THE DOW CHEMICAL COMPANY ELECTRICAL TECHNOLOGY GLOBAL
ADMINISTRATIVE GUIDELINE G7A-0099-01
14-JUN-1996 PAGE 1 OF 2
ELECTRICAL SAFETY AND RELIABILITY AUDIT CHECK LIST FOR
INCOMING ELECTRICAL SERVICES
INCOMING SERVICE LOCATION I.D. #:
INCOMING ELECTRICAL SERVICES
Yes No
N/A
1. Are all the oil-filled devices (oil-filled cutouts, transformers, capacitors, etc.) non-?C3?
2. Are all the insulators for the line, switch, terminator, etc., clean?
3. Is the messenger or static wire grounded at the pole base?
4. Are the lightning arresters properly connected and grounded?
5. Is the pole switch operating mechanism in good working order and free of corrosion?
6. Is the pole switch operator handle properly grounded?
7. Are all the equipment and cables - :erlv supported?
8. Is there physical protection (bare, ide fence, etc.) provided at grade for underground conduit risers?
9. Does the plant have dual feeders
10. Does the plant have transfer capability.
11. Has there been a successf
12. Is the transfer automatic upon the loss of power?
13. Are the cables adequate supported?
14. Are the cable support blocks oonscructed of NON-MAGNETIC Materials?
/
..UL-
DO A 044987 CONFIDENTIAL
THE DOW CHEMICAL COMPANY ELECTRICAL TECHNOLOGY GLOBAL
ADMINISTRATIVE GUIDELINE G7A-Q099-01 14-JUN-1996
PAGE 2 OF 2
Yes No N/A
15. Is the pole-line hardware adequate?
16. Are the lashing rods made of corrosion resistant material?
17. Is the wood pole in good condition?
18. Are oil fused cutouts in good condition?
19. Is the pole mounted transformer or capacitor free of leaking oil?
___________
V- -
II/------ ------
S
20. Are fences grounded?
21. Are the coordinates of underground cables known
and on drawings?
(S'
Incoming Electrical Services Index Score:
J
044988