Document oNr0a0D1B9R6dk6eBVr3M94g

UNION CARBIDE CORPORATION CHEMICALS AND PLASTICS P. O. BOX <i7l, TEXAS CITY, TEXAS 77590 RECHV tD JUN ? 1977 SAFETY TtPT. June 23, 1977 TO: Mr. Dave Leach - Johns-Manville Mr. C. D. Matthews - Johns-Manville Mr. G. M. Parrish - United Engineers COPY: Mr. E. L. Agnew Mr.'iC. WL-Carmaii-r-' Mr. D. E. Deese Mr. T. V. Griffith - United Engineers Mr. J. B. Leverton Mr. B. W. Lloyd , Hr. R. P. Melton Mr. J. H. Rapp Mr. R. J. Taylor fir. W. D. Weber fir. L. L. Wilcox FROM: J. L. Rosenberqer SUBJECT: Industrial Hygiene Department Monitor Report Removal of Asbestos on the Ethyleneamines Shutdown 6-21-77 Please find attached a report from the Industrial Hygiene Department of the Construction exposure to asbestos during the subject project. Note that at no time did the exposure exceed the permissible exposure per OSHA Procedures. Congratulations to all of you for a job well done. The extra effort required, in my opinion, to accomplish the OSHA standards and to maintain the exposure below the permissible limits was minimum compared to the overall job and definitely minor compared to the benefit of preventing our people from being exposed to asbestos. Obviously, the procedure that we have established is valid and will be followed for all future work at Texas City. Again, thank you for a job well done. JLR:rjj Attachment UCC 024598 Industrial Hygiene Department PRELIMINARY REPORT l| FcXAS CITV jlnate: 0-21-77 SUMMARY: Monitor for asbestos fiber exposure during tear-out of old Kaylo insulation at Bldg. 51. Requested by J. L. Rosenberger j DISTRIBUTION: j i TO; J. L. Roseriberger iCOPIES: | R. P. Melton I D. H. Glenn, M.D. | J. B. Leverton ! i ---i -- - ------- Surveyed 6y: C- !/. Perry pp,,,;"e^ ^ ,/J? UCC 024599 /T.K.Cainpbel