SUBCONTRACT
Job Number 27-4060 ,(5)
JMF/bc
Subcontract Nn. 27-4060-124
THIS AGREEMENT, made this 19thday ofOctober___________________________________
_ ig 72
by and between BROWN & ROOT, INC., a Texas Corporation, 4100 Clinton Drive, Houston, Texas, (P. O.
Box 3; 77001) hereinafter called the "General Contractor", and Sadler Industrial Services
P. O- Box 657
___________Telephone: (713) 482-3515
(Name. tret Addrw* and Telephone Number)
a----------------------------------------------------------------------------------------------------------------------------- with principal offices at (Give State of Incorporation and whether a corporation, partnership, or propnetorehlp)
Lake Jackson t State ofTexas n'ibf)____________________________________________________________ hereinafter called the "Subcontractor", WITNESSETH WHEREAS, Genera] Contractor has entered into a genera] contract with_________________
Ethyl Corporation
(Name of Owner)
hereinafter
called the "Owner", for the construction nf Expansion and modifications to present facilities -
Insulation Project 77491
(Nature of construction under Genera) Contract)
it. :
Pasadena,
Texas
(Cltr)
(State)
WHEREAS, Subcontractor desires to perform that portion of the work as required by the general contract, which is described below as "The Sublet Work";
NOW THEREFORE, it is mutually agreed by and between General Contractor and Subcontractor as follows:
I. SPECIAL CONDITIONS
1. The Sublet Work consists of: Furnishing all labor, materials, scaffolds, tools, equipment, supervision and other things as required to install insulation on towers, vessels, piping, and steam tracing loops as per Ethyl Corporation Drawings and Specification SP-60-3, as further described in Paragraph 5(a) of Subcontract Special Provisions, and in accordance with General Contractor's Project Manager's instructions.
-- Continued on Page 2 --
00200
( ) J. Page 2 of 9
Subcontract Nn. 27-4060-124
2. The price tor the Sublet Work shall be: a firm total lump Bum amount of THIRTY SEVEN THOUSAND EIGHT HUNDRED EIGHTY-EIGHT AND NO/100 DOLIARS ($37,888.00) which includes all applicable taxes but excludes the reimbursable premium for the required $37,888.00 Payment and Performance Bonds. (Invoice premium fee separately).
Price Breakdown:
Piping Equipment Piping Personnel Protection Steam Loop Personnel Protection Scaffolding
$21,000.00 12,309.84 1,424.16 500.00 2,654.00
TOTAL .......................... $37,888.00
3. The time of completion of the Sublet Work shall be as provided in paragraph 4 of the General Conditions but not later than December 16, 1972.__________ __________________________________________ ____________
4. The payment and performance bonds provided for in the General Conditions must be delivered before any work is performed by Subcontractor hereunder and no payment becomes due Subcontractor until such delivery, unless delivery at this time is expressly waived. Immediate Delivery of Bonds are: Waived; RequiredX
5. Other special provisions of this subcontract are: (a)
Insulation material to be installed shall be Pabco Fiberco Corporation insulation materials, which are an approved equal to materials listed in Ethyl Specification SP-60-3, and Super Cal-Temp material for hot insulation.
(b)
Applicable Drawings:
Equipment Drawings
thyl 33-11-107 Rev. 3 II 33-11-125 Rev. 1 II 33-11-126 Rev. 1 It 43-16-101 Rev. 5 II 43-16-105 Rev. 3 It 43-11-108 Rev. 1 II 43-13-109 Rev, 3 11 43-13-110 Rev. 3 II 43-11-117 Rev. 1 II 43-16-120 Rev. 2
Union Pump - C-A-720343G108 Goulds Pump - 104-622 * tl
It
Brown Fintube - C-538-72-1 " - C-53S-72-2
Southern HZ Corp,SE-1354-3 " SE-1356-4 " SE-1355-4
II tl
-- Continued on Page 3 --
Item P-5102 Item P-5104 A&B Item P-5121 Item P-5111 A&B Item E-5113 Item E-5141 Item E-5124 Item -5104 Item E-5121 Item E-5111
00201
*I.5(b) (Cont'd.)
