UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGION III
1600 John F. Kennedy Blvd Philadelphia, Pennsylvania 19103-2852
Report Title: Inspection Date(s): Start Time: Regulatory Program(s):
Site Name: Site Location:
Latitude: County/Parish: Site Owner: Mailing Address:
Clean Water Act, Section 404 Inspection Report for the Sun
Outdoors Chesapeake Bay Site
04/05/2023
8:55
End Time: 11:30
Inspections authorized pursuant to Clean Water Act, Sections 308
and 404 (33 U.S.C. 1318 and 1344)
Sun Outdoors Chesapeake Bay
8107 Tall Pines Lane (Tax Map # 24-A-129 and Parcel
02400A000012900)
Temperanceville, Virginia 23442
37.932326 N
Longitude: -75.653309 W
Accomack
Sun Tall Pines Harbor RV, LLC 8107 Tall Pines Lane Temperanceville, VA 23442
Unique Project #:
3E23WW035A
Site Contact(s): Dante Iocona, Blue Water Hospitality, Regional Operations Manager Phone: (410) 213-1900 x1152 Email: diocona@bwdc.com
EPA Inspector: Robert George, Inspector, 3ED31 Phone: (215) 814-2713 Email: George.Robert@epa.gov
EPA Inspector Signature/Date
Robert George
Digitally signed by Robert George Date: 2023.06.06 15:53:20 -04'00'
Robert George, Inspector, 3ED31 1600 John F. Kennedy Blvd. Philadelphia, PA 19103
Date
Supervisor Signature/Date
RENEE
Digitally signed by RENEE BRYANT
BRYANT
Date: 2023.06.06 16:44:59 -04'00'
Renee Bryant, Chief, SDWA & Wetlands
Section
Date
Unique Project #: 3E23WW035A
CWA Section 404 Inspection 04/05/2023
Table of Contents
Section
Page
I
Introduction................................................................................................ 3
A Site Identification....................................................................................... 3
B Weather and Environmental Conditions.................................................... 3
C Inspection Opening Conference................................................................. 4
II
Site Activity................................................................................................ 5
III
Observations............................................................................................... 5
IV
Records Review.......................................................................................... 7
V
Closing Conference.................................................................................... 8
A Overview.................................................................................................... 8
B Observations Relayed to Site Representative............................................. 8
C Documents Requested or Received............................................................ 9
VI
List of Attachments.................................................................................... 9
Unique Project #: 3E23WW035A
Page 2 of 9
CWA Section 404 Inspection 04/05/2023
I. Introduction
The U.S. Environmental Protection Agency, Region III ("EPA") received information from the U.S. Army Corps of Engineers, Norfolk District ("USACE") notifying the EPA that USACE representatives observed ongoing and/or completed activities involving the potential discharge of dredged or fill material into waters of the United States on the Site related to the expansion of the campground. On February 28, 2023, the EPA notified the owner, Sun Tall Pines Harbor RV, LLC, that the case had been referred from the USACE and the EPA is the lead enforcement agency for this new construction activity under Section 404 of the Clean Water Act ("CWA").
This inspection was conducted by the EPA to evaluate the compliance of the Site with Section 404 of the CWA. The inspection date was coordinated with Mr. Dante Iocona ("Mr. Iocona"), the Regional Operations Manager with Blue Water Hospitality ("Blue Water"). Subsequent email correspondence on March 13, 2023, confirmed the date and time of the inspection. EPA assigned this inspection Unique Project Identification # 3E23WW035A.
A. Site Identification
The inspection was conducted at Sun Outdoors Chesapeake Bay, located at 8107 Tall Pines Lane (Tax Map # 24-A-129 and Parcel 02400A000012900) in Temperanceville, Virginia ("Site"). The Site is owned by Sun Tall Pines Harbor RV, LLC and is an approximately 80-acre recreational campground situated on the waterfront of the Pocomoke Sound. The Site is further identified in map provided in Attachment 1.
B. Weather and Environmental Conditions
The weather conditions for the day of the inspection, Wednesday, April 5, 2023, were clear and sunny with a recorded high temperature of 88 F at the Ashland Hanover Municipal Airport Station (USW00093775). In the 6-day period preceding the inspection there were two days of recorded rainfall at Station US1VAAC0007, according to the National Oceanic & Atmospheric Administration's Record of Climatological Observations as shown in Table 1 below.
