DATE: SUBJECT: FROM: THRU: TO:
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGIONS
77 WEST JACKSON BOULEYARD CHICAGO, ILLINOIS 60604
OCT 2 3 2018
CLEAN AIR ACT INSPECTION REPORT NEORSD Westerly Wastewater Treatment Plant, Cleveland, Ohio
Kem1eth Ruffatto, Environmental Engineer AECAB (IL/IN)
Nathan Frank, Section Chief AECAB (IL/IN)
File
BASIC INFORM.ATION
Facility Name: NEORSD Westerly Wastewater Treatment Plant
Facility Location: 5800 Cleveland Memorial Shoreway, Cleveland, Ohio
Date of Inspection: August 30, 2018
EPA Inspector(s): 1. Kenneth Ruffatto, Environmental Engineer 2. Luke Hullinger, Environmental Engineer
Other Attendees 1. Debbie Klosz, Superintendent, NEORSD 2. Travis Pitts, Assistant Superintendent, NEORSD 3. Sarah Relmer, Environmental Specialist, NEORSD
Contact Email Address: rehnersc@neorsd.org
Purpose of Inspection: CAA Compliance Inspection
Facility Type: Wastewater Treatment Plant
Regulations Central to Inspection: NSPS Subpart MMMM and Subpart LLLL for existing and new sewage sludge incinerators, respectively
Arrival Time: 9:30 AM Departure Time: 11: 15 AM
Inspection Type: [:gJ Unannounced Inspection
D Announced Inspection
OPENING CONFERENCE
[:gJ Credentials Presented [:gJ CBI warning to facility provided
The following information was obtained verbally from NEORSD Staff unless otherwise noted.
Process Description: The Northeast Ohio Regional Sewer District (NEORSD) Westerly Wastewater Treatment Plant (the Plant) treats approximately 21 million gallons of wastewater a day and can get as much as 100 million gallons of influent during rain events. The Plant has both wet and dry treatment processes for the water and developed sludge, respectively.
Wet Side: Inlet water passes through grit removal which has four bar rakes and six grit channels and is sent to two primary settlement tanks. The primary effluent pumping station then pumps the wastewater to three trickling filters used to remove biochemical oxygen demand (BOD). Mixed liquor tanks are below to catch sludge formed or water is sent to three settling tanks where mixed liquor is also settled out. Ferric chloride is added to remove phosphorous depending on the influent phosphorous levels. The water is then sent to a contact tank with sodium hydrochloride for chlorination and then sodium bisulfite is added in the channel to dechlorinate before water is discharged to Lake Erie.
Dry Side: Sludge from the primary settling tank is sent to a gravity thickener for dewatering before being sent to the solids building where it is stored in sludge storage tanks. A cationic polymer is added to the sludge, which is transported to centrifuges before being incinerated. There are two hearths controlled by scrubbers, but only one is in service at a time because there is only one burner. Sludge production typically ranges around 15.8 dry tons per day. Sludge may sometimes be hauled off-site if there is too much for the incinerators.
Staff Interview: One of the incinerators had new brick work, burners, and masonry work done that was finished in March 2018.
TOUR INFORMATJON
EPA toured the facility: Yes
Page 2 of3
Data Collected and Observations: EPA noted that there was only one hearth operating during the time of inspection and temperatures ranged from 96-1329F throughout the hearth.
Photos and/or Videos: were not taken during the inspection.
Field Measurements: were not taken during this inspection.
CLOSING CONFERENCE
Requested documents: Stack Tests from Hearths I and 2 Monthly SEM Reports from 2018 NSPS Subpart MMMM Semi-Annual Reports
SIGNATURES
r / Report Author: '._i('?_.t;~~f_~V~"'f.1'._._ __!__~":::~::::=::__ Date: 0
.
.
1 T' f /1/J//
Sect10n Ch1ef'.'=z/pc;/L,A c /h
.
A. C
".-, pv!,.; 1. Date:
/o//113I /to t8
10Il-r. ~ il1S'
Page3 of3