Piping Drawings
41-51-101 41-51-102 41-51-103
41-51-104 41-51-105 41-51-106 41-51-107 41-51-108
Rev. 1 Rev. 1 Rev. 1 Rev. 1 Rev. 1 Rev. 1 Rev. 1 Rev. 1
43-51-109 43-51-110
43-51-111 43-51-112 43-51-113 43-51-114 43-51-115
Rev. 1 Rev. 1 Rev.' 1 Rev. 0 Rev. 0 Rev. 1 Rev. 1
41-51-117 41-51-118
41-51-119 41-51-120 41-51-121
Rev. 1 Rev. 0 Rev. 1 R.ev. 1 Rev. 1
43-51-122 43-51-123 43-51-124 43-51-125 43-51-126 43-51-127 43-51-128 43-51-129 43-51-130
Rev. 1 Rev. 1 Rev. 1 Rev. 1 Rev. 1 Rev. 1 Rev. 1 Rev. 1 Rev. 0
Subcontract No. 27-4060-124
41-52-135 41-52-13J5 41-52-137 41-52-138 41-52-139 41-52-140 41-52-141 41-52-142
Rev. 0 Rev. 1 Rev. 0 Rev. 0 Rev. 1 Rev. 1 Rev. 0 Rev. 0
43-52-143 Rev. 0
41-52-144 Rev. 1 41-52-145 Rev. 1
43-52-146 Rev. 1 43-52-147 Rev. 0
s
CO Subcontractor must furnish his own warehousing and miscellaneous workmen's supplies.
(O All inquiries the Subcontractor may have concerning this Subcontract must be made through the General Contractor's Project Manager and not directly to the Owner.
-- Continued on Page_3A_--
002C2
Subcontract Nn 27-4060-124 (e) Subcontractor shall contact the General Contractor's Project Manager to schedule and coordinate this Subcontract. <f) Before commencing work and before this Subcontract becomes effective, the Subcontractor shall furnish the General Contractor with his Payment and Performance Bonds and Certificate of Insurance.
-- Continued on Page__--
!0 H. GENERAL CONDITIONS
) Form BR1X-61 3/72 Page 4 of 9
1. Subcontractor represents that he is familiar with the physical conditions and availability of labor and materials in the area of the Sublet Work and all other items affecting the performance of the Sublet Work.
2. Subcontractor agrees to perform the Sublet Work in a careful and workmanlike manner, in accordance with the best construction practices and this Subcontract, and to furnish all supervision, labor, supplies, tools, equipment, facilities, storage, and materials (except as Owner or General Contractor specifically agTees herein to lumish) and all other things and services necessary or desirable to perform the Sublet Work.
3. General Contractor agrees to pay Subcontractor for the performance of the Sublet Work the amount specified in Paragraph 2 of Section I, and to make partial payments monthly to Subcontractor within fifteen (15) days after Subcontrac tor's invoices, approved by General Contractor's field representative, are received by General Contractor, except that General Contractor shall retain ten percent (10%) of the amount of each partial payment on the Sublet Work, until final completion of Subcontractor's work, and the balance shall be paid within thirty (30) days after final completion and acceptance of Subcontractor's work by Owner, upon a proper invoice submitted by Subcontractor accompanied by an affidavit that all bills lor labor, materials, taxes, services and other costs of the Sublet Work have been paid and indemnifying General Contractor and Owner therefrom and a release by Subcontractor of any further claims against General Contractor and Owner. Payment of any partial payment may be withheld until Subcontractor furnishes satisfactory proof of payment of all bills for labor, materials, taxes, services and other expenses in connection with the Sublet Work, and that all claims for changes or extra work have been settled. Until final completion and delivery of the Sublet Work, to the extent required by applicable law, all funds paid to Subcontractor shall be held in Trust for application solely to payment of laborers, materialmen, fabricators, subcontractors and others furnishing elements of the Sublet Work. Subject to performance by General Contractor of its obligations hereunder, title to all materials, components, fabricated items, and work in process intended for the Sublet Work, and the beneficial interest in all purchase orders or subcontracts therefor, shall vest in Owner immediately upon delivery to the job site, or identification to this Subcontract, or commencement of fabrication in Subcontractor's or a supplier's shop, or award of a purchase order or subcontract; provided, that this provision shall not relieve Subcontractor of the absolute duty to complete and deliver the Sublet Work in good condition, and to comply with all other obligations hereunder. All payments hereunder may be made by General Contractor's affiliated company and all such payments shall be considered as payment hereunder.
