Document oMmXvjkoxYd5J3XV20vBBvRNg
BID FORM
A&estos Kairwal, Inc. (Company Name)
Submits following proposal for:
ASBESTOS ABATEMENT AT ASARCO, Inc. at Various Sites P.O. Box 1111
El Paso, Texas 79999
By signing and submitting this form, the Bidder is attesting to a site visit of said location, in order
to became familiarwith conditions affecting the work. Successful Bidder agrees to furnish all labor,
materials, equipment, and pay any expenses incurred.:(taxes, travel, per diem, etc.) to complete
work in total compliance with Contract Documents such as but not limited to, Plans, Specifications,
Invitation to Bidders, and any addenda issued therefor
..
The successful Bidder agrees to complete project With conditions set forth in contract documents, Plans and Specifications and time schedule set forth in the Project Schedule in this specification, furthermore successful Bidder understands that five; hundred dollars ($500.00) per day plus Industrial Hygienist and/or air monitoring costswillbe the measure of liquidated damages assessed for each calendar day in excess thereof required to complete the work under this contract.
Bidder agrees to execute the Asarco Contract within three (3) working days for date of notification
ofAward. Bidder agrees to furnish within five (5) working days from notice to proceed, all required
insurance policies covering public and property damage, asbestos occurrence liability, and workman's compensation in the amounts specified in the supplementary conditions of the project.
Successful Bidder shall furnish performance and payment bonds equal to 100% of the amounts
a of the Contract within (5) working days where applicable. Bidder further agrees that he understands the exact scope of the project and that he is willing to perform any increase or decrease in the work in accordance with set provisions of these contract
a documents. Bidder furthermore guarantees that he has become familiar with local conditions, local
laws and ordinances, local permits, and rules that may in any manner affect cost, progress or
a performance of this contract. Owner reserves the right to refuse any and all Bidders for any reason that serves the best interest
of the Owner or building Occupants. Owner reserves the right to waive any technicality or
i irregularity in the project plans and/or Bidder documentation. Bidder understands that to be
considered a successful Bidder, he must include with the Bid Proposal all submittals required
below. Failure to submit required documents and submittals shall be basis to disqualify Bidder at
i bid opening. Disqualified Bidder shall be considered non-responsive and his bid shall not be
Sun City Analytical, Inc. (c)copyright 2000
i
8
ASARCO, Inc. 1 Faso Various Sites 11/00
i
ASARCO ELP 0013828
recorded. This contract will not be awarded solely on lowest bid consideration, the submittal package and the unit prices shall be evaluated for the best responsive bidder.
A. Experience
1. Working experience on the ASARCO Plant (Evaluation points 40%).
2. Experience working with OSHA, EPA and TDH asbestos regulations (Evaluation points 30%).
B. Proof of personnel qualifications, training and experience:
1. Submit Texas State Contractor License to be able to do asbestos abatement work in Texas.
2. Submit name of supervisor and alternate to be used on project. Submit his current medical, EPA approved supervisor training certificate, and Texas State License. This will be used on TDH 10 day notification.
3. Submit name of every worker to be used'on project. Submit his current medical, EPA approved worker training certificate; and Texas State License.
BID ITEM 1: Sulfuric Acid Loading: Remove anddispose of 425 l.f. of thermo insulation from a pipe rack that is about 15 feet from the ground.
Cte thousand cne texted forty seven dollars*Dollars $ 1,147.00 ** Sales tax not included add if
nr:
BID ITEM 2: Environmental Office: Remove and dispose of a minimum of 55 s.f. of linoleum material at the Environmental Office and includes the replacement by stick down tile.
fh Hnrarri piphf hndmi rrimty fivp rWlargDollars $ 1,895.00 ** Sales tax not include add if applicable
BID ITEM 3:
Reverb Plant:
1. Remove and dispose of 70 s.f. of tank ends and 702 s.f. of tank insulation as shown in the bid walk through. 2. Remove and dispose of 350 l.f. of pipe run and fitting insulation material. 3. Remove and dispose of 150 s.f. of flue duct insulation material.
Fifteen thousand four dollarsDollars S 15,004.00 ** ales tax not indufed add if appliraKIp
BID ITEM 4: Yard Office: Remove and dispose of 25 l.f. of electrical wire insulation material at the yard office.
