Document omZyaKgvJpb9pKXrMRoLDzn4g

American Society of Heating and Ventilating Engineers Guide7i935-- 2. The estimated maximum heat in Btu per hour required;to supply water heat or other apparatus to be connected to the boiler. eater8 3. The estimated heat emission in Btu per hour of the piping connecting the radiaf and other apparatus to the boiler. . t,0n Estimated Maximum Load: Construed to mean the load stated ' Btu per hour or the equivalent direct radiation that has been estimated the purchaser to be the greatest or maximum load that the boiler willV called upon to carry. (AiS.H.V.E. Standard Code' for Rating Steam Heating Solid Fuel Hand-Fired Boilers--Edition of April, 1932.) The estimated maximum load is given by8: --4.-The estimated increase in the normal load in Btu per hour due to starting up coin radiation. This percentage of increase is to be based on the sum of Items 1, 2 and 3 and the heating-up factors given in Table 2. Table 2. Warming-up Allowances for Low Pressure Steam and Hot Water Heating Boilers?! b,.c Design Load (Representing Summation of Items l, 2, and 3,d Btu per Hour Equivalent Square Feet of Radiation*! Up to 100,000 100,000 to 200,000 200,000 to 600,000 600,000 to 1,200,000 1,200,000 to 1,800,000 Above 1,800,000 Up to 420 420 to 840 840 to 2500 2500 to 5000 5000 to 7500 Above 7500 Percentage Capacitt to Add fob Warming Up .^ 65 60 55 50 45 40 "This table is taken from the A.S.H.V.E. Code of Minimum Requirements for the Heating and Venti lation of Buildings, except that the second column has been added for convenience in interpreting the design load in terms of equivalent square feet of radiation. bSee also Time Analysts in Starting Heating Apparatus, by Ralph C. Taggert (A.S.H.V.E. Transac tions, Vol. 19. 1913)* Report of A.S.H.V.E. Continuing Committee on Codes for Testing and Rating Steam Heating Solid Fuel Boilers (A.S.H.V.E. Transactions. Vol.`36. 1930); Selecting the Right'Site Heating Boiler, by Sabin Crocker (Healing, Piping and Air Conditioning, March. .1932). oThis table refers to hand-fired solid fuel boilers. A factor of 25 per cent over design load is adequate when oil or gas are used as fuels.1 d240 Btu per square foot. Other things to be considered are: --s~:---- .. {- 1' 5. Efficiency with hard or soft coal, gas. or oil firing, as the case may be. , 6. Grate area with hand-fired coal, or fuel burning rate with stokers, oil, or gas. 7. Combustion space in the furnace. 8. Type of heat liberation, whether continuous or intermittent, or a combination o( both. 9. Miscellaneous items consisting of 'draft available, character of attendance,1 pos sibility of future extension', possibility of breakdown, headroom in the boiler'room. Radiation Load The connected radiation (Item 1) is determined'by calculating the heat losses in accordance with data given in Ohapters,5, 6 and 7,.and.dividing by 240 to change to square feet of equivalent'radiation as explained in Chapter 30. For hot water, the emission commonly used is 150 Btu per square foot, but the actual emission depends on the temperature of the medium in the heating units and of the surrounding air.- (See Chapter 30.) Although it is customary to use the actual connected load in equivalent Square feet of radiation for selecting the size of boiler, this connected load usually represents a reserve in heating capacity to provide for infiltration in the various;spaces of the-building to be heated, which reserve, however, 412 Chapter 25--Boilers not in use at all places at the same time, or in any one place at all times. For a further discussion of this subject see Chapter 6. Hot Water Supply Load : When the hot water supply (Item 2) is heated by the building heating boiler, this load must be taken into consideration in sizing the boiler. The WEIGHT, LB. FUEL CAPACITY, LB.FUEL AVAILABLE, LB. FUEL DEPTH,IN 0160 651 414 FIXEO CARBON ASH SULPHUR MOISTURE BTU PER LB. 55.44 92..6M7. 5.00 13,655 Fig. I. Typical Performance' Curves for a 36-in. Cast-Iron Sectional Steam Heating Boiler, Based on the A.S.H.V.E." Code for Rating Steam . Heating Solid Fuel Hand-Fired Boilers allowance to be made will depend on the amount of water heated and its temperature rise. A good approximation is to add 4 sq ft of equivalent radiation for each gallon of water heated per hour through a temperature range of 100 F. For more specific information, see Chapter 35. Piping Tax (Item 3) It is common practice to add a flat percentage allowance to the equivalent connected radiation to provide for the heat loss from bare and covered pipe in the supply and return lines. The use of a flat allowance of 25 per cent for steam systems and 35 per cent for hot water systems is preferable to ignoring entirely the load due to heat loss from the supply 413