4. Subcontractor agrees to commence the Sublet Work immediately when Instructed and to prosecute same in coordi nation with the work of others and with sufficient equipment, supervision and manpower to insure completion of each part of the Sublet Work within the time of completion herein provided, so as not to cause damage or delay in the work of others. Subcontractor shall perform the Sublet Work at the times, and in the sequence directed by General Contractor, or Owner, from time to time; and, in the absence of such instructions from Genera] Contractor or Owner, at the times, and in the sequence reasonably necessary to avoid delay in the performance of the work required by the General Contract at whatever rate of progress General Contractor may make in performing the work directly or through other Subcontactors. In the event Subcontractor be delayed by the Owner, General Contractor, or another contractor performing work on the project, or by the ordering of extra work or by force majeure, General Contractor shall owe Subcontractor only an extension of time, and then only if written request therefor is made by Subcontractor within forty-eight (48) hours from the beginning of the delay.
5. If any part'of Subcontractor's work depends for proper execution or results, upon the work of any other contractor or Supplier, Subcontractor shall inspect the work of the other contractor or Supplier and promptly report to General Contrac tor any defects in such work, or the performance thereof that adversely affects the proper execution, and the obtaining of the desired results of the Sublet Work. Subcontractor's failure to inspect and report any such defects shall constitute an acceptance of the other contractor's or materialmen's work as fit and properly performed. Subcontractor shall endeavor to settle by agreement or arbitration, all claims asserted by any other subcontractor, materialman, or other person arising from Subcontractor's own acts or omissions, or in any manner relating to the performance of the Sublet Work; and In the event General Contractor or Owner shall be sued on any such claim. Subcontractor shall defend such suit, and pay or satisfy any judgment rendered therein against Genera] Contractor, or Owner, and pay all costs, including attorney's fees incurred by General Contractor or Owner.
6. Subcontractor shall, at Its own expense, procure all required permits and licenses, and pay all fees and charges, and give all notices necessary and instant to the due and lawful prosecution of the Sublet Work. Subcontractor shall comply with the requirements of any deeds and rights-of-way easement restrictions, and any permit requirement, and any instructions or regulations of any local, state or federal governmental agency or authority, and with the requirements of any one haring the right to control how any portion of the Sublet Work is to be performed; provided, however, that the Sublet Work shall be performed to the satisfaction of the General Contractor and Owner.
7. Owner and Genera! Contractor shall have the right to enter upon the site of the Sublet Work for the purposes of In.pection. accounting, and performing such collateral work as Owner or General Contractor may desire. Subcontractor agrees to furnish all facilities deemed necessary by the Genera] Contractor and Owner for the proper inspection of the Sublet
-- Continued on Page 5 --
xmsaatxsj!
00204
&8GHnBHSSHB8BMl39K,
0 .
Form BR1X-61 3/72 Page 5 of 9
Work and to account to the Owner and General Contractor for any materials furnished by Owner or Genera] Contractor | which are being handled by Subcontractor. Subcontractor nr\-e*-s to carry out such tests as are required by the Genera] Con
tractor to determine i/ the sublet work is being properly performed. Subcontractor shall protect the Sublet Work and bear * and be liable lor all loss or damage of any kind, including damage by the elements or otherwise to the Sublet Work or to ma
terials or other items furnished by Owner, or General Contractor to Subcontractor, which may happen at any time prior to the time that Owner formally accepts the Sublet Work. Subcontractor shall warrant the Sublet Work to be free from de fects in materia] and workmanship and agrees to make good at Subcontractor's own expense any such defects or any failure to perform satisfactorily, which are discovered within one (1) year from the time of acceptance by Owner of all the sub let work, or within one year from the time of commissioning by Owner of the Systems or Work to which the Sublet work relates, whichever is later. In the event of any such defects, Subcontractor agrees to consult promptly with Genera1 Con tractor or Owner to arrive at a satisfactory procedure, which, if possible, will enable the work to be kept in operation pend ing the correction of such defects.
8. Subcontractor agrees to indemnify and to save Genera] Contractor and Owner harmless from and against all claims, suits (including counsel fees and other expenses of suit) whether groundless or not, Judgements and awards on account of any damage to property or injury (including death) to person (including any damage or injury to the property or person of any employee of Subcontractor, General Contractor, or Owner) which may be caused or alleged to have been caused in whole, or in part by, or which may occur or be alleged to have occurred in connection with the performance of or while Subcontractor is performing the Sublet Work; provided that Subcontractor does not hereby assume responsibility for the sole negligence of General Contractor.
