Document om4yNR8earMoLopwG53vLy5MR
AR226-2141
Z~*7 AV
mm
ATTACHMENT XIV
tS7*iUA*>K C 2
. du Po n t de N e m o u r s S. C o m pany
in Co r p o r a t c d
P. O . B o x 1217
P a r k e r s b u r g , W . V a . 26101
POLYMER PRODUCTS DEPARTMENT
CC: R. J . Burger
L . W. Goin A. C . Huston T. L- Schrenk
G. H. Stotz R. N. Taylor P. Thistleton
R. J . Z ip fe l
August 7 , 1981
J . W. RAINES
Polymer Products Department
Wilmington - B-5625
C-8 GROUND-LEVEL CONCENTRATIONS - WASHINGTON WORKS
A ttached is a report from R. I . Wevodau, Engineering Services D iv is io n , concerning C-8 ground-level concentrations for Washington Works. Concentrations o f C-8 were c a lc u la te d u sin g C-8 emission e stim a tes based on a cap acity production* and m eteorological data covering a fiv e -y ea r p e r io d .** Annual mean, eigh t-h o u r maximum, and 1-hour maximum C-8 co n cen tratio n s were c a lc u la te d fo r 2400 p o in ts in a receptor g r id . C o n cen tratio n s o f C-8 were c a lc u la te d for two cases:
t Case 1A represents concentration estim ates fo r the period before May, 1981.
Case 1 represents expected C-8 concentrations a ft e r the May, 1981 shutdown (when dryer stack h e ig h ts were increased by 15 f e e t ) .
In summary:
Case 1A and 1 annual mean C-8 co n cen tratio n s are w ell belo w the pro visio nal AEL o f 10 ug/m . The h ig h e s t Case 1A annual mean C-8 concentration is only about ^ 5% o f the p ro v isio n al. AEL. Since long-term accum ulation o f C-8 in the blood is a major concern, the annual mean concentration is the most important in d ic a to r o f p o te n tia l employee exposure.
* Actual C-8 em issions w ill be le s s since Teflon production does not always operate at cap acity.
** M etero rolo gical data c o lle c te d in the Parkersburg area between January 1 , 1973 and December 31, 1977
There's a world of things we're doing something about
EID07 9710
AJP002340
) 0 . W. RAINES
2- -
AUGUST 7 , 1981
a n r a <;p 1A and 1 eigh t-hou r average C-8 con cen tration s are ^ o w T h e ^ s U a ? AEL. The h igh est Case 1A e ig h t-h o u r average is about 83% o f the p ro visio n al AEL.
In cre a sin g dryer stack heights by ^ f e e t r e d u r e d th e expected annual mean C-8 concentrations a t the lb eoior+ori rpeeDtor p oints by an average 33%.
Attachment Addressee Only
JGL/nsw 0057M
;
Joseph G. Loschiavo
AJP002341
EID07 9711