Document oDyezgjXL6gb6Yjgw2KweJ98
U. 3. Yates - General Offices
October 2, 1967
Minutes of Meeting Held 9/29/67
CKA 1800 - Aroclor Expansion - WGK
Messrs. Present
V. W. Brawloy J. A. Oloeckner O. A. Meyer
K. r. Bay
k. S. Yates
H. C. Carder - GO P. E. Heisler - >vGK R. P. Stevens - CED
Review of the proposed Dept. 246 design with emphasis on distillation system design was made. Following is a summary of conclusions and future plans.
1. Final product quality is affected by the external gas fired heaters. Our quality should improve with indirect fired units.
2. Boildown overheads should not in any case go to electrical grade storage but should be segregated.
3. The intermediate storage tank for 1142 should be a plus factor in final quality by providing aging time.
4. D. Armstrong will add to his laboratory work schedule the following iterns>
a) Determine if air blowing of Aroclors is actu ally required.
b. Determine a feasible method for monitoring Aroclor quality at the end of the distillation and/or during absorption to eliminate surge tankage.
c. Determine if we can feed the continuous chlor ination system with a stream of biphenyl and a stream of Feel, in Aroclor 1242 (0.4% concen tration) .
5. Only one 1000 gallon surge tank will be included at the end of the absorption train instead of 2 X 2000 gallon tanks previously thought necessary.
il & MaK
R. s;. Yates
vo
0129763
TOWOLDMONOQ45176
TOWOLDMONOQ45177