INTEROFFICE CORRESPONDENCE PLAINTIFF'S EXHIBIT MBL-273 DATE: March 13, 1938 TO: J. M. Murrin P. E. Eubanks J. L. Willis V. S. Soares CC: T. A. Monzitta PLANT ASBESTOS AREAS We have received the results of the samples sent out recently for asbestos tests. The attached is a list of locations in the plant which the tests indicate have asbestos present in the insulation. \ \ Also attached are copies of the Lab Test results. NOTE: This does not include areas previously shown to have asbestos such as Calciner Furnaces and Dowtherm. LKR/sf 0244Y L. K. Reno % 014?7n ATTACHMENT # 1 SAHP LE 19 22 23 24 25 29 30 31 33 34 35 37 45 46 47 48 49 53 54 55 57 58 59 2- - LOCATION One inch line in North end of Building ffl Pump discharge lino on old Dowtherm Unit, east side H-302 outlet line 8: Steam line across Neches Street at valve 8" Steam line at ?.5, 824 8" Steam line at P.5, 834 Steam line to Cooling Tower from East/West pipe rack Tracing steam line to P-407 waste pump H-402 sight glass insulation Low pressure steam line to T-401, 402, 206 and 207 150 pound steam line to Acrylics Low pressure steam line to Acrylics Two inch steam line to 2nd floor of #1 Building Four inch steam line to Catalyst Unit V-252 insulation at east and V-253 insulation at east end P-251 Discharge line V-248 insulation - south side . V-246 insulation P-254 Discharge Manifold P-247 to V-248 line P-247 to V-252 line P-247 to V-253 line P-257 to T-402 line % P-253 to T401 line 014277 64 65 66 67 68 69 72 81 82 83 85 88 89 97 101 103 104 105 110 LKR/sf 0244Y -3- P-243 co V-248 line Sluum Hue to l-m'*] Loading racks Sceam tracing lina ut; Ii-443 loading racks Steam tracing line to V-246 Steam line to P-259 (tempered loop) V-221 insulation P-253 discharge to suction line Steam line at A-l loading rack (North/South Tank Car Rack) P-176 Discharge line, at kA-1 spot Open four inch i ine at 8-2 spot, tank car rack One inch steam line at A-2 spot, tank car rack Four inch line to loading at east side of crossing Four inch line to loading rack at east side of crossing One inch steam line, southwest of V-250, below deck Four inch steam line to E-126 Three inch line south of V-250, 2nd floor Steam Line south of V-237, 2nd floor Six inch low pressure steam line south of V-237, 2nd floor pipe rack Composite sample from lay down yard % 914278