CHEVRON U.S.A. INC. ENGINEERING DEPARTMENT - EL PASO, TEXAS CONTRACT NO. C-I5-070-80 SPECIFICATION NO. EP-407-N October 7, 1980 Page 1 of 3 SPECIFICATION NO. EP-407-N INSTALLATION AND REPAIR OF INSULATION OF VARIOUS PIPES EL PASO REFINERY 1.0 Scope -=L 1.1 CONTRACTOR shall furnish all necessary'labor and equipment to repair insulation and/or to insulate various lines in the El Paso Refinery. 1.2 This specification supplements the Contract Terms and Conditions (Form GO-279). In theaevent any discrepancy exists between this document and said Terms^and Conditions, the provisions of the latter shall be controlling. 2.0 General .. - 2.1 CONTRACTOR shall abide y the rules and regulations as set forth in Refinery Instruction No_f:1404, "General Instructions to Contractors Working Within the Refinery," revised 8/80, which will be part of the contract. 2.2 A COMPANY representative^will be assigned to administer the details of the contract for a giveniarea of the refinery. He will be the sole contact between the CONTRACTOR and the COMPANY for that area. 2.3 CONTRACTOR shall expedite the work as much as possible, executing it in a neat, orderly, workmanlike manner. CONTRACTOR will leave all work areas neat and clean. 2 .4 All work will be initiated by COMPANY on Authorization to Perform Work, MFG-2649. == 2.5 Work will be located throughout the refinery and shall be performed over an extended period of tfSe. The exact extent and design of the work will be specified by COMPANY before work shall begin. CONTRACTOR shall be paid piece rate for workTperformed according to bid price schedule. 2.6 Any equipment requirement^ service, or additional instruction to CONTRACTOR that does constitute a contract change must be transmitted on a "Change" Form GO-283. The "Change" may be initiated by the COMPANY representative but requires a signature of approval at the appropriate level of authority beforreTthe agreement may be commenced. Example: A "Change" would be required for the COMPANY to authorize a change in piece rate prices. 3E- CHEV BB CHEVRON U.S.A. INC. ENGINEERING DEPARTMENT - EL PASO, CONTRACT NO. C-15-070-80 SPECIFICATION NO. EP-407-N October 7, 1980 Page 2 of 3 TEXAS 2.7 Scaffolding Scaffolding, when required, will normally be erected by the COMPANY. COMPANY may elect to have required scaffolding erected by CONTRACTOR, In this event, COMPANYAwill supply scaffolding and CONTRACTOR shall be reimbursed at an hourly'rate to be bid on Contractor's Bid Sheet, Exhibit A. All scaffolding erected by CONTRACTOR will be inspected and approved before work shall commence. Scaffolding must meet OSHA re quirements . zl_ 3.0 Details of Work 3.1 Insulation shall be 1 T/2" thick Hydrous Calcium Silicate (Kaylo, Thermobestos, Kaythem,~Caltemp, or equivalent) with .016 inch thick aluminum waterproof jacketing for lines 8 inches in diameter or larger. 3.2 Insulation shall be 1 inch thick Hydrous Calcium Silicate with .016 inch thick aluminum waterproof jacketing (Kaylo, Thermobestos, Keythem Caltemp, or equivalentJ"for lines 6 inches in diameter or smaller. 3.3 All insulation repairszffhall restore pipe insulation to original speci fications or better 3.4 All insulation on previously uninsulated pipe shall be single layer and match or exceed Specifications 3.1 and 3.2. 3.5 Insulation shall be installed per Sgecification 6A-N99783-4 "Standard Insulation for Hot PipTfflg Below 650 F", which is included in this speci fication. 