FILE NAME: PPG (PPG) DATE: 1981 DOC#: PPG101 DOCUM ENT DESCRIPTION: PPG Glass Industry
O e y .y ; " K
of our seven primary glass plants. Hqually talented members were selected from central engineering, research, environmental affairs, and supply. A plant manager with previous experience as a tank superintendent was selected to chair this important committee.
Each A R C member developed a list of asbestos components being used in his home plant. These lists were then shared at the next committee meeting. This procedure was continued until all plants considered their lists as being all inclusive.
A summary of the lists is shown below:
ASBEST O S MATERIAL LISTING
ROLLS
1. Lehr roils and spares 2. Tempering rolls and spares 3. Cooling conveyor donuts 4. Tempering quench donuts
INSULATION
A project to establish goals and procedures for identification, removal, disposition, and substitution of asbestos-laden materials
A SH ES r OS is a broad term em bracing a number of fibrous mineral silicates that diffet in chemical composition. However, for
this presentation, I will reler only to
the broad definition of asbestos.
The current Occupational Safety
and Health Adiuinislialion peimissi-
blc exposure limit lot air boi neconcen
trations of asbestos fibers is two fibers
pet cubic ceniimetei, and new limits of
0.5 fibers per cubic centimeter and 0.1
fibets per cubic centimeter have been
proposed.
It has become desirable to remove
ashesn is 11m11 on r alass -niakiim opera
11(ills Iact, our lop management
committed to the policy, staled
follows: "C o n sid e r Asbestos No
l onver .4 vailuhU
3
i> accepting this policy, it means, at
1 4
least in the beginning, that sou must be
willing to accept a lossei efficiency of
operation. Some replacement materi
als ssill not perform as well in a hot
environment, and their costs will most
likely be hidiet.
I laving obi aim'd top management's
commitment to eliminate asbestos
Irom our glass plant, how Jo we ac
complish our goal? W e must first iden
tity all components in
plant tin
contain asbestos lit s, find a
substitute material, pit fly dispose
o! the used asbestos p, . and then
establish a procedure th. ssill _prevent
ness asbestos from enter me the plant.
( )ur Iirsi step of ulei it11nation ssas
to organize a group of kn.iwlcdgeable
technicians. An A s b e s l i !''.`placement
C ommiliee (ARC) was I;>n ed ss it h an
experienced leptcsentaln Irom each
1. Float bath heat shields 2. Lehr curtains 3. Tank insulation 4. Millboard-- for heat shields 5. 11eat shield curtains 6. Ventilator shields
7. Marinite insulation 8. Regenerator insulation
9. Primary and secondary paving 10. Hue and generator chamber insu
lation 11. Float bath roof blocks
Port insulation \ 1ill use water hoses Asbestos covered hoses Insulated hoses Asbestos sheathing Air-conditioning equipment Cooler heat shields Burner heat shields 20. Burner covers 21. Fire wall curtains 22. Float bath tin drain pockets 23. Tempering quench shields 24. Ductwork coverings 25. Millboard, boiler and walls 26. Water and steam line insulation 27. Camera enclosures
SAFETY EQUIPMENT
1. Asbestos gloves 2. Aluminized asbestos coals, pants,
and boots 3. I lot suits and gloves
ELECTRICAL
^ ..
1. Thermocouple insulation
2. Thermocouple lead wire
J J 'P
3. Wire insulation
THE G L A S S IND USTRY/M ARCH 198 1
4. Coals or shields on electrical magnetics
5. Main electrical feeder cables 6. Sindanyo board for bus bar
packing gland 7. Sindanyo board for cable spacers 8. Sindanyo board for radiamatic
block top plate 9. Sindanyo board for element
block top plate 10. FJectrical barriers and separators
in switches and starters
S E A L S AND G ASKETS
1. Tempering hearth block seals 2. Steam valve gaskets 3. Internal combustion engine
gaskets 4. Pump gaskets and packing 5. Boiler seals 6. Boiler manhole gaskets 7. Boiler handhold gaskets 8. Gas \alee seals
BRAKES
1. Over-the-road vehicle brake lining
2. Industrial vehicle brake lining
3. f riction discs on chain pulls 4. Idesator brakes 5. Overhead door operator brakes
M ISC E L L A N EO U S
1. Swivel and equipment couplings 2. Ceiling tile 3. 1aboratory tools in quality
control lab 4. 1Dry mg o\ en in lab 5. Wire-impregnated asbestos cloth 6. Plain ashesioi cloth 7. Asbestos paper 8. Asbestos rope
9. Asbestos furnace cement 10. Asbestos tape I 1. Asbestos sleeving 12. Asbestos mats 13. Asbestos roof material 14. Building material -- transite 15. I loor tile
Having identified this asbestos
material in the plant, the big job now
was to litui a reasonable substitute.