Table 1. Seven Day Precipitation Data for the Site
Date 3/30/23 3/31/23 4/1/23 4/2/23 4/3/23 4/4/23 4/5/23 (Inspection)
Precipitation (inches) 0.00 0.00 0.05 0.48 0.00 0.00 0.00
Unique Project #: 3E23WW035A
Page 3 of 9
CWA Section 404 Inspection 04/05/2023
C. Inspection Opening Conference
The EPA inspectors arrived onsite via Tall Pines Lane at approximately 8:50 AM. The inspection team parked and entered the Welcome Center where they were directed by reception to a conference room where Blue Water representatives were waiting.
The Opening Conference began at approximately 8:55 AM with introductions. The EPA inspectors, Katelyn Almeter and Robert George, displayed their credentials to Mr. Iocona and Ms. Kim Scott ("Ms. Scott") at the outset of the inspection and explained that the purpose of the inspection was to document the conditions on the Site, where recent earth-moving and construction activities occurred. Additionally, the inspectors would collect data and photographs to observe the status of the Site's compliance with Section 404 of the CWA.
Mr. Iocona stated that Blue Water purchased the Site in November 2021 and operates the campground. He stated that while there were not any active construction projects onsite, approximately 40 truckloads of fill were recently placed to the southeast of the Welcome Center for use as a parking/storage area. He also stated that there were plans to expand the septic system and to implement beach replenishment along the waterfront.
The EPA inspectors informed Mr. Iocona that an inspection report will be prepared following the inspection. Based on EPA's process, the inspection report is expected to be finalized within 60 days of the inspection and will be distributed to the inspection attendees thereafter. The Opening Conference concluded at 9:05 AM and the attendees walked outside to begin the inspection. At 9:10 AM, Mr. David Knepper, a biologist with the USACE, Norfolk District, joined the inspection team.
The list of inspection attendees is provided in Table 2 below.
Table 2. Inspection Attendees
Name Katelyn Almeter Robert George David Knepper 1
Dante Iocona Kim Scott
1 Did not attend the Opening Conference
Affiliation EPA Region III EPA Region III USACE, Norfolk
District Blue Water Blue Water
E-mail Almeter.Katelyn@epa.gov George.Robert@epa.gov David.A.Knepper@usace.army.mil
diocona@bwdc.com kscott@bw.sunoutdoors.com
EPA has not made a determination on whether the site/facility is a small business. Should the site/facility find it applicable, the U.S. EPA Small Business Resources Information Sheet can be found at https://www.epa.gov/sites/production/files/2017-06/documents/smallbusinessinfo.pdf.
Unique Project #: 3E23WW035A
Page 4 of 9
CWA Section 404 Inspection 04/05/2023
II. Site Activity
On May 29, 2019, USACE representatives observed ongoing and/or completed activities involving the potential discharge of dredged or fill material into waters of the United States on the Site related to the expansion of the campground. The EPA was contacted by the USACE and was informed that an after-the-fact permit was issued for beach nourishment of the northern portion of the Site in 2008 (NAO-2008-02241). Please note that this permit expired in 2013 and is no longer valid. The USACE did not have any record of any other permit(s) for earth-moving or filling activity in aquatic resources on other portions of the Site. This inspection was conducted to observe the status of compliance at the Site in light of information provided to the EPA regarding recent potential work conducted in wetlands.
III. Observations
Following the Opening Conference, the inspectors traveled to the southeast of the Welcome Center where Mr. Iocona had stated that approximately 40 truckloads of fill were recently placed. The inspectors observed a rectangular area where brown sandy fill had been discharged (Attachment 2, DSCN4601-DSCN4604). Henceforth, this area will be referred to as Area of Concern ("AOC") 1.
Soil boring Bor-1 was documented at the southwestern corner of AOC-1 at 37.929544, 75.653214 (See Site Figure [Attachment 1] and photos DSCN4605-DSCN4607): [0-8 inches] mixed matrix 80% 7.5YR 5/6 sandy fill and 20% 7.5YR 4/6 sandy fill; [8-11 inches] root mat and native soil surface encountered, 10YR 3/1 sand with 2% 2.5YR 3/6 oxidized rhizospheres; [11-19+ inches] 10YR 3/1 sand with 5% 2.5YR 3/6 redoximorphic features. The observed native soil profile met the technical definition of a hydric soil (Indicator S5). Vegetation was not observed within AOC-1 as all three parameters (i.e., vegetation, soil, and hydrology) were significantly disturbed by the discharge of fill.