4.0 Contract Price ss 4.1 COMPANY agrees to compensate CONTRACTOR for service and equipment as outlined in Contractor's Bid Sheet Exhibit A, which will be part of this contract. Bid prices are to include all profits, taxes, and overhead and shall be fBx the duration of the contract. 4.2 In the event of any incBease or decrease in any service rate or equipment rate prior tdzthe termination of this contract, CONTRACTOR shall notify COMPANY ofithe changes by submitting new rate proposals, in writing, for approval. Acceptance by COMPANY may be in whole, or in part, and single service rates or equipment rates, as well as the entire proposal, may beisubject to negotiation and compromise prior to acceptance of a modification or contract by COMPANY. No change will be considered approved until a duly authorized Contract Change Form (GO-283) is processed. It is the COMPANY'S intent that all CHEV BB 01basn CHEVRON U.S.A. INC. ENGINEERING DEPARTMENT - EL PASO, TEXAS CONTRACT NO. C-15-070-80 ! SPECIFICATION NO. EP-407-N October 7, 1980 Page 3 of 3 CONTRACTOR equipment rates and service rates be competitively bid for the duration of the contract and not subject to negotiation unless there are unusual cirSCTmstances. 5.0 Accounting of Contract CosS^ 5.1 CONTRACTOR shall keepVgn accounting of all services furnished to COMPANY and shall submit, upon request, information as required by COMPANY. " 5.2 Invoicing Instructions'll 5.21 COMPANY agrees teg- compensate CONTRACTOR for service and equipment as outlined in Contractor's Bid Sheet, Exhibit A. 5.22 CONTRACTOR agreeffrto the fixed unit bid price, as quoted in Contractor's BiATSheet, Exhibit A, for installation and repair of insulation, whrich shall be for the duration of the contract. 5.23 In the event of .an increase or decrease in any service rate or equipment rate plSLor to the termination of this contract, CONTRACTOR shallziollow procedures as outlined in 4.2. 5.24 CONTRACTOR shallAprovide, at COMPANY'S request, a list of insulation repairll and/or installation completed or in progress by CONTRACTOR. 5.25 CONTRACTOR shall, Afor COMPANY'S accounting purposes, furnish invoices in accordance with Paragraph 2.41 of the Contract Terms and Conditions, Form GO-279-GEN. 5.26 CONTRACTOR shallAEurnish four copies of each invoice when submitting a bilLJ:o COMPANY for payment. 6.0 Informatives ^ 6.1 The following blank COMPANY forms are included with this specification for CONTRACTOR'S information. 6.11 Authorization to .Perform Work, Form MFG-2649. 6.12 Contract Change, Form GO-283. CHEV BB TO P CO rH cTO CO H -ee- s 0 > CO t 0rH 0 > i--i ]& 0 >o J2 No. CM 00 <ap IN IN O O r-l O rH rH CD LD O Otfc_ t"- CO ID OJ CM CO i--I rH r--} o ID O rH O O 502 CO <w OOO PQ O CD CO )2 oPi ho OOP fcn 8O 50- 0 P ft ft H a. X 0 TO p -P ft CO ft < to P0 0> X rH B cd 3> c * * CO CO 0 00 o P X---N Ic 0 * -P 0 -p CO cd N CO 5 e H H 0 H CO TO X) X rH 0 0) i--1 0 u c rH a H cd <H ex >-4 o cd o o O' LD o c ss o CD CO ID ^r CO CO 00 LO CD 'M* CO rH ^3 r--1 ID -i ==. --- * -- CO ----- *- ^ c --- <--CO c 0 C 0 ,--^ 0 H -p ,--\ /--s M5^i x--S CO CO zjfi- CO ----\ X--N x----^ X--. CO CO CO o H CO a c C, c0 cCc H -p C 0 o O oC oo0 p o 0 CO H H -3^ *H c H *H H o 0 H -P -P P rH 4J -P iJ 0 CO .P 0 O o o P bob 0 b -P 0 0 pu 0 o 0 0 0 0 0 0 CO CO j? CO 0 CO CO CO 0 p CO u --- --- CO -P 0 0 0 0 ^0T 0 /--s 0 0 0 0 G 0 CX -U P -P 0 c -P JJ -p G 0 P 0 0 0 ail 0 p o 0 0 0 0 CX a0 0 CO CO <3* o (--1 0 CO U 0O a r--I 0 --CO UP *0 CX 0 _"8X 0o 00 CO CO ZST 0 =^- 0 H U -P 0G CX 0 0 CO CO uuU 000 CX CX CX 000 CO CO CO ---- ; CO Cvi SL o rH CM CM CO o CM CM cm jst CM CD >_X >-- *--* " --' \ ---* n-- ----- CM' sT rH :--p z z z z N\ z z - 35^. z CM LD CO o rH CO i--i t--1 CM CO CD CO rH rH rH t--1 ee CM O OLDl -aoH; cGu 0 -p o 69Eh C O H -P CM a O0 1ft X. r0 a bO cc o H 03 rH 4J 0 h Ch Ch 0 CQ O' o Q CO 0 P CM U M ^--1 o Ch CO >> 3 <--1 CO O Cl) 0 0 -P 4J c tu a rH H 0 U rH X >5 0 o rH ou CO ft 3 sH ft O < CHEVBB Specification No. EP-407-N Pipe Insulation Chevron U.S.A. Inc. PLANT NO. 1-4 STILLS Symbols: MI - Missing -JT IC - Covers DI - Damaged 1 DI East pipe trench 15-fTsteam line Estimated Length 14" 2 MI East pipe trench 11 OZIine (where line was cut going 3' to old Perco Area ' 3. 14" line 110# going feG 3204 pump 39' 4. MI East pipeway on 1 5#;0vhere line was cut going to Perco Area. 14" 5. IC 15# Valve west of reTLux crude stripper MG 3203-E 6 IC T10 Valve west of reffux crude stripper MG 3203 E 7. DI Stabilizer reboiler condensate out 8. MI Northwest of furnaceSB541 where snuffing steam connects to 110# steSfh line 9. MI Northwest of furnace3&541 (pipeway) #15 line 6" 23*' 2' 10. MI 1 1 . DI Northwest of #4 feedipumps (pipeway) 15# line Steam valve going to F-3201 and line connected to it, northwest of FP5201 2# 2' 12. IC Inlet steam valve to #A Kero Stripper 13. Tar going to storageTfpm exchangers on #2 and #3 lots crude units is not insUCated all the way to C pipeway. Yet at C pipeway it blEomes insulated again. Lots of heat loss . "*- ,Line Size 8" 6" V4" 6" 6" 3" 6" 6" 6" 2" 2" CHEV BB D194R3 Specification No. EP-407-N Pipe Insulation Chevron U.S.A. Inc. PLANTNO. 141 RHENIFORMER ' Symbols: MI - Missing ICC - Covers DI - Damaged Estimated Length 141-1 IC West side of E-413TB, one foot above grade, Recycle Feed E-4133TB 141-2 MI West side of E-413fTD 1' above grade. Recycle feed to E-4131 D 2' 141-3 DI East side of E-413f"D 1 1 above grade. Effluent our of E-4131 -D ^ 2' 141-4 DI 1 O' north of PRC-13H, 20' above grade. 110# steam to G-4133 Mechanical Seals. 141-5 DI One foot north of K-4334-A filter, recycle Hg suction to MK-4131 iSiream tracing. 3' 141-6 DI Three feet west of DP4136, 20' above grade, steam tracing to recycle Hgjsuction. 2' 141-7 DI Plant boundary 20' above grade. 110# steam from D--4197. ` 2' . Line Size 10" 10" 10" 2" 3/4: 3" PLANT~T42 RHENIFORMER ~Feed Treating 142-1 DI Plant Boundary 11 0#5eteam line under walkway 142-2 DI 8' north of G-4199, TT0# steam leads to FR-480 3' 4' ! 142-3 IC South side of TG-415ff, 110# steam inlet valve to APS 142-4 MI East of TG-4156 20' above grade. 110# steam to TG- 4' , 4156 =- 142-5 MI K-4150 compressor St deck, above E-41 55 1 10# steam to vacuum jetsF 10' ' - 6" 2" 3" 1" CHEV BB 012484 Specification No. EP-407-N Pipe Insulation Chevron U.S.A. Inc. PLAN-nNO. 142 RHENIFORMER __________Feed Treating Symbols: MI- Missing " IC - Covers DI - Damaged 142-6 IC Northwest side of KF4150, bypass steam valve to K-4150 400# steam" Estimated Length 142-7 MI K--41 50 Turbine head:- 142-8 DI South of surface condenser cooling water valves cooling HgO to PI-404 142-9 DI South side of TG-4122, 100# steam to TG-41 52 3' 142-10 DI East of C-4190, TRG-41 5 A&B 142-11 DI South of D-4193, glass on D-4193 142-12 DI Bottom of D-4197, condensate to boilers 4' 3' 4' Line Size 6" _ 1" 1 Jg" 1 8" 2" CHEV BB 012485 Specification No. EP-407-N Pipe Insulation Chevron U.S.A. Inc. Symbols: PLANTNO 116 NO 6 CRUDE UNIT MI - Missing g IC - Covers DI - Damaged Estimated Length Line Size 116-1 DI 15' east of D-1620 No. 6 Plant boundary about 10' above grade. Debut reboiler condensate. 