9. Subcontractor, notwithstanding the provisions of Paragraph 8, assumes all risks of loss or damage to Subcontractor's tools, equipment, or property from any cause, including the sole or concurring negligence of Owner, Genera] Contractor, or any other Subcontractor performing work in connection with the work described in the General Contract In the event Gen eral Contractor or Owner loans or furnishes tools or equipment to Subcontractor or permits Subcontractor aboard their vessels in connection with the Sublet Work, Subcontractor agrees (a) to make its own determination before commencing work that such vessels are seaworthy and such tools and equipment are adequate for the safe performance of the work by Subcontrac tor; (b) that such tools, equipment or vessel are loaned or furnished and accepted by Subcontractor without warranty or representation by General Contractor or Owner as to their condition; (c) to return such vessels, tools and equipment to General Contractor or Owner at the conclusion of such use in same condition as when received, ordinary wear and tear excepted; and (d) to indemnify and hold General Contractor and Owner harmless from all claims, demands, causes of action, damages and injuries from Subcontractor's use of said vessels, tools and equipment, including any claims, demands, causes of action, damages or injuries resulting from or alleged to result from .the sole or concurring negligence of General Con tractor, or Owner, or from the inadequacy or unseaworthiness of said vessels, tools and equipment for the performance of the Sublet Work. The assumption of risks and the indemnities in this paragraph 9 do not extend to the gross negligence or willful acts of the indemnitee.
10. In the event after seven (7) days written notice from General Contractor to Subcontractor, pointing out generally any deficiencies either in respect to the nature of the Sublet Work or in respect to the promptness with which the Sublet Work is being performed. Subcontractor has not corrected such deficiencies to the satisfaction of the Individual in charge of this job for General Contractor in the field, General Contractor shall have the right to supplement the work of Subcontrac tor or to take over completely the performance of the remainder of the Sublet Work, either with his own forces, or by contract with others. Subcontractor grants General Contractor the option to use all or any part of Subcontractor's tools, equipment, machinery, materials, and supplies then in use in performing the Sublet Work and in the event General Contrac tor elects to use all or any part thereof, no rental shall be paid or given therefor, and no credit accrues therefrom, except Insofar as the lack .of any rental charge thus reduces the cost of completing the Sublet Work. Subcontractor also expressly waives any claim which he could assert in connection therewith, for use of such equipment in whole or in part on other projects and any profits anticipated thereon during the period such equipment or any portion thereof are so utilized by Genera] Contractor in accordance with this provision. In the event the cost of supplementing or completing the Sublet Work is more than the amount of money Subcontractor is entitled to on the price basis provided herein, Subcontractor agrees to pay to General Contractor upon demand the amount of such excess cost, and in the event such cost of supplementing or completing the Sublet Work is less than the amount of money Subcontractor is entitled to on the price basis specified herein, General Contractor agrees to pay Subcontractor upon demand the amount of such difference between price and cost; provided, that if General Contractor shall supplement or omplete the work with his own forces, Genera] Contractor may charge Subcontractor with an additional ten (lOTd percent of the cost thereof. This right may be exercised from time to time as deemed proper and may be exercised even prior to the time specified for completion of the Sublet Work, and such exercise shall not be treated as a repudiation of this Subcontract, or interference with the Subcontractor in the performance of the Sublet Work, and the exercise of such .rights shall not be regarded as relieving Subcontractor of his duties in respect to the performance of the Sublet Work; nor shall the exercise or non-exercise of such right prejudice any other remedy the General Contractor or Owner may have, including, without limitation, those specified in the Genera] Con tract. Subcontractor agrees that the decision of the Project Manager ir. exercising the rights provided for herein shall be final and conclusive, but if Subcontractor objects and disputes the judgment of the Project Manager he may appeal there from, withir, said 7 day period, to an executive officer of General Contractor designated by the President of General Con tractor and the written decision of that designated officer after hearing Subcontractor shall be final absent actual fraud. Subcontractor agrees to cooperate fully with Genera] Contractor and not to complain thereafter of the manner or cost of supplementing or completing the Sublet Work.