The inspectors walked east and encountered a linear ditch bordering the property, oriented from north to south. The ditch possessed an ordinary high-water mark, flow, and the bed was indicative of regular flow. At the time of inspection, the ditch was full of water with discernable flow toward the Pocomoke Sound. Sandy fill was observed within this ditch (DSCN4608 and DSCN4609). Soil boring Bor-2 was documented immediately to the west of the ditch at the northeastern corner of AOC-1 at 37.929619, -75.652603 (DSCN4610- DSCN4612): [0-10 inches] mixed matrix 80% 7.5YR 5/2 sandy fill and 20% 7.5YR 5/8 sandy fill; [10-11 inches] root mat and native soil surface encountered, 10YR 2/1 organic peat; [11-14+ inches] 10YR 3/1 sandy loam with 5% 2.5YR 3/6 oxidized rhizospheres. The observed native soil profile met the technical definition of a hydric soil (Indicator S5). Vegetation was not observed within AOC-1 as all three parameters (i.e., vegetation, soil, and hydrology) were significantly disturbed by the discharge of fill. AOC-1 was further documented, and fill was observed butting up against multiple tree trunks (DSCN4613- DSCN4615).
Unique Project #: 3E23WW035A
Page 5 of 9
CWA Section 404 Inspection 04/05/2023
The inspection team walked to the north a field (DSCN4616 and DSCN4617), then traveled west to where a septic tank was recently installed (DSCN4618- DSCN4619). The inspection team then traveled to the southeast, where publicly available 2021 aerial imagery indicated earthmoving or filling activity may have occurred. The inspectors observed two oblong areas where fill had been placed (DSCN4620-DSCN4626). Henceforth, this area will be referred to as AOC-2.
Soil boring Bor-3 was extracted from AOC-2 at 37.929972, -75.655328 (DSCN4627DSCN4630): [0-3.5 inches] mixed matrix 80% 7.5YR 6/3 sandy fill and 20% 10YR 4/1 sandy loam; [3.5-13 inches] native soil surface encountered, 10YR 4/1 sandy loam with 15% 2.5YR 3/6 oxidized rhizospheres. The observed native soil profile met the technical definition of a hydric soil (Indicator S5). Bor-3 was collected from mowed field which was dominated by turfgrass: Bermudagrass (Cynodon dactylon) and annual bluegrass (Poa annua). Vegetation in this area was altered by regular maintenance and the soil was impacted by the discharge of fill. While AOC-2 was further documented, including a ditch to the south (DSCN4631-DSCN4637), Ms. Scott stated that in December 2022 a storm inundated the eastern portion of the Site and Mr. Iocona followed up that material was placed in that area in January 2023 because maintenance trucks had difficulty with access.
The inspection team then traveled to this area on the central-eastern portion of the Site where a road constructed of fill material was documented (DSCN4639-DSCN4640). Piles of logs, firewood, mulch and general woody refuse were also observed. Additionally, the area was used to store miscellaneous items associated with the operation, landscaping equipment and materials (DSCN4641- DSCN4648). Henceforth, this area will be referred to as AOC-3. Some miscellaneous items were scattered to the east of the Site throughout the forest. Mr. Iocona stated that this was due the recent flooding event in December 2022.
The inspection team then walked to the north and encountered a road, which was constructed of sand above grade and was oriented south to north. Henceforth, this area will be referred to as AOC-4. Soil boring Bor-4 was extracted the southern extent of the road at AOC-4 at 37.932928, -75.652858 (DSCN4651): [0-1.5 inches] 7.5YR 6/4 sandy fill; [1.5-3.5 inches] 10YR 3/1 compacted sandy loam; [3.5-6 inches] 7.5YR 6/4 sandy fill; [6-14 inches] 10YR 3/1 sandy loam with 5% 2.5YR 6/4 redoximorphic features.