8' 3" 1 16-2 DI 15' east of D-1020 No. 6 Plant boundary about 10' above grade. FCC CTTG. to V.F. Bottoms 1 5' 2" 116-3 DI Same location as above. Vac Col. btms to F.O. 116-4 DI Same location as above. Condensate to D-1020 116-5 DI 10' west of MG-1616SA, 3' above grade, 110# steam to E-1635 and:Deprop. Btms to a from E-1635 _ '' 2' 3' 18' 6" 4" 2" 116-7 DI North side of E-162fETl5' above grade. 1 10# steam to Deprop Reboiler.~~ 10' 6" 116-8 DI North side of E-162SE:10' above grade. 1 10# steam to Deprop Reboiler deck. 12' 1" 116-9 MI Bottom of E-1625 5'Labove grade. Deprop Reboiler bottoms line. LA 2' 10" 116-10 DI On top of E-1625. Deprop Reboiler top circulating line. =5A- 2' 18-20" 116-11 DI 8' north of D-1681 TS1 above grade. Condensate line to D-1020. IT 3' 2" 116-12 DI 15' above grade in the middle of pipeway. Same as line above. -A 3' 2" 116-13 DI 3' above D-1681 andjgo south. 110# condensate 45' 2" 116-14 MI On top of E-1622. D3H5ut Reboiler 2' 18-20" 116-15 MI Bottom of E-1622. debut Reboiler 3' 12" CHEV BB Specification No. EP-407-N Pipe Insulation Chevron U.S.A. Inc. Symbols: PCANTNO. 116 No. 6 CRUDE UNIT MI - Missing --- IC - Covers DI - Damaged Estimated Length 116-16 MI South of E-1622 about 10' above grade. Condensate from Debut Reboileff 12' 116-17 DI 7' above grade and proceeds east of D-1604 water leg . Foul HqO . TL 46' 116-18 DI 2' north of MG-1615A and 15' above grade. Debut Reboiler condensatST , 20' 116-19 DI 1 01 SE of PRC-16-129 about 15' above grade. 400# steam line. ~ 2' 116-20 DI 25' east of north dosir of old No. 6 control house and 15' above grad# G.O. to V.F. bottoms line. 1' 116-21 DI Same location as above. Vacuum Flasher bottoms line 1 " 116-22 MI 3' south of furnace "Snuffing steam header. 3' on both sides of steamfErap. 110# condensate. 116-23 DI 25' west of G-1602 ^SBout 1 5' above grade. V.F top reflux line. -1= 4' 116-24 DI On F-1602 burner deck, east side, about rail high level. 110# steam 55 steam station. 3' 116-25 DI 10' SE of back pressure gas controller to F-1601 and 15 above gradeTAtmos bottoms line. 2' 116-26 DI Same location as above. Vacuum Flasher bottoms recirculating line. CL 6' 116-27 DI Under F-1602, fueluSil and steam lines to burners 16' 116-28 DI Between F-1601 andvF-1602 about 12' above grade Superheated steam la vent. 1 5' Line Size 3" 1 #' 3" 6" 2" 6" 2" 4" 2" 4" 4" 3/4' 4" CHEVBB Specification No. EP-407-N Pipe Insulation Chevron U.S.A. Inc. PLANT NCX 116 No. 6 CRUDE UNIT Symbols : MI - Missing W IC - Covers DI - Damaged Es timated Length 116-29 DI Between F-1601 ancFF-1602 about 12' above grade 400# steam to passes. 2' 116-30 Dl Same location as above. F.O. Circ. tine 2' 116-31 DI Bottom of C-1603 about 10' above grade. Super heated steam headerrr 2' 116-32 DI Bottom of C--1601 west side, C-1605 bottoms FR 116-33 DI 8' NW of D-1602 first deck, NHq header. 