July 20, 1973
Ms ' lolland,
The stamped alumlhum wheel program has
, been accelerated by shifting monies from
' various projects. One of these projects
is the asbestos free brake lining; the dai
data are attached. According to my
inf'rmation Chassis only spent $2,000 of
their original $11^,000 for asbestos free
brake lining. They have told Tech. Plan
ning that the venders are slowing their
efforts. I doubt this and feel that
probably Chassis is not pursuing this
project with any Intensity. Please check
into it and report to me by 7/25
keeP
Carolyn informed.
! I
I
0-1
AIL-STATE LEGAL SUW*LY CO
003092
PRODUCED BY FORD
ADVANCED ENGINEERING
Tech n ical P lanning - NAAO
AEL Nn 78-10
LETTER
CATE . 6-26-78
TO: Hr. D . F. Fiscus
* cc: G. E . Adams
H. N. Ankenbauer T. H. Cooke W. R. Dance D. C. Hewicc W. L. Kith
N. A. Prittincn D . E . Smith, Jr. S. C. Stano . C. F. Talbot R. F. Widmer J. D. Velce
BEPE
_
oOy
* !S a fe ty
Elec:
AFFECTED AREAS
PCPE ? CM Z3 -nq
PCS
' CAR ENGRG. Tech O d'
G C u r on
TiA
S Eins
Subj ect: Acceleration of Scamoed Aluminum Wheel Program
The scamped aluminum wheel program is being accelerated co achieve manufacturing and design feasibilicy by Che end of 1978. This requires an additional 5150,000 of funds for maCert,: 1/cescing. The additional funds are being obtained from material/Cest offsets in ocher Chassis projects as shown below:
Title
SC 20 SCA3 SCAA SCA5 SCAB SC55 SC93
Panther Frame Ueight Reduction Stamped Aluminum Wheels Lt. Wc. Rear Drum Brakes Lt. Wt. Front A Rear Disc Brakes Lt. Wt. Disc Brake Pistons Asbestos Free Brake Lining Galvanized Upper A Lower Control
. Arms
Approved 5(000)
$218 163 109 87 79 11A 109
5879
Revised 5(000)
5168 313 89 67 59 8A 99
5879
Revised (0)/D ADproved
5(000)
5 50 (150)
20 20 20 30 10 5-0-
Revised 5183's showing appropriate changes in objective and anticipated year end accomplishments should be submitted as part of the second quarter submission on July 6.
C. H. Have
003093