The road continued northward, and large fill piles were observed on the road (DSCN4652DSCN4655). Ms. Scott stated that the piles were comprised of spoils excavated from the where the new septic system was recently installed (See above at Section III, Paragraph 4 [pg. 5] and photos DSCN4618-DSCN4619). The inspection team continued northward on the road, and it appeared that some of the sand used to construct the road had spilled into a ditch, which ran parallel east of the road (DSCN4656- DSCN4661). This was a downstream section of the ditch abutting AOC-1.
Unique Project #: 3E23WW035A
Page 6 of 9
CWA Section 404 Inspection 04/05/2023
Soil boring Bor-5 was extracted from the northern extent of the road at AOC-4 at 37.934047, 75.652081 (DSCN4663): [0-9 inches] mixed matrix 90% 7.5YR 5/4 sandy fill and 10% 7.5YR 6/6 sandy fill; [9-10 inches] 10YR 2/1 native soil surface comprised of black organic peat and root mat; [10-18+ inches] 10YR 3/1 sandy loam with 5% 2.5YR 5/4 redoximorphic features. The observed native soil profile met the technical definition of a hydric soil (Indicator S5). All three parameters (i.e., vegetation, soil, and hydrology) were significantly disturbed by the discharge of fill.
The inspection team then walked west to a reference area that was forested and collected Bor-6 at 37.933881, -75.652378 (DSCN4664-DSCN4666): [0-4 inches] 10YR 2/1 black organic peat and root mat; [4-12 inches] 10YR 3/1 sandy clay; [12-18+ inches] 10YR 4/1 sandy clay with 5% 2.5YR 4/6 redoximorphic features. The observed soil profile met the technical definition of a hydric soil (Indicator S1). Primary indicators of hydrology were observed. For example, the soil was saturated, and the water table was seeping into the boring at a depth of 15 inches. The vegetation community was dominated by mature loblolly pine (Pinus taeda) in the tree stratum. The community did not contain a sapling or shrub strata. The herbaceus stratum contained a few individual whorled pennywort (Hydrocotyle verticillata). This area met the technical definition of a wetland as hydric soils, wetland hydrology, and a hydrophytic vegetation were observed. The inspection team then walked to the northwest and encountered a linear ditch filled with water. A culvert conveyed water under the road crossing (DSCN4667-DSCN4669). The inspection team then continued north on the road located at AOC-4 (DSCN4670-DSCN4673) until they reached the northeastern extent of the Site, which was set on the waterfront of the Pocomoke Sound.
The inspectors walked the waterfront from east to west and observed a concrete bulkhead situated along the waterfront of Pocomoke Sound. Bricks, concrete, and cinderblocks were observed waterward of the bulkhead (DSCN4675- DSCN4678, DSCN4681- DSCN4684). Campsites, complete with septic hookups were located to the south of the bulkhead (DSCN4680). A wooden pier was observed extending northward into the sound (DSCN4679, DSCN4682, DSCN4684, and DSCN4685). Continuing westward, the inspection team encountered an inlet (DSCN4686 and DSCN4687). To the south of the inlet, a large, inundated area was encountered. On the western bank of the open water area was sparsely vegetated sand, which appeared to have been recently placed (DSCN4688) and included a picnic area, extending to the western boundary and waterfront (DSCN4690- DSCN4694). The inspection team and attendees then traveled back to the Welcome Center conference room, where the Closing Conference was then conducted.
IV. Records Review
A review of Site/facility records was not a component of the inspection; therefore, EPA is not expecting to access business records, including confidential business information ("CBI"). If the Site/facility owner wants to make a CBI claim on information or photographs collected by the inspector during the inspection, he can submit a claim to EPA. After the Site/facility notifies
Unique Project #: 3E23WW035A
Page 7 of 9
CWA Section 404 Inspection 04/05/2023
EPA of the CBI, EPA representatives will mark the CBI as such, and it will be handled as CBI according to EPA's procedures. V. Closing Conference
A. Overview
The Closing Conference was conducted at the conclusion of the walkthrough at approximately 11:15 am. The EPA relayed the findings as discussed in Section B below to Mr. Iocona and Ms. Scott and stated that an inspection report would be completed and disseminated within 60 days.
B. Observations Relayed to Site Representative
The Closing Conference began with a general discussion about the authority of the CWA to regulate the discharge of dredged or fill material into waters of the United States. The inspectors reiterated the purpose of the inspection to collect data and photographs to observe the status of the Site's compliance with Section 404 of the CWA.