-- Continued on Page 6 --
00205
3 Form BR1X-61 3/72
Page 6 of 9
11. The employees, representatives and agents of Owner and General Contractor shall not have the power to waive any obligations of the agreement between the parties for the performance by th- SuDcontractor of the Sublet Work in a careful and workmanlike manner as provided herein. No waiver by the Owner or General Contractor of any breach by the Sub contractor of this Subcontract, or of any term or condition thereof (whether such waiver be expressed or implied), shall be deemed to constitute a waiver of or consent to any subsequent breach of the same, or of any other term or condition of this contract
12. In the performance of the Sublet Work the Subcontractor is an independent contractor with the right to supervise, manage and control the performance of the details thereof, General Contractor and Owner being Interested only in the results of the same and being entitled to inspect the performance of the Sublet Work by Subcontractor only to the extent necessary to assure such results.
13. Subcontractor shall not subcontract the Sublet Work or any portion thereof, nor assign any portion of the monies due or to become due under the Subcontract, without the written consent of General Contractor, and any attempt at such Subcontract or assignment without such consent shall be void. No subcontract shall relieve Subcontractor of his responsibility hereunder.
14. All written notices between the parties shall be by mail, properly stamped, addressed and delivered to the postal authorities, and any such notice shall be effective at midnight of the day during which the notice is so mailed. Such notices shall be directed to the address shown on page one of this Subcontract, unless written notice has been given of a new address.
15. Subcontractor shall comply with all applicable laws, ordinances, rules and regulations of any governmental agency having jurisdiction, and with all terms and conditions of applicable permits, certificates, leases, restrictions, easements or dedications, and Subcontractor shall indemnify and hold harmless General Contractor and Owner from any fine, penalty, loss, damage or expense resulting from Subcontractor's failure to comply therewith. Subcontractor shall certify that all work is performed in compliance with the provisions of the Fair Labor Standards Act.
16. Subcontractor shall carry and maintain throughout the life of this Subcontract, at its own expense, insurance in not less than the amounts and coverage herein specified, and shall furnish certificates of such insurance in duplicate to General Contractor before commencing work. Certificates shall bear statements of insurors to the effect that insurance shall not be cancelled, reduced, nor allowed to expire, except upon thirty (30) days written notice delivered to General Contractor by registered mail. In the event Subcontractor sublets any pari of the Sublet Work, it shall be the duty of the Subcontractor to require that every such Subcontractor comply with the insurance and other requirements of this Subcontract. Insurance shall be placed with companies acceptable to General Contractor and Owner. Subrogation against General Contractor, Owner and other contractors performing work in connection with the work described in the General Contract is hereby waived by Subcontractor and the policies shall be endorsed accordingly. The minimum insurance shall be the following amounts and coverage:
a. Workmen's Compensation
Employer'sXiability (If marine operations are involved, endorsements shall include .U. S. Long shoremen's and Harbor Worker's Compensation Act, Outer Continental Shelf Operations and, subject to minimum limits of $250,000 per person and 500,000 per accident, Amendments to Coverage B Endorsement-Maritime (including liability for disease and wages, maintenance and cure).
Statutory $100,000 per person/accident
b. Comprehensive Genera) Liability, including coverage for liability assumed under this Subcontract and completed operations:
Bodily Injury ...................................................................................................................... $100,000 per person
300,000 per occurrence Property Damage ...............................................................................................................$100,000 per occurrence
Comprehensive Automobile Liability: Bodily Injury ................. .........
Property Damage
$100,000 per person 300,000 per occurrence $100,000 per occurrence
-- Continued on Page 7 --
00206
;)
IX Marine vessels are Involved: Hull Insurance................................... Protection end Indemnity Insurance
General Contractor and Owner shall be named as Assureds under such Hull and P&I, with respect to operations performed under this Subcontract
e. Other:
Form BR1X-61 3/72 Page 7 of 9
Full Value of Vessel .Full Value of Vessel but not less than $500,000.
17. There shall be no change in the unit prices, If any, described in paragraph 2 oX Section I of this Subcontract due to any variances between estimated and actual quantities oX the Sublet Work, and there shall be due and owing Irom General Contractor only such sums as result from the application oX the unit prices, iX any, described in that paragraph, to the quantities ol the Sublet Work performed, lor which General Contractor received payment from the Owner.
