R. L* Sandstedt (4-6486)
REFERENCE
TO
April 30, 1984 TRANSFORMER FIRES
P. R. Michael - N1E
Corporate Engineering - CS7N
I have been with Monsanto thirty-three years and during this time I have been closely affiliated with electrical utility systems in many of the Monsanto plants. I have never heard of a transformer fire within a Monsanto facility, but we have had transformer failures.
Some of those that come to mind are as follows:
In the 1970's the tap changer compartment of the regulating transformer for the DeNora cell line at Krummrich exploded twice, no fire.
The tap changer compartment of a brand new Westinghouse regulating trans former in the main substation at Queeny plant blew open in the mid-1950's. Large quantities of oil came out, but there was no fire.
In the 1950's we had two PCB transformers at Queeny plant fail. Their tops were ripped off. One was a 3,000 KVA transformer feeding maleic anhydride and the other was a 500 KVA transformer feeding the "K" Street boiler, no fires.
Attached are some recent Incident Reports from the Texas City plant. Three of these show transformer failures.
The transformer failures we have had were due to moisture related insulation failures or to mechanical stress insulation failures. There is no reason ever to have a transformer fire if there is coordinated protection on the feeders supplying the transformer's primary. Large transformers should have a sudden pressure relay. The slightest pressure ripple in a transformer will cause this relay to function and to trip the circuit breaker for the circuit supplying power to the transformer. Of course, all transformers are not protected by circuit breakers and a sudden pressure relay cannot be used, but where fuses are used they should clear the transformer before a serious fire occurs.
The utility companies on their downtown distribution networks use current
limiters or in some cases practically no protection. When a transformer
fails, all the energy in the system rushes to the point of the short cir
cuit. This terrific concentration of energy is going to cause significant
destruction unless the damaged equipment is cut off from the system quickly
by the protective devices. Instead of 0SHA coming up with additional
requirements on everybody, they should make the electrical utilities comply
with the National Electrical Code. Their coordinating practices on all
their distribution systems overhead and underground are poy p-i9l ^
voltage systems do have quality protection.
P-3J91
Page 1 of 4
IN. IO i REV. 8777 )
0655419
PCB-ARCH0755278
P. R. Michael - N1E
- 2 -
April 30, 1984
PCB filled transformers are much more subject to failure than are oil filled transformers. In oil filled transformers moisture accumulates at the bottom of the tank below the electrical winding. For PCB transformers, the mois ture floats on top of the PCB, and the electrical windings have to go through this moisture interface to exit the transformer. Also, this top moisture promotes rust which falls into the electrical components and cause shorts. (This was the case of the two PCB transformers which failed at Queeny.) PCB needs a much higher degree of maintenance. It is rare that transformer bushings fail and it is very rare that thru faults on equipment down stream cause transformer failures if the transformers.and feeders are properly protected.
For maintenance, most of the Monsanto foremen walk their facilities and make a visual inspection of the transformers once a week. They also take oil tests on a six-month or yearly basis and have contract companies come in to filter the oil or PCBs, when necessary. An important factor is that in Industry we keep track of the loads on our transformers and we do not Indiscriminately add blocks of load which can overload the equipment. This can occur in a high-rise building quite easily when a fuse blows and they put in a fuse of larger capacity. Utilities usually keep track of their loading also. If a customer already had a large service entrance in his facility, he could conceivably add load without consulting the utility company and there could be a potential problem.
In summary, within Monsanto we consider a transformer a very reliable piece of equipment. We have had oil and PCB filled units in operation for twenty years with minimal maintenance or expense. There was a transformer bank (oil) in the Anniston plant that ran twenty-five years with no maintenance and no problems. I do not think that any additional restrictions should be put on industry for PCB or oil filled transformers. The restrictions should be put on the poor performers - the utility and commercial facilities. Our track record is excellent, we do a quality job now and any additional regulations will not change our practices, but may result in additional paperwork.
R. L. Sandstedt ml
EX P-3391 Oft*g 02 of 4
PCB-ARCH0755279
INCIDENT LOSS REPORT
SAFETY AND PROPERTY PROTECTION MANUFACTURING COORO(NATION DEPARTMENT MONSANTO COMPANY
Complptf form for aach incident with Estimated Lost Total of $25,000 or over, or having lost Potential in excess of $100,000. Forward within 10 days to Mgr.,
Property Protection, S&PP. St. Louis. Submit revised report for important new facts or major change in loss estimate. For Europe/Africa, send copy of report to
Mgr., Insurance, London. See S&PP Procedure 601 for further explanation.
r LOCATION
V.
yy city7s</^
. . . ' ""ITAT6 - COUNTRY
. /'it..
J/-J AJ
REPORTED V
.
D*^!r--2</- tps. / NO LOSS FOR MONTH OF P/S(/. //// /jPi_
TELEPHONE REPORT
Q INITIAL REPORT
'"REVISED REPORT
SUPPLEMENTAL REPORT TO FOLLOW
DATE OF LOSS Day, Date, Time LOCATION Yard, Buildlng.Lovol, Tonk Farm, Plant Sob-Stotion, Off Premise Utility, Ete.