The inspectors then summarized the observations and stated that a compliance determination had not been made and would not be included as a component of the inspection or report. The inspectors discussed the presence of wetlands onsite and several AOC that were identified and are illustrated in Attachment 2:
AOC-1, rectangular area to the southeast of the Welcome Center where Mr. Iocona stated that approximately 40 loads of fill were recently placed;
AOC-2, oblong area where fill had been placed on the western portion of the property; AOC-3, area on the central-eastern portion of the property where Mr. Iocona stated that
sand was placed following a recent flooding event to allow trucks to access this portion of the Site. Piles of woody debris and fill were also documented; AOC-4, road constructed above-grade with sand. Two fill piles were observed at the southern and northern terminuses. Ms. Scott stated that the fill pile located on the southern extent was comprised of excavated spoils from the recently constructed septic system; and Waterfront area, it appeared that there was new construction associated with the waterfront campsites located on the northeastern portion of the property. To the west, sparsely vegetated sand was observed on the northwestern portion of the Site.
Mr. Iocona asked if the timeline of activities would be taken into consideration, as Blue Water recently purchased the property in November 2021, and had no prior knowledge of earthmoving activity in some of the areas that had been outlined. The inspectors responded in the affirmative that the timeline of activities would be evaluated, and that the previous owner was recently engaged by the EPA.
The inspectors then discussed CWA permitting and cautioned against the construction of any structures in AOC-1 for the purposes of storage without obtaining a permit from the USACE. Mr. Iocona asked about how CWA jurisdiction could be determined, and the inspectors replied that a Jurisdictional Determination could be acquired from the USACE. Mr. Iocona then stated that he would consider contacting an environmental consultant. David Knepper clarified that in a
Unique Project #: 3E23WW035A
Page 8 of 9
CWA Section 404 Inspection 04/05/2023
situation where there is a potential enforcement action it would need to be addressed before the USACE could issue a Jurisdictional Determination or permit. The inspectors reiterated that an inspection report would be completed and disseminated within 60 days. The Closing Conference concluded, and the EPA left the Site at 11:30 am. C. Documents Requested or Received
There were no documents requested or received.
VI. List of Attachments
Attachment 1: Site Figure Attachment 2: Photographic Log
Unique Project #: 3E23WW035A
Page 9 of 9
0
0.05 0.1
0.2 Miles wa terfront
wa
terfront
Bor 6
Bor 5
AOC 4
Bor 4 AOC 3
Flag Pond Rd
Tall Pines Hbr
AOC 2
Bor 3
AOC 1 Bor 1
Bor 2
Legend
Soil Borings Waterfront Areas of Concern ("AOC") Site Boundary
Saxis Rd
Sax Esri Community Maps Contributors, VGIN, OpenStreetMisapR, Md icrosoft, Esri, HERE, Garmin, SafeGraph, GeoTechnologies, Inc, METI/NASA, USGS, EPA, NPS, US
Census Bureau, USDA, Maxar
Attachment 2 - Photographic Log
UPI# 3E23WW035A
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4601 Photo taken by: Katelyn Almeter Notes: Area of Concern ("AOC") 1 located to the southeast of the Welcome Center where sandy fill had recently been placed.
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4602 Photo taken by: Katelyn Almeter Notes: Eastward view of a linear ditch that was observed to the south of AOC-1.
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4603 Photo taken by: Katelyn Almeter Notes: Sandy fill placed over AOC-1.
Page 1 of 32
Attachment 2 - Photographic Log
UPI# 3E23WW035A
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4604 Photo taken by: Katelyn Almeter
Notes: View of AOC-1.
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4605 Photo taken by: Katelyn Almeter Notes: Soil profile extracted from Bor-1 at AOC-1.
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4606 Photo taken by: Katelyn Almeter Notes: Native soil extracted from Bor-1 exhibiting redoximorphic features.
Page 2 of 32
Attachment 2 - Photographic Log
UPI# 3E23WW035A
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4607 Photo taken by: Katelyn Almeter
Notes: Sandy fill placed at AOC-1.
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4608 Photo taken by: Katelyn Almeter
Notes: Southward view of a linear ditch observed along the eastern boundary of the Site.
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4609 Photo taken by: Katelyn Almeter
Notes: Southward view of a linear ditch observed along the eastern boundary of the Site. Note the sandy fill discharged into the ditch.