Again, each member of the committee
contributed available information
from his group. Different plants uetc
assigned to litui substitutes for specific
materials or components. The resul
tant list is show n in i he accompanying
table. Idle lisi does not represent
approval or disapproval of the many
pioiliuis listed, nor is it a warranty or
guai antee concerning any of the
products. It simply represents our ex
perience.
in /u tn u c d on hi\h ' M
THE G L A S S INDUSTRY/M ARCH 19fl 1
ASBESTOS SUBSTITUTE MATERIALS
Material Use
Asl>estos Product
Substitute
BLOCK (U 1-TEMP)
BUILDING PANELS CEM ENT--HI TEMP CLEANING SERVICES CLOTHING--
REFLECTIVE
CURTAINS--FURNACE & LEHR
C U R T A IN S -- HI-HEAT
DONUTS-- HI-TEMPERA ELIRE
ELECTRIC CAB! E (HI-TEMP)
FAN BOOTS (HI-TEMP)
FLOOR TILE
FRICTION M ATERIAL G L O V E S --ASBESTOS HOSE-- HOT \VA rUR INSULATION BOARD
MANHOLE GASKETS P A C K IN G --PU M P,
T rc. ROM S DISC--
III -TEM PERA ! URE R O L L E R S --(HI-TEMP) ROOTING PELT
R O P E --ASBESTO S St ! TYING rilt.KM OCOUPl ES VACUUM CdT A N T T S W IRT --HI T TM P
Tl t CT RIC Al
ASBESTOS BOARD TRANSITE T H ER M O FI.A K E W/ASBESTOS ASBESTOS INSULATED
ASBESTOS CLOTH
ASBESTOS CLOTH BRAKE MATERIAL
ROCKBESTOS (ASBESTOS) ASBESTOS
SYNTHANE G-#HT
PYROTEK
NICOt.ET
METAL
,
FIBER GLASS
THEKMOELAKE
W/O ASBESTOS
INDUSTRIAL WASTE
REM O VAL CO.
11IERM O BEST
FREYPEL
ZETEX
KEVLAR
NEXTEL
N EX T EL 312 (3M)
TUF-TEMP
REERASIL
ZETEX
FBI
REERASIL
SII.T EM P
ZETEX
GATNE #396
SCAN-PAC #RF12
SYNTHANE #G7
FUSED SILICA
ROCKBESTOS
W/FIBER GLASS
FIBER GLASS
ASBESTOS TILE
BRAKE LINING ASBESTOS CLOTH ASBESTOS COVERED M ILL B O A R D
ASBESTOS ASBESTOS GRAPHITE
NICOLET 405
ASBESTOS Fit LED ASBESTOS
INSULATION ASBESTOS Cl OTH ASBESTOS INSULATED Cl FANI NO ASBEST OS COVERED
VINYL TILE WOOD CARPET C ER A M IC SCAN-PAC CARLISLE CORP. KEVLAR ZETEX NON1EX COVER STAINLESS BRAID M A RIN ITE XL EIBERERAX GRC NU BOARD M A R IN IT E PYROTEK (G RAPH ITED #370) (CARBON YARN) TEFLON NEW HUDSON HAW S23 TREATED I'YRO IT IEKM-U-1 FUSED SILICA G R A P H IT E ORGANICS ITITER GLASS PNC TIBER I RAX N E X T E L 312 (3M) REERASIL YARN T Id l .ON COA I ED AMERICAN CLEANING TIBER GLAS^LOVER
JW '
f ta -
1 5
Elim inate corners. star wheels, and dead plates with [Ja il's curved chain conveyor as your surest line from forming m achine to lehr. Save costs, save time, save products! Reduced handling plus open design of the chain (permitting simul taneous heating of chain and product) cut losses from thermal shock.
Available in 6" and 10" widths with configuration adaptable to your needs in terms of length, curves, and radii of turns. Rail's curved chain conveyor w ill fit your plant layout like a glove, and move your products with the sore ness of a glove-protected hand!
SIDE VIEW OF LINK A N 0 HOLLER
Packaging Products, Inc.
R O n o * SJ(X) M uc k .*-> lrxj,,m a 4 /3 0 ? Rh J l / - 747-6 6 /? Of J \7 -747-6687
Frank Breek
Tdburg. The Neihe'is' d
Telex. 52890 BREEK Ni.
Qfuso IINNTTERNATI C ` < MITEO
- r-v
1 6
Circle No. 6 on p. 2*1
r -v A ^ ^
U&'
Some of these substitute materials
were relatively easy to find, test, and
place into service. Some replacement
items have been extremely difficult to
find. Alien an inquiry is sent to a
potential equipment manufacturer, he
is requested to certify that no asbestos
is used in the manufacture of that
equipment. If asbestos is used, he is re
quested to state its form and its use.
This is one method to help control the
amount of asbestos that enters your
plant.
Having found a substitute, the prob
lem is how to dispose of the old
material. The disposal of all material
containing asbestos must be ac
complished under the standards as
established by O S H A and E P A . Some
of the requirements arc as follows:
All material must he collected and
placed in impermeable containers and
sealed.
Containers must be appropriately
labeled and buried in an approved land
mi.
Personal protective equipment
includes: single use air-purifying
respirator, single use disposable
clothing, a separate room to change
clothing.
Most asbestos removals are sim
plified by first soaking the material
with water and then placing in a plastic
bag or removing with a strong vacuum
system.
The important point here is that
there arc requirements to he followed
when removing and disposing of
asbestos-containing material to pre
vent unsafe exposure limits during
handling and for years to come.
P P G is very proud of its ac
complishment in reducing the use of
asbestos in our plants. We will con
tinue the efforts of our group.
Asbestos has been an answer to dif
ficult problems in high-temperature
wot k for many years. It has often been
the predominant material considered.
We arc not suggesting, though, that it
has always been a perfect answer. Our
hope Is we will find other materials
that will do as well, perhaps belter.
Early substitution efforts usually
result in increased costs. W c must ac
cent some higher costs to obtain a bet
ter environment for our employees.
Private industry contends that it can
police itself. Perhaps this is an oppor
tunity to demonstrate our ability and
desire to correct old problems and
eliminate potential health hazards on
our own initiative. Our employees are
the greatest assets w c bas e.
THE G L A S S INDUSTRY/M ARCH 198 1