Document oq232vev4OMR2LvrLJXLNoLR
V
FRICTION PRODUCTS
MaReMONT CORPORATION
TOO WEST CAtOUNE ST. . TAMOING, OHIO 4SITt - TUPHONE Ml?) 3M-301S
February 3, 1976
Mr. Glen Butler *\rea Director Occupational Safety and Health Administration Federal Office Building - Room 734 234 Summit Street Toledo, Ohio 43604
REF: OSHA-1, No. 298
Dear Mr. Butler:
This is our fifth progress report for correction of alleged violations stemming from the inspection made on 8-14-75.
Items No. 2, 3, 5, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18 and 23 were reported corrected on the previous report.
The following is a report on newly corrected items and a progress report on the remaining item.
COMPLETED ITEMS
Item Number
1
Corrective Action Taken
Installation of two hand electrical safety controls on tl and #3 Block press was completed by the Koester Corporation on 1/31/76.
4 Labeling of disconnects in our Lining Department was completed on 1/31/76.
19 Installation of permanent wiring to power equip ment in our Finishing Department was completed on 1/31/76.
22 Fabrication of containers for disposal of empty asbestos bags, to be used in conjunction with impermeable bags was completed on 1/15/76.
MAR 001715
Glen Butler February 3, 1976 Page Two
Item Number 21
PROGRESS
Corrective Action Taken
A. purchase order for an adhesive pumping system will be issued pending approval from our cor porate offices- This item will be abated by 3/2/76.
Sincerely,
APS:llw
cc: R. Hemmelgarn
R. Treinen J. Sherr
A. P. Staszak OSHA and EPA Compliance Director
MAR 001716