18. Subcontractor shall keep the premises under his control neat and orderly at all times and shall remove all trash and debris daily and at the end oX the contract.
19. Subcontractor agrees to Xumish payment and performance bonds within ten days should General Contractor so request in writing, whether before commencing the Sublet Work or at any time before completing the Sublet Work. Such bonds shall be in form and with corporate sureties satisfactory to General Contractor, and in such amount as may be spec ified by General Contractor as adequate to cover performance of the Sublet Work, and any damages that may result from the breach of this subcontract IX immediate delivery is required by the Special Provisions, Subcontractor shall pay the premium; If immediate delivery is waived by the Special Provisions, General Contractor shall pay the normal premium, if the bond is required by General Contractor at a later date.
20. Subcontractor shall conform to the highest standards of safety practices in performance of the Sublet Work and shall conform to all safety practices and requirements of Owner or General Contractor. The Subcontractor warrants that any and all work performed and/or equipment delivered to General Contractor or Owner or its designee under this subcontract shall comply with all requirements of the Occupational Safety and Health Act of 1970, as the same may be amended from time to time and including all regulations adopted pursuant to such Act, and shall comply with all requirements of any applicable health or safety statute or regulation of any state or local government agency having jurisdiction In the location to which such equipment is to be shipped or such work is to be performed pursuant to this agreement Subcontractor shall be solely responsible lor compliance with all such laws or regulations without relying upon enforcement thereof by, or instruction of, Owner, Engineer or Genera] Contractor and shall promptly report in fuU to General Contractor any safety or health Inspections by governmental authorities.
21. The entire agreement between the parties with respect to the work on this project is expressed in' this written Subcontract, and it is agreed that this Subcontract has not been based upon any oral representation, promises or state ments of any one representing General Contractor or Owner, and that this agreement is therefore based entirely upon the written documents constituting this Subcontract between the parties, and supersedes all proposals and negotiations not expressly set forth herein. It is further agreed that this agreement shall not be changed, modified, abrogated or super seded by any subsequent agreement unless it be in writing and signed by both parties. In the event a Purchase Order, Work Order or other similar document is utilized in conjunction with this Subcontract, it is understood that any printed provisions of such other document have no application and that the printed provisions of this Subcontract form are controlling, but the typewritten or handwritten provisions of such other document shall constitute a part hereof and shall be construed with all of the printed, typewritten and handwritten provisions hereof. Any requirement shown on the drawings, but omitted from the specifications, or any requirement shown in the specifications but omitted Irom the drawings shall be considered as being required under this agreement as if set forth in both.
22. Should there at any time appear to be variation, contradiction or want of agreement in description, dimensions or juantilies of the Sublet Work, Subcontractor agrees to refer immediately the matter to the Genera] Contractor for decision before proceeding with the Sublet Work in respect of which the said variation, contradiction or want of agreement exists.
-- Continued on Page 8 --
00207
{ Form BR1X-61 3/72
Page 8 of 9
The true intention and meaning of the Subcontract shall imply that the Subcontractor will in all aspects, supply, construct and complete the Sublet Work in a workmanlike manner fully satisfying the intended function of the sublet work to the * satisfaction of General Contractor. All work which is manifestly necessary to carry out the intent of the drawings and specifications pertaining to the Sublet Work or which is customarily done in performing this type of work for the Owner or General Contractor shall be performed by the Subcontractor as a part of the Sublet Work.
23. General Contractor may at any time by a "Change Order" in writing, signed by General Contractor's authorized representative, and without notice to the sureties on any bond, change or issue additional instructions, change or issue addi tional specifications and plans, and change, omit or require extra or additional work to be performed by Subcontractor. In such event. General Contractor will have full authority to specify the amount and kind of work to be done, or omitted, the materials to be used, and the equipment to be furnished as fully as though such changes had been set forth in this subcon tract. When any change order shall authorize extra or additional work, Subcontractor shall make every effort to complete the sublet work as changed within the time originally agreed upon for completion, the time for completion not being extended unless expressly extended by General Contractor in writing. The General Contractor is authorized to make changes in the work which do not significantly increase the cost of the sublet work without the Subcontractor being entitled to any additional compensation therefor. If such change orders significantly increase or decrease the cost of the sublet work to Subcontractor, there shall be an increase or decrease in the consideration to subcontractor (1) in accordance with the unit prices specified in this subcontract agreement or, if General Contractor agrees that the unit prices are not applicable, either (2) pursuant to a lump sum proposal acceptable to General Contractor or (3) by the actual direct cost to Subcontractor of such change in the sublet work plus ten percent thereof, which costs directly related thereto will be supported by approved payrolls and paid invoices on additions to the sublet work and by agreed estimates of labor and materials deleted for decreases in the sublet work. Subcontractor further agrees that no extra work, or changes in the Sublet Work, or in the Subcontract will be recog nized or paid for, unless agreed to in writing and approved by General Contractor and Owner, before such work is done or such changes are made.
