Document oXxydg5xagYXvbrjMwz31MX

FILE NAME: Ford (FD) DATE: 1978 DOC#: FD142 DOCUMENT DESCRIPTION: Memos - Aluminum Wheel Program The sticky note shown below was written by Barry Castlem an and attached to the page immediately following this one along the right margin at the spot marked on the next page with an ? ! / w. A - e July 20, 1973 Ms ' lolland, The stamped alumlhum wheel program has , been accelerated by shifting monies from ' various projects. One of these projects is the asbestos free brake lining; the dai data are attached. According to my inf'rmation Chassis only spent $2,000 of their original $11^,000 for asbestos free brake lining. They have told Tech. Plan ning that the venders are slowing their efforts. I doubt this and feel that probably Chassis is not pursuing this project with any Intensity. Please check into it and report to me by 7/25 keeP Carolyn informed. ! I I 0-1 AIL-STATE LEGAL SUW*LY CO 003092 PRODUCED BY FORD ADVANCED ENGINEERING Tech n ical P lanning - NAAO AEL Nn 78-10 LETTER CATE . 6-26-78 TO: Hr. D . F. Fiscus * cc: G. E . Adams H. N. Ankenbauer T. H. Cooke W. R. Dance D. C. Hewicc W. L. Kith N. A. Prittincn D . E . Smith, Jr. S. C. Stano . C. F. Talbot R. F. Widmer J. D. Velce BEPE _ oOy * !S a fe ty Elec: AFFECTED AREAS PCPE ? CM Z3 -nq PCS ' CAR ENGRG. Tech O d' G C u r on TiA S Eins Subj ect: Acceleration of Scamoed Aluminum Wheel Program The scamped aluminum wheel program is being accelerated co achieve manufacturing and design feasibilicy by Che end of 1978. This requires an additional 5150,000 of funds for maCert,: 1/cescing. The additional funds are being obtained from material/Cest offsets in ocher Chassis projects as shown below: Title SC 20 SCA3 SCAA SCA5 SCAB SC55 SC93 Panther Frame Ueight Reduction Stamped Aluminum Wheels Lt. Wc. Rear Drum Brakes Lt. Wt. Front A Rear Disc Brakes Lt. Wt. Disc Brake Pistons Asbestos Free Brake Lining Galvanized Upper A Lower Control . Arms Approved 5(000) $218 163 109 87 79 11A 109 5879 Revised 5(000) 5168 313 89 67 59 8A 99 5879 Revised (0)/D ADproved 5(000) 5 50 (150) 20 20 20 30 10 5-0- Revised 5183's showing appropriate changes in objective and anticipated year end accomplishments should be submitted as part of the second quarter submission on July 6. C. H. Have 003093 PRODUCED BYFORD