Cte thousand eijftt hundred ninety five dollars
** Sales tax not included add if applicable
Sun City Analytical, Inc. (c)copyright 2000
9
Dollars S 1,895.00
ASARCO, Inc. El Paso Various Sites 11/00
ASARCO ELP 0013829
UNIT PRICES: Additive/Deductive Unit Prices
Removal of linoleum $ 7.50per s.f. seven doUacs & Fifty cents
Dollars per s.f.
Removal of pipe run $ 15.00
per l.f. Fifteen dollarsDollars per l.f. and
fittings from pipe racks above 15' from ground.
Removal of electrical wireS
_______ per l.f. Seven dollars & Fifty cents
Dollars per
Removal of tank $ 12.50per s.f. IMlve dollars & Fifty cents Dollars per s.f: insulation using scaffolds or mechanical lift.
Respectfully submitted:
Asbestos Baioval. line. (Firm Name)
By
__ <Lcu
(AuJthorriizzeeddS: ignature^
Vice EResident (Name Title)
Firm's Address: Phone. .C2LD
FO Box 135C8 fHessg, Texas 79768 333^832
Seal -
Sun City Analytical, Inc. (ejeopyright 2000
10
ASARCO, Inc. El Paso Various Sites 11/00
ASARCO ELP 0013830
SUN CITY ANALYTICAL
*:
TEL No .915-=362-988?
Nov 7.:0 17:45 No.006 P
Specification for the Removal of Asbestos at ASARCO, INC. Various sites Nov. 2000 El Paso, Texas
ADDENDUM NO. 1: November 7, 2000
TO: ALL PRIME CONTRACTOR BIDDERS OF RECORD
General:
1. The following changes and/or additions to the Contract documents shall apply to proposals made for and to the execution of the project manual, date November 7, 2000 This addendum shall be signed and submitted with bid form to acknowledge receipt of. Failure to do so may subject bidder to disqualification.
PROJECT SPECIFICATION Fa\.
A. The bid date has not been extended it remains November 10,2000 at 11:00am (MDST).
B. SECTION 01010 SUMMARY OF WORK Bid Item # 3 has changed. The quantity of 702 sq.ft, of tank insulation has changed to be 365 sq.ft. Contractor shall Bid the Bid Item #3 with this new tank insulation quantity.
Bidder's Signature of Acknowledgment
1 l-8-oo Date
ADPKNl/UM 1 November 7, 2000
ASARCO, Inc.
OK _I_ ASARCO ELP OOI3 S31
Acme Environmental Systems (Company Nams)
Submits following proposal for:
BID FORM
ASBESTOS ABATEMENT AT ASARCO, Inc. at Various Sites P.O. Box 1111
El Paso, Texas 79999
By signing and submitting this form, the Bidder is attesting to a site visit of said location, in order to became familiarwith conditions affecting the work. Sgpessful Bidder agrees to furnish all labor, materials, equipment, and pay any expenses incurre$|$ipces, travel, per diem, etc.) to complete
work in total compliance with Contract Documents suj&i&faut not limited to, Plans, Specifications, Invitation to Bidders, and any addenda issued thi--^
The successful Bidder agrees to complete projec$$ith colons set forth in contract documents,
Plans and Specifications and time schedule set forth in tfrlFroject Schedule in this specification, furthermore successful Bidder understands -.t^f^ffviBti^cfned dollars ($500.00) per day plus Industrial Hygienist and/or air monitoring cost^p^i'^^sure ofliquidated damages assessed for each calendar day in excess thereof req^^fWSltff^l^b the work under this contract.
Bidder agrees to execute the Asarco Con
hin three (3jrUforking days for date of notification
of Award. Bidder agrees to furnish within five (5) working days from notice to proceed, all required
insurance policies covering public and property damage, asbestos occurrence liability, and
workman's compensation in the amounts specified in the supplementary conditions of the project.
Successful Bidder shall furnish performance and payment bonds equal to 100% of the amounts
of the Contract within (5) working days where applicable.
Bidder further agrees that he understands the exact scope of the project and that he is willing to perform any increase or decrease in the work in accordance with set provisions of these contract documents. Bidder furthermore guarantees that he has become familiarwith local conditions, local laws and ordinances, local permits, and rules that may in any manner affect cost, progress or performance of this contract.