Page 3 of 32
Attachment 2 - Photographic Log
UPI# 3E23WW035A
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4610 Photo taken by: Katelyn Almeter
Notes: Bor-2 extracted from AOC-1.
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4611 Photo taken by: Katelyn Almeter
Notes: Soil profile of Bor-2.
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4612 Photo taken by: Katelyn Almeter
Notes: Soil profile of Bor-2. Note interface between sandy fill and native soil, which exhibited reduced chroma (i.e. <2) and redoximorphic features.
Page 4 of 32
Attachment 2 - Photographic Log
UPI# 3E23WW035A
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4613 Photo taken by: Katelyn Almeter
Notes: AOC-1.
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4614 Photo taken by: Katelyn Almeter
Notes: AOC-1.
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4615 Photo taken by: Katelyn Almeter
Notes: Note depth of fill around a tree located within AOC-1.
Page 5 of 32
Attachment 2 - Photographic Log
UPI# 3E23WW035A
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4616 Photo taken by: Katelyn Almeter Notes: Field located to the north of AOC-1.
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4617 Photo taken by: Katelyn Almeter Notes: Field located to the north of AOC-1.
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4618 Photo taken by: Katelyn Almeter Notes: Site of recently installed septic tanks.
Page 6 of 32
Attachment 2 - Photographic Log
UPI# 3E23WW035A
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4619 Photo taken by: Katelyn Almeter Notes: Site of recently installed septic tanks.
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4620 Photo taken by: Katelyn Almeter Notes: View of AOC-2.
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4621 Photo taken by: Katelyn Almeter
Notes: Soil extracted from AOC-2.
Page 7 of 32
Attachment 2 - Photographic Log
UPI# 3E23WW035A
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4622 Photo taken by: Katelyn Almeter
Notes: View of AOC-2.
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4623 Photo taken by: Katelyn Almeter Notes: View of AOC-2. Note sandy fill present at the surface.
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4624 Photo taken by: Katelyn Almeter Notes: View of AOC-2.
Page 8 of 32
Attachment 2 - Photographic Log
UPI# 3E23WW035A
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4625 Photo taken by: Katelyn Almeter
Notes: View of AOC-2.
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4626 Photo taken by: Katelyn Almeter
Notes: View of AOC-2.
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4627 Photo taken by: Katelyn Almeter
Notes: Bor-3 extracted from AOC-2.
Page 9 of 32
Attachment 2 - Photographic Log
UPI# 3E23WW035A
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4628 Photo taken by: Katelyn Almeter Notes: Bor-3 extracted from AOC-2. Note clear demarcation of fill layer and native soil.
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4629 Photo taken by: Katelyn Almeter Notes: Oxidized rhizospheres occuring within native soil.
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4630 Photo taken by: Katelyn Almeter Notes: Bor-3 extracted from AOC-2.
Page 10 of 32
Attachment 2 - Photographic Log
UPI# 3E23WW035A
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4631 Photo taken by: Katelyn Almeter
Notes: Area south of AOC-2.
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4632 Photo taken by: Katelyn Almeter
Notes: Area south of AOC-2.
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4633 Photo taken by: Katelyn Almeter
Notes: Ditch observed to the south of AOC-2.
Page 11 of 32
Attachment 2 - Photographic Log
UPI# 3E23WW035A
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4634 Photo taken by: Katelyn Almeter
Notes: Northward view of AOC-2.
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4635 Photo taken by: Katelyn Almeter
Notes: Westward view of AOC-2.
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4636 Photo taken by: Katelyn Almeter
Notes: View of AOC-2.
Page 12 of 32
Attachment 2 - Photographic Log
UPI# 3E23WW035A
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4637 Photo taken by: Katelyn Almeter
Notes: View of AOC-2.
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4638 Photo taken by: Katelyn Almeter
Notes: Road observed within AOC-3.
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4639 Photo taken by: Katelyn Almeter
Notes: Westward view of road constructed within AOC-3.
Page 13 of 32
Attachment 2 - Photographic Log
UPI# 3E23WW035A
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4640 Photo taken by: Katelyn Almeter Notes: Eastward view of road constructed within AOC-3.
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4641 Photo taken by: Katelyn Almeter Notes: View of road constructed within AOC-3.
