes in Newfoundland are substantially lower. Quebec taxes for mineral extracting operations are higher than for ocher industries. Quebec reportedly is interested in having its asbestos processed into finished or semi-finished products within Quebec, and may offer tax incentives to achieve this-
J-M is exploring the potential for chrysotile asbestos mining in the Sudan. However it would be five years before production, should they decide to develop this source.
Background
The Jeffrey Mine commenced operations in 1873. It operated as a surface mine
into the late 1930's. Locomotives pulled ore-carrying railcars out of the pics.
Underground mining replaced open-pit mining in the late 1950's. Open-pit mining
started again m 1955 using large earth-moving trucks developed for St. Lawrence
Seaway construction.
'
The open-pit is being expanded and will increase in width approximately 1/4 mile in the next 2-3 years. -This expansion will allow the mine to increase in depth to about 1,500 feet in the early 1990's when additional expansion will be necessary.
The 1/2 mile wide core of prime asbestos ore at the center of the pit continues downward for a minimum of 500 feet more and is probably much deeper.
006122
PPnnnrwn nv mnn
Johns-Manville's Jeffrey Mine
3'
August 24, 1977
Mining Operation
Mobile drill platforms drill 6 inch holes for explosives. Blasting is controlled to limit dust and is performed twice each week.
Forty million tons of ore and overburden (rock and earth without recoverable asbestos) are minea each year. Thirty million tons of overburden is dumped nearby. Ten million tons of ore are processed. About 61 of this ore is processed into asbestos fiber.
t
Production
Trucks carry the ore to a gyrator crusher. The crusher has a 3,000 ton/hour capacity and is operating at between 1,500 to 2,000 ton/hour. The ore is reduced to a maximum of S inches in diameter and moved by conveyers to secondary crushers and dryers.
The ore is dried m 800F ovens. Asbestos fiber is then removed from the ore through eight successive crushing and air floatation operations. The longer and more crudy (larger asbestos bundle diameter) fiber is released in the earlier stages of processing Different grades of asbestos are produced by blending fiber from different stages of operation. More open fiber grades, chose with smaller fiber bundle diameters, are produced by mechanical re processing of the more crudy fibers. J-M markets approximately 90 grades of asbestos. The longest fiber grades sell for about $ 500/ton, the shortest for about $120/ton.
The newer of the two processing mills (700,000 square feet) was constructed in 1973 for $75 million. This mill is remotely operated from a control room chat permits either computer or manual control. A schematic of the total operation is outlined on a 20 x 40 foot wall with colored lights identifying equipment m operation. Production is controlled by a seven man shift - including supervision.
The older mill (1,500,000 square foot), constructed in 1954, has been updated to include a central process control room with manually operated remote con trols. It is run by a work force of 250 per shift. This mill completes the processing of asbestos, after initial processing by the newer mill, and packages the fiber for shipment. Most of the workers are in the packaging and shipping operations, the 100 pound bales are packaged in either polyethylene or paper containers and are automatically palletised.
Control of Airborne Asbestos Fiber
All equipment operating in the pit is air conditioned with filtration systems
to remove dust (although we observed truck drivers in the pits with their
windows opened). Drills are shielded with vacuum systems to control dust.
Uo dust was visible when we observed the drilling. Roads in the pit area
are watered to control dust.
,
006123
PonnTV*cr\ wtnsri
Johns-Manville's Jeffrey Mine
-4-
August 24, 1977
The gyrocrusher operator and production workers in the newer mill are in air conditioned and filtered rooms. Processing equipment and conveyers in the older mill are shielded and connected to low pressure ducts such that air leakage is into the equipment. This minimizes airborne fiber emissions. Only maintenance and Inspection workers are needed in this area.
J-M monitors asbestos dust levels at 110 different locations and pasts results ' on bulletin boards. A sample Of 37 readings identified 26 locations below
1 fiber/cc. Most other readings were clustered at 3 fibers/cc, with a few higher counts (9 at the underground conveyer and 13 at a closed maintenance shute). Fiber counts were low m those areas where workers were subject to continuous exposure (primarily the packaging and shipping departments).
Employes are instructed to vacuum prior to equipment maintenance or repair. However they do not always comply vich instructions. Maintenance workers were observed servicing equipment without using their respirators.
The older mill air floatation and dust control system is powered by 30 electric motors of 450 HP each, producing 5-6 million cubic feet of air flow per minute through 90,000 dust filtration bags. These bags collect 30 cons of material each hour. About 20% of this material ends up a product (asbestos floats), with the rest discarded as tailings.
A central vacuum system is regularly used to remove asbestos from floors and external parts of the machines.
Webb told us the maximum airborne exposure level for production employes is 3 fibers/cc. Asbestos exposure for maintenance personnel may appreciably exceed 3 fibers/cc for short periods. Maintenance personnel have respirators-
J-M demonstrated equipment (produced by Bel Tyne Company, England, which sells to Bendix, Raybescos, etc.) which automatically opens asbestos bales and dis penses the asbestos without worker exposure. J-M installed the equipment primarily to demonstrate low asbestos exposure processing to customers.
Employe Health
Some 150 J-M employes are receiving asbestos disability payments. This is 62 of the current work force. Employes receive 90% of their wages and are con sidered disabled with loss of 10% of lung capacity. J-M provides annual physicals for their employes and sends suspect individuals to a Montreal hospital for further examinations.
Lung impairment from asbestos does noc develop until as much as 20 years after exposure and since asbestos dust control is fairly recent, it is expected that cases of asbestosis will continue to be identified but at a decreasing rate. Environmental controls at the mine and mills are expected to greatly reduce lung disability.
006124
PRODUCED Rvrrron
r Jehns-Manville's Jeffrey Mine
-5-
August 24, 1977
Employe Health (cont.)
J-M commitment to spend $77 million over the next five years to expand opera
tions and improve the work environment indicates their confidence in resolving
asbestos issues. The Canadian Government is not expected to impose regulations
which the asbestos industry cannot meet with existing technology. Asbestos
represents 16-175 of Canadian exports.
'
A. E. Anderson
D. P. Cracty
R. K. Miller
006125
PRODUCED BY FORD