Region 6 - Enforcement & Compliance Assurance Division INSPECTION REPORT Inspection Date(s): Media Program: Regulatory Program(s) 11/06/2019 Water Brine - CWA Company Name: Facility Name: Facility Physical Location: (city, state, zip code) Mailing address: (city, state, zip code) County/Parish: Facility Phone Number Facility Contact: Milam Oil Corporation MacCullar Lease 33.266085, -92.508158 Old Union, Arkansas 71730 1605 Haynesville Hwy. El Dorado, Arkansas 71730 Union County 870-862-4258 John Milam jmilam@milamconst.com FRS Number: Identification/Permit Number: Media Identifier Number: NAICS: SIC: N/A N/A N/A 21111 1311 Personnel participating in inspection: Kent W. Sanborn EPA 6 ECDWE Environmental Engineer EPA Lead Inspector Signature/Date Supervisor Signature/Date Kent W. Sanborn Digitally signed by Kent W. Sanborn DN: cn=Kent W. Sanborn, o, ou=6EN-WR, email=sanborn.kent@epa.gov, c=US Date: 2019.12.11 11:41:11 -06'00' Kent W. Sanborn Date GUY TIDMORE Digitally signed by GUY TIDMORE DN: c=US, o=U.S. Government, ou=Environmental Protection Agency, cn=GUY TIDMORE, 0.9.2342.19200300.100.1.1=68001003655426 Date: 2019.12.12 11:06:29 -06'00' Guy Tidmore 12 DEC 2019 Date 6ENFORM-019-8 (10/31/2019) 1 Section I - INTRODUCTION Milam Oil Corporation / MacCullar Lease Inspection Date: 11/06/2019 PURPOSE OF THE INSPECTION EPA Region 6 inspector K.W. Sanborn visited the Milam Oil Corporation oil and gas facility located at latitude 33.256008 and longitude -92.523928 near Old Union, Arkansas on 11/06/2019 for an unannounced inspection. There were no representatives of Milam Oil Corporation present for the inspection. The inspection was conducted by authority of the Clean Water Act and the Safe Drinking Water Act to determine compliance with the Environmental Protection Agency (EPA) regulations. FACILITY DESCRIPTION This facility is located on the MacCullar Lease (Crain City). Section II - OBSERVATIONS I observed fluids in the secondary containment pit at the tank battery, which was full at the time of the inspection. I observed that there was about 6 inches of freeboard on the pit before the fluids would overflow. The secondary containment pit was leaking out of the southwest corner of the berms. I observed some surface damage south of the bermed area and facility due to brine leaking from the facility. With a calibrated YSI Pro 30 conductivity meter, I took a Total Dissolved Solids (TDS) reading from inside the secondary containment pit and it measured 1,200 milligrams per liter (mg/L). Section III - AREAS OF CONCERN The secondary containment pit was inadequate, full, and allowed fluids to leak from the facility. Section IV - FOLLOW UP EPA water enforcement will conduct a follow up inspection in approximately 6 months. Section V - LIST OF APPENDICES N/A 2 6ENFORM-019-8 (10/31/2019)