24. Subcontractor agrees that it will not discriminate against any employee or applicant for employment because of race, color, creed, national origin, or sex. Subcontractor agrees that it will comply with all applicable Federal, State and local Fair Employment Practices Act, or similar Act, Rules and Regulations, and whether or not applicable will comply with the Federal Civil Rights Act of 1964. The terms and provisions of Executive Order 11246 and any Executive Order modifying or superseding same, are incorporated herein with respect to any Sublet Work subject thereto.
25. Regardless of any provision hereof or of any approval hereof the Owner is not a party to this Subcontract and the Subcontractor agrees that the Owner is under no obligation to Subcontractor.
26. Subcontractor agrees to indemnify and save General Contractor and Owner harmless from claims growing out of patent infringements or claims thereto pertaining to the use of any tools, construction equipment or construction processes or technique by Subcontractor in the performance of the Sublet Work.
27. Subcontractor undertakes, on behalf of itself, its related companies and its or their employees, contractors, suppliers and agents, not to disclose to any third party or utilize except in connection with the performance of the Sublet Work, without Owner's prior written consent, any details of "know-how" and specialist or technical information pertaining to the work (whether or not the property of Owner) which may come into its or their possession in the course of or in connection with the performance of the Sublet Work, provided, however, that the foregoing shall not apply to "know-how" and spec ialist or technical information which (I) was in the public domain prior to its or their receipt thereof in the course of or in connection with the performance of the Sublet Work or which subsequently becomes part of the public domain by publica tion or otherwise except by its or their wrongful act, (ii) was In its or their possession prior to its or their Teceipt thereof in the course of or in connection with the performance of the Sublet Work or (1U1 are the same as information received by it or them from a third party having no obligation to Owner of secrecy with respect thereto.
28. All disputes, controversies or claims arising out of, relating to, or in connection with the Subcontract or the breach thereof, including, but not by way of limitation, any dispute as to the amount due Subcontractor by General Contractor, shall be finally settled by arbitration in accordance with the Rules of Conciliation and Arbitration of the American Arbitration Association by the arbitrators appointed in accordance with such Rules. The arbitration shall be held at a location at General Contractor's option. Judgment upon the award rendered may be entered in any Court having Jurisdiction or application may be made to such Court for a judicial acceptance of the award and an order of enforcement, as the case may be. This clause shall be construed under the laws of the sites of performance of the major portion of the Sublet Work.
29. Wherein any Certificate or Progress Payment invoice of which Subcontractor has received Payment there has been included the value of any unfixed materials, equipment or other Items intended for or placed on the site of the work, such items shall become the propern' of Owner (for loss or damage to which Subcontractor shall be solely responsible) and such items shall not be removed except lor use upon the Sublet Work without the written authority of the Genera) Contractor, noreover, construction plant and equipment brought onto the site for the purpose of performing the Sublet Work shall not be removed therefrom until completion of tne Sublet Work without the written consent of the Genera] Contractor.
-- Continued on Page 9 --
00208
a.
Form BR1X-61 3/72 Page 9 of 9
Subcontract No. 27-40o0-124
30. The Subcontractor shal] be responsible for the correctness of the positions, levels and dimensions of the Sublet Work according to this Subcontract and the written instructions of the General Contractor, notwithstanding that the Subcontractor may have been assisted by the General Contractor or any other Contractor in setting out the same; and If at any time during the performance of the Sublet Work any error shall appear or arise therein, the Subcontractor shall, on being required to do so by the General Contractor, remove and change the Sublet Work to the satisfaction of General Contractor.
31. Except as otherwise expressly provided, this Subcontract shall be construed under the laws of the State of Texas.
32. This Subcontract consists of Pages