Owner reserves the right to refuse any and all Bidders for any reason that serves the best interest of the Owner or building Occupants. Owner reserves the right to waive any technicality or irregularity in the project plans and/or Bidder documentation. Bidder understands that to be considered a successful Bidder, he must include with the Bid Proposal all submittals required below. Failure to submit required documents and submittals shall be basis to disqualify Bidder at bid opening. Disqualified Bidder shall be considered non-responsive and his bid shall not be
Sun City Analytical, Inc. (cjcopyright 2000
8
ASARCO, Inc. BFuo Virion Sites WOO
ASARCO PI P nniSRS?
recorded. This contract will not be awarded solely on lowest bid consideration, the submittal package and the unit prices shall be evaluated for the best responsive bidder.
A. . Experience
1. Working experience on the ASARCO Plant (Evaluation points 40%).
2. Experience working with OSHA, EPA and TDH asbestos regulations (Evaluation points 30%).
B. Proof of personnel qualifications, training and experience:
1. Submit Texas State Contractor License to be able to do asbestos abatement work in Texas.
2. Submit name of supervisor and alternate to be used on project. Submit his current medical, EPA approved supervisor training certificate, and Texas State License. This will be used on TDH 10 day notification.
3. Submit name of every worker to be us^flh project. Submit his current medical,
EPA approved worker trainingrr\ a______ ____________>_______>____ _ a___ ? _____
-Tre__x__a__s/mS*tai_te L_i_c__e___n__s__e_ .
BID ITEM 1: Sulfuric Acid Loading: Remove arid'dispbs of 425 l.f. of thermo insulation from
a pipe rack that is about 15 feet
the gr^rind.
BID ITEM 2: Environmental Office: Rerjj^e and dispute of a minimum of 55 s.f. of linoleum material at the EnvironmehfffOflice and Indodes the replacement by stick down
tile.
One Thousand Three Hundred Dollars
Dollars $ 1,300.00
BID ITEM 3:
Reverb Plant 1. Remove and dispose of 70 s.f. of tank ends and 702 s.f. of tank insulation as shown in the bid walk through. 2. Remove and dispose of 350 l.f. of pipe run and fitting insulation material. 3. Remove and dispose of 150 s.f. of flue duct insulation material.
Fifteen Thousand Three Hundred Tuant-y F-Ivp DnlTars
Dollars $ 15,325.00-------.
BID ITEM 4: Yard Office: Remove and dispose of 25 l.f. of electrical wire insulation material at the yard office.
Four Hundred Fifty Dollars
Dollars $ 450.00
Son City AxutytJcal, Inc. (copyright 2000
9
ASARCO, Inc. BA Vartoui SUB lt/00
ASARCO ELP 0013833
UNIT PRICES: Addftive/Deductive Unit Prices
Removal of linoleum $ 8.00pers.f. Eight dollars QQ/100 p0||are oers.f.
Removal of pipe run $ 20.00per I.f. Twenty dollars OO/lOOBollars per l.f. and fittings from pipe racks above 15' from ground.
Removal of electrical wires 20.00per l.f. Twenty dollars 00/100 Dollars per
Removal of tank S50.00per s.f. Fifty dollars 00/100-- Dollars per s.f. insulation using scaffolds or mechanical lift.
Respectfully submitted: Acme Environmental Systems
(Firm Name)
^umonzea signature;
(Name Title)
Firm's Address: 3804 Volcanic Ave. El Paso, TX 79904
Phone; T9151757-1835
Seal-.|?i /' .j.
Sun City Analytic*], Inc. (e)coj>yrifhi 2000
10
ASARCO, Inc. Qhn Vsrious Sites 11/00
Specification for the Removal of Asbestos at ASARCO, INC. Various sites Nov. 2000 El Paso, Texas
ADDENDUM NO. 1: November 7, 2000 TO: ALL PRIME CONTRACTOR BIDDERS OF RECORD General:
1. The following changes and/or additions to the Contract documents shall apply to proposals made for and to the execution of the project manual, date November 7, 2000 This addendum shall be signed and submitted with bid form to acknowledge receipt of. Failure to do so may subject bidder to disqualification.
PROJECT SPECIFICATION A. The bid date has not been extended it remains November 10,2000 at 11:00am (MDST). B. SECTION 01010 SUMMARY OF WORK Bid Item # 3 has changed. The quantity of 702
sq.ft, of tank insulation has changed to be 365 sq.ft. Contractor shall Bid the Bid Item #3 with this new tank insulation quantity.
Dafe
ADDENDUM 1 November 7,2000
ASARCO, Inc. SHEET I OF_L
ASARCO FI P