PERSONNEL INJURY
. M/Jy /3 y 'SVL?/ Ptf___ ~jPdA {tlstc.. 'S<y&STOT/gr/
NO
e***TM,^ Dirre/rtr/y/CA/z TS-V6:d\,
EQUIPMENTMoehlne(s), Device, or Equipment Initially Involved
S
Number Recordable__
'
D Bui.illdUinl.g.
DAMAGE
TO
. *-
CAUSE |rp'obob--c:-)7^-^;.
'
,_.7^ & St J* w. Jcm 7
0ISC0VERY Prompt [jjj---* Deloyed (l
By Whom
Employe (^L-- WotchmonmPi~1l
OOuuttssliddeerrf^"!
Au tom otic Alorm ^ FactorNo
^ACTION*^ (Check If Responded) Employe Q^*Plont Emerg. Organti. Q Public Fire Dept. Q Operations Attended At Time of Loss
No
CONSTRUCTION
TYPE (Roof & Floor) Fire Resistive Q Non.combustible Q Comb, or Port Comb. Q
Outdoor (No bldg. Involve^ Q
.
SPECIAL FEATURES
Open Structuref~l
Expl.VenttngQ
Fire Proofed Steel Q
Heot & Smoke Vents Q
Cutoffs[*")
SPRINKLERS IN AREA Non#
Wet
Dry
Deluge
No. Oponod
DURATION OF SPRINKLER OPERATION
LARGE HOSE (2H") NUMBER STREAMS USED
DURATION OF FIRE_________________ "
OTHER APPARATUS USED PROTECTION RESTORED
Extinguishers
Small Hose
Fixed Sysf. (Type) _
Control Auto. Q Manual Q Effective Yes Q No Q
Dole end Time When Sprinklers were Replaced and Full Fire Protection Restored
FIRE PUMP STARTEO Yos No
DEFICIENCIES Rote up to three most opplicoble Items 1, 2, 3, in order of Importance for each of two categories below. Describe each briefly,
DEFICIENCIES RESPONSBILE FOR OCCURRENCE:
DEFICIENCIES CONTRIBUTING TO EXTENT OF DAMAGE
Non#
Training Housekeeping Design Equipment Personnel Other (Oescribe)
-
-
0 4 Jet/
[fl/Av-JZ
Fire Protection Other Protection Emergency Action
JMSUAA r/Wci.cfi..
/l/*<sr*~/6r*+rc<
Other (Describe)
-
Q .
$ ! M4.6A:./<...
---------------------------------------------------------
DESCRIPTION OF INC IDEMTi .
0655421
(See Reverse)
TYPE OF INCIDENT (Circle One); 01. Fire 02. Explosion 03. Runaway Reoction ^07^ Electrical Fdflure^ 08. Colli si on 09, Wind 10. Lightning ] 1. Other (identify)
04. Spill
05. Other Process
06 Mechanical Failure
CED USE ONLY Tiw Cod. 12 3 4 TMCT,0Ni......IF, IP. 3M. 4E, 5
OATS OF INCIDENT
Me.
Day
Yr.
LOCATION COOK
INSURA9UEI
DIVISION COOK
1 YES 2 NO
INS. COOK
1 BAM 2 FIRE
0-1466 (REV. 1/79}
OOTH CEO REPORT NO.
%
ESTIMATED LOSS
ESTIMATED MAXIMUM LOSS
KT'cr;:;,.. ci.muP) Business Interruption
, /s 3,o<oo
-
POTENTIAL IN DOLLARS : p-3391 -NM EX
(Profit A Com, Expense) TOTAL
S
~ -
_____________ __ |e 3 of^oo - BOOM Pag
/OQ__________
3. Q 600 - 1000M
Does Business Interruption Represent Actuol Soles Loss?
, 1 YES rt NO
4. QOverlOOOM
PCB-ARCH0755280
THE INCIDENT (CON'T)
THE DAMAGE AND SALVAGE- _?TZ)/Q
(j&j rvq-T?^>A/ *
~7^r'6 6 --g* -r/2,/^^
o
/s? A<V
<?s-r
go o
/~2- ^, &QQ /?i=jPc/n-c&-
INTERRUPTION TO PRODUCTION J2j^/ZZL J~S J A jppilo X.
Js./^sr^aL____/A/_____-j^/ 4 0 ij 0 /-7-
^=>975L
>a/ .X~ /]$
/ r^r/<?/v ^ 7Tf--77
CONCLUSIONS AND RECOMMENDATIONS___
,26g^. w._____/ a -_<? ^
Tlg^TV^.
d...r sh" A--y^
-hu*
/ J -77
I |Q fi, C^-
<
* ./,. ^/ f- /I // $- *T^~~
^ (7
BASIS FOR ESTIMATED maximum LOSs^POjEMmL
r
y*-A
/A .tT cat.
1 AA 90 O
AS AA
EX P-33 Page 4 of 4
0655*22
PCB-ARCH0755281