Document ombNd5xqY34ymVqjNQwBaG3jr

ABDOO136549 ABERDEEN CHEMICAL PLANT INDUSTRIAL HYGIENE MONTHLY REPORT Month: May, 1986 Date of Report: June 24, 1986 I. ROUTINE CHEMICAL DOSIMETRY All Sample Results ' CHEMICAL < PEL NO. % > PEL (OVEREXPOSURES) NO. % VCM Lead Total Particulates 82 98.8 18 94.7 3 100.0 1 1 0 1.2 5.3 0.0 Overexposures JOB CLASS General Mechanic Color Weigh Compounder EXPOSURE * 1.7 ppm, VCM A 116.5 Micrograms Lead/MJ SOURCE Employee overexposed while repairing VCM leaks at the VCM tank farm compressor shed. Employee overexposed while weighing up Tribase XL, Tribase EXL, and Cyastab 988 in the Color Weigh Room. * Respiratory protection was worn. II. HAZARD COMMUNICATION PROGRAM Most of the month's industrial hygiene activity involved hazard communication. All compliance items were completed before May 25th. III. GILMONT PRECISION FLOWTUBE The calibration of the Gilmont flowtube used with Bendix air pumps during lead and total particulates dosimetry work was checked. No significant drift was seen. IV. PLASTICIZER BUILDING VENTILATION A study requested by Engineering was made of the air exchange rates inside the Plasticizer building. Measurements were taken with a "hot wire" velometer, first with all windows and doors open, and then again with all of them closed. ABDOO136550 Industrial Hygiene Monthly Report Page 2 IV. PLASTICIZER BUDDING VENTILATION - Continued The results, summarized below, showed that total air exchange in the reactor section of the building was roughly halved by closing all doors and windows, indicating a need for more makeup air during cold weather. AIR EXCHANGES PER HOUR - PLASTICIZER BUILDING Doors & Windows Open Closed First Floor 42.4 21.2 Second Floor 32.0 16.2 rah c: JF, JWW, DWH, PJK, WFH, TFL, VEM, RAF, AHS, CWT Tom Grumbles, J. R. Drumwright, M.D. - Houston ABDOO136551 ABERDEEN CHEMICAL PLANT CHEMICAL DOSIMETRY TRENDS