Document oj7MJjoK77beXgO474R6R4D
TO FROM
Jim Barter Max Hekmat
DATE SUBJECT
July 3, 1990 Quarterly Report
Enclosed is the quarterly report of the Industrial Hygiene Monitoring strategy. As you will note, the report is divided into two parts, organic and inorganic, for the Lake Charles Complex.
The noise monitoring part of the strategy was estimated 515+ samples (1989) to review and update the Hearing Conservation Program. This number was revised in 1990.* I am pleased to inform you that the noise monitoring has been competed.
%W
Please let me know if I can be of assistance. '
MH/fq
cc: Ron Williams
/
Loren Anderson - G.O. ^
Bob McCorquodale
JUL ~ 91990
L
043005 Sb
INDUSTRIAL HYGIENE MONITORING STRATEGY QUARTERLY PROGRESS REPORT (ORGANIC SECTIONS)
Item
Department
'r Vinyl Chloride Tri-Ethane II
VCM II Tri-Ethane II Shop JCM II Shop Vinyl Loading Rack Barge/Ship Loading Dock Laboratory
TAS*
AS**
16 20 12 32 20" As Available
8
8 10
3 0 10 8 4
- Total Vinyl Chloride Samples Assigned are 108+
CPC1
CPC Unit Laboratory Maintenance Shipping
14' 6"
1512
0 0 0 0
- Total CPC Samples Assigned When Unit is Operational are 47
EDC Shipping VCM II Tri II Per Tri EDC/VDCM EC/HCL WTU
44' 23 34/ 22 22' 15 18 / 13 16' 10 10 7 32' 19
- Total EDC Samples Assigned are 176
Chlorinated Hydrocarbons
Derivatives General EC/HCL EDC/VDC Per-Tri Shipping Tri-Ethane II VCM II WTU EDC/VDCM
50-:- 31
- Total Chlorinated Hydrocarbon Samples Assigned for All Departments are 50+
Special Project
All
45+ 0
Date: 6/30/90 Percent
50 50 25
0 50 50 50
0 0 0 0
52 65 68 72 63 70 59
62
0
0A3006
Sk
WTU Surge Pond Closure Project (Not Part of I.H. Monitoring Strategy
878
* "TAS" Stands for Total Samples required by the strategy (Annual). ** "AS" Stands for Actual Samples Taken, up to the end of the reporting period
Unit was not operational.
SL 043007
INDUSTRIAL HYGIENE MONITORING STRATEGY QUARTERLY PROGRESS REPORT (INORGANIC SECTIONS)
Date: 6/30/90
Item Asbestos
Department
TAS*
Personnel Monitoring (Pit A) Maintenance (Pit. A) Area Monitoring(Plt A)
30 12+
6+ ^
AS**
1 10
4
Percent
3 83 67
- Total Asbestos Samples Assigned for Plant "A" are 48+
Personnel Monitoring (Pit C) Area Monitoring (Pit C) Maintenance (Pit C) Area Monitoring (Pit C)
18+ 12+^ . 12+y
6+'''
0 0 0 0
0 0 0 0
- Total Asbestos Samples Assigned for Plant "C" are 48+
Insulation Removal Laboratory
156 10+y
27 100% of requests 4 40
- Total Asbestos Samples Assigned to Insulation Removal Jobs & Laboratory are 166+
Chlorine
Electrolyzers Mercury Cells Chlorine "C" Shipping Laboratory
35^ 1
3
25y 0
0
20' 2 10
32/ 0
0
10 * 4 40
- Total Chlorine Samples Assigned are 122
Hydrogen Sulfide
Mercury Cell (Area) Brine
- Total Hydrogen Sulfide Samples Assigned are 22
8 14-
0 0
0 0
Mercury
Cell Operation Maintenance
- Total Mercury Samples Assigned are 50
34 16 i/1
0 2
0 13
Silica Crystalline
Sandblast ard "A" Sandblast Yard "C"
- Total Silica Crystalline Samples Assigned are 32
16^ 16 ^
8 8
50 50 -
SL 043008
I tem
Silica (Amorphous)
Department
Dryer Building Shipping - Packer Shipping - Shipper
- Total Synthetic Precipitated Silica (Amorphous) Samples Assigned are 73
TAS*
32 x 25 ' 16"
AS**
0 0 0
Percent
0 0 0
Welding Fume
Welding Shop "C" Area Welding Shop "CH Personnel
- Total Welding Fume and Oxides Samples Assigned are 40
20 y 20
2 1
10 5
Special Project
All
45+ 231
100% of requests
* "TAS" stands for Total Samples required by the strategy (Annual). ** "AS" stands for Actual Samples Taken, up to the end of the reporting period
^ Samples taken during Silica Furnace shutdown.
SL 043009