116-34 MI Top deck of C-1 603->^FRC-1 41 . Feeds C-1603 116-35 DI 6' SW of E-1607 A&ff, FRC-1 06 inter reflux 116-36 DI South of E-1603. Steam tracing 20' 5' 6' 2' 5' 116-37 DI SE and top of E-160A. VF heavy gas oil, shell side 2' 116-38 DI 20' SW of E-1601 ASB on atmospheric column. Level col. by overflash feecf. 5' 116-39 DI SW side of C-1602 top deck. V.F. top reflux line 116-40 DI SW side of C-1602 j-Thter reflux at column 30' 8" 116-41 DI SW side of C-1602 SO-' north of E-1616, V.F. over flash " 8' 116-42 DI South of E-1 61 6 ancCSouth of E-1 617, 110# steam to jets. 1# 116-43 DI Discharge of MG-1 A, HSR 36' 3' 116-44 DI Northeast side of CE2*B03, level column 3' Line Size 3" 2" 3" 2" 3" 3" 6" 1/2" 6" 3" 4' 4" 4" 2" 3" 3" CHEV BB n-19/tRR ^Specification No. EP-407-N Pipe Insulation Chevron U.S.A. Inc. PLANT ND 116 No. 6 CRUDE UNIT Symbols: MI - Missing yfj IC - Covers DI - Damaged Estimated Leng th Line Size 116-45 DI North side of C-16C23. Level Gage Glass 2' 116-46 DI 20' Northeast sidevof C-1603. 110# steam to G-1638 seal. ^ 3' 1" 116-47 MI Under E-1611, blowdown condensate 26' 2" 116-48 DI Turbine side of TG-1602. 110# steam APS bypass 2' 2" 116-49 MI Under E 1613. Blowdown condensate 8' 2" 116-50 DI 20' west of vacuutfCbottoms screens and 15' above grade. 110#:J[team tracing 2' 1/2" copper 1 16-51 DI North side of E-163T. FCC feed. 2' 4" 116-52 DI 5' west of E-1620TCTRC 137 vapor line. 2' 3" 116-53 MI 10' east of Deprop Wed meter, 15' above grade (1605 bottomSJ 30' 3" 116-54 MI Same location as aBove (atmos. overflash) 4' 3" 116-55 MI Middle of walkway plant boundary. F.O. return loop; jumpover V.CE bottoms to fuel oil. 45' 2" CHEV BB 0194RQ Specification No. EP-407-N Pipe Insulation Chevron U.S.A. Inc Symbols: MI - Missing PLANT NO. IC - Covers BOILERS DI - Damaged 130-1 130-2 DI TG 902 1" Valve underneath steam reg to turbine MI TG 1003 Inlet steam valve" to turbine 130-3 130-4 130-5 130-6 130-7 130-8 130-9 DI TG 1004 Inlet steam valve! and line MI DI TG 1004 Cond return lineri MI - - DI High pressure FW makeup to low pressure FW MI - -- MI Boiler blowdown line north of big tall cement stack DI IC' E-1004 north of big tallLgtack steam line coming in from pipeway, needed forLvalve and flange MI Steam going out of E-10Q4Iline MI Blowdown line coming frot!r#l boiler NW of tall cement s tack 130-10 DI #1 boiler cont. blowdown Northeast corner MI 130-11 DI Fuel gas line north of #TTboiler MI - --1 130-12 DI Compressor house outsider-north on 15 lb steam line 130-13 IC Valve above #1 boiler blower turbine 130-14 DI Various steam lines on top of #1 boiler 130-15 DI #1 boiler #400 header, east side middle 130-16 MI Steam hog K1203 3/4 lines^on north side DI -- --! 130-17 IC K1203 valve on exhaust tSl15 lb 130-18 MI Inside house above K1203^7~15 lb line (same as #12) Estimated Length 1' 2' 4' 4' Line Size 1" 3" 4" 1" 7' 1%" 5' 2"&4" 3" 6' 1%" 4' 2" 12' 1%" Lots 6" 10'-20' 1%' 4' 1%&1" 4" %&3/4' 8" 3/4" 6" 40' 1*U2 l CHEV BB Specification No. EF-407-N Pipe Insulation Chevron U.S.A. Inc Symbols: MI - Missing PLANT NO. IC- Cavers BOILERS DI - Damaged. 