Document oe5Oq8y0zGYM7qzem6zp77k8D
Region 6 - Enforcement & Compliance Assurance Division
INSPECTION REPORT
Inspection Date(s): Media Program: Regulatory Program(s)
1/29/2020 Water Brine - CWA
Company Name: Facility Name: Facility Physical Location:
(city, state, zip code) Mailing address:
(city, state, zip code) County/Parish: Facility Phone Number Facility Contact:
T Bar M Energy Resources, LLC Tom Burrow Lease 35.8099, -96.104067 Beggs, Oklahoma 74070 1302 Commercial Mounds, Oklahoma 74047 Okmulgee County (918) 827-3174 Travis Allen TBARMENERGY@gmail.com
FRS Number: Identification/Permit Number: Media Identifier Number: NAICS: SIC:
N/A N/A N/A 21111 1311
Personnel participating in inspection:
Kent W. Sanborn
EPA 6 ECDWE
Environmental Engineer
EPA Lead Inspector Signature/Date
Supervisor Signature/Date
Kent W. Sanborn
Digitally signed by Kent W. Sanborn DN: cn=Kent W. Sanborn, o, ou=6EN-WR, email=sanborn.kent@epa.gov, c=US Date: 2020.02.19 08:33:49 -06'00'
Kent W. Sanborn
GUY
TIDMORE
Digitally signed by GUY TIDMORE DN: c=US, o=U.S. Government, ou=Environmental Protection Agency, cn=GUY TIDMORE, 0.9.2342.19200300.100.1.1=68001003655426 Date: 2020.02.28 10:48:24 -06'00'
Guy Tidmore
Date
28 FEB 2020
Date
6ENFORM-019-8 (10/31/2019)
1
Section I - INTRODUCTION
T Bar M Energy Resources, LLC / Tom Burrow Lease Inspection Date: 01/29/2020
PURPOSE OF THE INSPECTION EPA Region 6 inspector K.W. Sanborn visited the T Bar M Energy Resources, LLC oil and gas facility located near Beggs, Oklahoma on 01/29/2020 for an unannounced inspection. There were no representatives of T Bar M Energy Resources, LLC present for the inspection. The inspection was conducted by authority of the Clean Water Act and the Safe Drinking Water Act to determine compliance with the Environmental Protection Agency (EPA) regulations.
FACILITY DESCRIPTION The facility is known as the Tom Burrow Lease.
Section II - OBSERVATIONS During the inspection, I observed the tank battery with no secondary containment and there was a cut in the berm wall at the facility. I observed runoff flowed towards a pond, which was not affected at the time of the inspection. During the inspection, the separator leaked from the base was corroded. The leaking fluids flowed from the battery towards the nearby pond. I observed some surface damage near the tank battery outside of the secondary containment area.
Section III - AREAS OF CONCERN There was a leaking separator and no secondary containment to prevent flow from the site towards a nearby pond.
Section IV - FOLLOW UP EPA water enforcement will refer this facility to EPA R6 SPCC program.
Section V - LIST OF APPENDICES N/A
2
6ENFORM-019-8 (10/31/2019)