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4642 Photo taken by: Katelyn Almeter Notes: AOC-3: pile of woody debris in foreground and recreational equipment located in background.
Page 14 of 32
Attachment 2 - Photographic Log
UPI# 3E23WW035A
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4643 Photo taken by: Katelyn Almeter Notes: Pile of fill located within AOC-3.
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4644 Photo taken by: Katelyn Almeter Notes: Log pile observed within AOC-3.
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4645 Photo taken by: Katelyn Almeter Notes: View of landscaping equipment stored at AOC-3.
Page 15 of 32
Attachment 2 - Photographic Log
UPI# 3E23WW035A
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4646 Photo taken by: Katelyn Almeter Notes: Corrugated drainage pipe stored within AOC-3.
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4647 Photo taken by: Katelyn Almeter Notes: Ditch observed along the eastern boundary of the Site.
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4648 Photo taken by: Katelyn Almeter Notes: Eastward view of refuse which was scattered by inundation during a December 2022 storm.
Page 16 of 32
Attachment 2 - Photographic Log
UPI# 3E23WW035A
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4649 Photo taken by: Katelyn Almeter
Notes: Westward view of Site.
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4650 Photo taken by: Katelyn Almeter
Notes: Northward view of sandy road located on the eastern portion of the Site.
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4651 Photo taken by: Katelyn Almeter
Notes: Bor-4 collected from road constructed of sandy fill.
Page 17 of 32
Attachment 2 - Photographic Log
UPI# 3E23WW035A
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4652 Photo taken by: Katelyn Almeter
Notes: Fill piles observed on the road at AOC-4. Ms. Scott stated that the piles were spoils excavated from the area where the new septic system was recently installed (see DSCN4618 and DSCN4619 above).
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4653 Photo taken by: Katelyn Almeter
Notes: Fill piles observed on the road at AOC-4. Ms. Scott stated that the piles were spoils excavated from the area where the new septic system was recently installed (see DSCN4618 and DSCN4619 above).
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4654 Photo taken by: Katelyn Almeter
Notes: Fill piles observed on the road at AOC-4. Ms. Scott stated that the piles were spoils excavated from the area where the new septic system was recently installed (see DSCN4618 and DSCN4619 above).
Page 18 of 32
Attachment 2 - Photographic Log
UPI# 3E23WW035A
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4655 Photo taken by: Katelyn Almeter
Notes: Fill piles observed on the road at AOC-4. Ms. Scott stated that the piles were spoils excavated from the area where the new septic system was recently installed (see DSCN4618 and DSCN4619 above).
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4656 Photo taken by: Katelyn Almeter
Notes: Northward view of abovegrade road constructed of sand. Note the linear ditch running parallel along the eastern boundary. AOC-4
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4657 Photo taken by: Katelyn Almeter
Notes: Northward view of abovegrade road constructed of sand. Note the linear ditch running parallel along the eastern boundary. AOC-4
Page 19 of 32
Attachment 2 - Photographic Log
UPI# 3E23WW035A
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4658 Photo taken by: Katelyn Almeter Notes: View of ditch to the east of the road where sand was discharged. AOC-4
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4659 Photo taken by: Katelyn Almeter Notes: View of ditch to the east of the road where sand was discharged. AOC-4
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4660 Photo taken by: Katelyn Almeter Notes: Southward view of ditch to the east of the road where sand was discharged. AOC-4
Page 20 of 32
Attachment 2 - Photographic Log
UPI# 3E23WW035A
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4661 Photo taken by: Katelyn Almeter Notes: View of ditch to the east of the road where sand was discharged. AOC-4
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4662 Photo taken by: Katelyn Almeter Notes: View of the road constructed of sand located on the northern portion of the Site. AOC-4
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4663 Photo taken by: Katelyn Almeter Notes: Bor-5 collected from AOC-4. Note upper 9" which was comprised of sandy fill.
Page 21 of 32
Attachment 2 - Photographic Log
UPI# 3E23WW035A
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4664 Photo taken by: Katelyn Almeter Notes: Soil sample extracted from Bor-6.
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4665 Photo taken by: Katelyn Almeter Notes: View of Bor-6. Note the water table seeping into the boring.
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4666 Photo taken by: Katelyn Almeter Notes: View of mature loblolly pine (Pinus taeda) located proximate to Bor-6.