130-19 IC Oily cond. D1009 manifoIHlon south side line DI going into it " 130-20 DI 2 lines above D1026 ploc~filter 130-21 MI 120 lb air dryers heatearmanifolds Estimated Length 15' 4' 130-22 MI 40 lb air dryers new piping 130-23 DI Exchangers E1001-A and E1001-B 130-24 IC Discharge fuel oil tank~ 130-25 DI 110 lb steam line to fuel oil pumps TG302, TG3001 130-26 MI Control valve TRC 10-114,400 lb steam to heaters 130-27 DI Discharge oil valves onjyll 3 fuel oil pumps 130-28 DI Suction oil valves on all 3 fuel oil pumps 130-29 DI Steam line coming to Nor-10 FD fan at top of pipeway 130-30 DI Valve on line at top pipBway, west of west side burners on No. 10 boiler __ 130-31 DI Various size lines on tSp of pipe way west of 10 lb boiler IT 130-32 DI Top of pipe way betweeniLO and 11 boilers. Continuous blowdown line from bothlgronnecting to main header 130-33 DI Line from exhaust on #10,FD fan going to heater on east side of #10 boiler!! 130-34 DI Top of deareator smallImhnifold, 3 lines coming off 130-35 DI Feed water line coming :lnto #11 boiler steam drum MI 130-36 DI Feed water line comingCEnto #10 boiler steam drum MI -- 10' 2%' 10' 6' 4' 1' 30' 10' 7' 8' 6' 5' Line Size vsaizreiosus 4" various sizes 3" -8" 2" 1%" 3" 4" 3" 4" variou sizes 4" 4" r'&S" 4" 4" CHEV BB 012491 _ .jtoification No. EP-407-N Pipe Insulation Chevron U.S.A. Inc PLANT NO BOILERS Symbol: MI - Missing IC -tCovers DI - Damaged Estimated Length 130-37 IC Waives on continuous blowdown reg on both boilers 130-38 DI Fuel oil regulators to both boilers located between both boilers piping 4 valves 5' 130-39 DI 110 lb steam line regulators going to both boilers located between both boilers piping 6' 130-40 DI 110 lb steam line going rtp regulators for burners on side of door between boilers 3'each 130-41 DI Oil and steam line to NW_burner on #10 boiler 130-42 DI Both manual blowdown line to boilers bottom floor MI - --1 - 130-43 DI Steam and fuel oil to eafJTburners on #11 boiler 2' 14' 4 130-44 MI Las cade pumps MG1019 and TCG 1018A suction from D 1027 130-45 IC 3 valves feed water to boilers located inside pump House south wall 1-- 45' Line Size 2" 1%" 1" 2" 3/4" 2" 3/4" 6"&4" 4" CHEV BB 012492 Specification No. EP-407-N Pipe Insulation Chevron U.S.A. Inc. PLANT NCTZ36 ASPHALT PLANT Symbols: MI - Missing /IC - Covers DI - Damaged 36-1 36-2 DI Line going from mi^r on 3607 TK to mixer on 3609 Tank stream LI DI Suction and pump up Valves on TK 3609 Estimated Length 5' 2' ea. 36-3 DI Oil heater line goinggnto TK D-3613 (elbow) 1#' 36-4 DI Pump up valve at TK-3624 2' 36-5 DI Oil for heaters, inrand out valves on TK-3608 1' ea. 36-6 IC Heater oil valves going into TK3606 36-7 36-8 DI 3/4" line south sideoaf 3606 (steam line going to mixer) 4' IC Heater oil valves gopng into TK 3625 36-9 DI Steam tracing off ofjpipeway where it makes a 90 going into TK-3601 IT 6' 36-10 DI Heater oil valves gornq into TK 3601 2^' ea. 36-1 1 IC Heater oil valves going into TK-3602 36-12 DI 3" line in pipeway north of TK-3627 5' 36-13 DI Pump up line goingThto TK-3670 where it makes 90 turn . 8' 36-14 DI Suction line out of TK-3671 where it makes a 90 turn (safety hazard) 4' 36-1 5 3 and 4 stills need nw insulation all over (per Erwin) 36-16 DI Casing and discharge line on pump MG-3601 north of MI No. 3 still. = 36-17 36-1 8 IC Six valves on northlpide of E-3601 DI Line east of D-363TL CHEV BB 012493 Line Size 3/4" 8" 1 6' 1%" 2" 3/4" 2" 3/4" 3" 3" 3" V4&3 6" 3" 3 & 4" 3" Specification No. EP-407-N Pipe Insulation Chevron U.S.A. Inc PLANT N(X 36 - ASPHALT PLANT Symbols : MI - Missing fv IC - Covers DI - Damaged Estimated Length 36-19 MI Steam tracing to mJSdle north spout at Tank Car loading rack. 30' 36-20 DI Steam tracing south-east spout at TK/car rack 2' Line Size 3/4" 3/4" CHEV BB