Page 22 of 32
Attachment 2 - Photographic Log
UPI# 3E23WW035A
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4667 Photo taken by: Katelyn Almeter
Notes: Ditch and culvert.
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4668 Photo taken by: Katelyn Almeter
Notes: View of ditch observed onsite.
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4669 Photo taken by: Katelyn Almeter
Notes: View of ditch and culvert.
Page 23 of 32
Attachment 2 - Photographic Log
UPI# 3E23WW035A
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4670 Photo taken by: Katelyn Almeter Notes: Ditch located on northeastern portion of the Site.
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4671 Photo taken by: Katelyn Almeter Notes: Looking northward.
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4672 Photo taken by: Katelyn Almeter
Notes: Northward view towards Pocomoke Sound.
Page 24 of 32
Attachment 2 - Photographic Log
UPI# 3E23WW035A
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4673 Photo taken by: Katelyn Almeter
Notes:
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4674 Photo taken by: Katelyn Almeter Notes: Northward view of Pocomoke Sound.
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4675 Photo taken by: Katelyn Almeter Notes: Bricks, concrete, and cinder blocks located waterward of the concrete bulkhead.
Page 25 of 32
Attachment 2 - Photographic Log
UPI# 3E23WW035A
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4676 Photo taken by: Katelyn Almeter Notes: Bricks, concrete, and cinder blocks located waterward of the concrete bulkhead.
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4677 Photo taken by: Katelyn Almeter Notes: Bricks, concrete, and cinder blocks located waterward of the concrete bulkhead.
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4678 Photo taken by: Katelyn Almeter Notes: Bricks, concrete, and cinder blocks located waterward of the concrete bulkhead.
Page 26 of 32
Attachment 2 - Photographic Log
UPI# 3E23WW035A
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4679 Photo taken by: Katelyn Almeter Notes: Northward view of pier extending into Pocomoke Sound.
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4680 Photo taken by: Katelyn Almeter Notes: Southward view of campsites located at the waterfront.
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4681 Photo taken by: Katelyn Almeter Notes: Bricks, concrete, and cinder blocks located waterward of the concrete bulkhead.
Page 27 of 32
Attachment 2 - Photographic Log
UPI# 3E23WW035A
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4682 Photo taken by: Katelyn Almeter Notes: Bricks, concrete, and cinder blocks located waterward of the concrete bulkhead.
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4683 Photo taken by: Katelyn Almeter Notes: Bricks, concrete, and cinder blocks located waterward of the concrete bulkhead.
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4684 Photo taken by: Katelyn Almeter Notes: Concrete located waterward of the concrete bulkhead. Pier located in background.
Page 28 of 32
Attachment 2 - Photographic Log
UPI# 3E23WW035A
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4685 Photo taken by: Katelyn Almeter Notes: Northward view of pier entrance.
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4686 Photo taken by: Katelyn Almeter Notes: Northward view of Pocomoke Sound.
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4687 Photo taken by: Katelyn Almeter Notes: Southward view of inlet.
Page 29 of 32
Attachment 2 - Photographic Log
UPI# 3E23WW035A
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4688 Photo taken by: Katelyn Almeter Notes: View of northwestern portion of the Site. Note sparsely vegetated sand, which appears to have been recently placed.
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4689 Photo taken by: Katelyn Almeter Notes: Northward view of Pocomoke Sound and waterfront.
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4690 Photo taken by: Katelyn Almeter Notes: Northwestern portion of the Site. Note sparsely vegetated sand.
Page 30 of 32
Attachment 2 - Photographic Log
UPI# 3E23WW035A
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4691 Photo taken by: Katelyn Almeter Notes: Northwestern boundary of the Site dominated by common reed (Phragmites australis).
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4692 Photo taken by: Katelyn Almeter Notes: Area where a mound of sand was observed on northwestern portion of the Site.
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4693 Photo taken by: Katelyn Almeter Notes: Westward view of waterfront of Pocomoke Sound.
Page 31 of 32
Attachment 2 - Photographic Log
UPI# 3E23WW035A
Sun Outdoors Chesapeake Bay Date: April 5, 2023 Photo ID: DSCN4694 Photo taken by: Katelyn Almeter
Notes: Southward view of picnic area located on the northwestern portion of the Site.
Page 32 of 32