Document oDo8YdpoEjdqVwpwQ8MabnrXo

f MV PCB EMERGENCY PLAN fi ( s Vita J.J. Zeman et al January 9> 1976 Dsw 330311 STLCOPCB4076955 PCB EMERGENCY PLAN 1. Scenario 2. Preliminary Actions 3. Emergency Plan A. Immediate B. CAC Decisions C. Follow-up 4. Telephone List DSW 330312 STLCOPCB4076956 SCENARIO DSW 330313 STLCOPCB4076957 1. Scenario The plan assumes an immediate ban on production, sale fi or use of PCB before volume production of MCS 1238 is ready. It is recognized that the actual circumstances may vary from this scenario, so provision has been made H to review the plan to assure that it fits before com mitting publicly to the indicated policies. - Responsibility for verification of existence of a ban, ' initiation of this plan and verification of acceptance of responsibilities: R.G. Potter 1ST i DSW 330314 STLCOPCB4076958 PRELIMINARY ACTIONS DSW 330315 STLCOPCB4076959 2. Preliminary Actions a. Persuade customers to accelerate MCS 1238 approval programs. Responsibility: D. Wood (contact by 2/15/76) I b. Confirm no continuing contractual obligations to supply. fF* Responsibility: D. Wood (12/31/75) (Done) ( c. Prepare survey of Askarel equipment used by Monsanto. Responsibility: G.L. Bratsch (request to GLB by 12/22/75) (Done) d. List corporate sales to all dielectric customers. Responsibility: R.E. Hatton (MICC 1/31/76, Corp. 3/31/76) e. Prepare Tentative P.R. statement. Responsibility: D.R. Bishop (1/1/76) (Done) \ f. List names of contacts to call at all customers. Responsibility: D. Wood (1/31/76) g. Define detailed decontamination procedure for use at Krummrich and possible adaptation for customers. Responsibility: J.R. Savage (1/22/76) [ h. Prepare recommendation on advice to customers re decontami nation. y. Responsibility: 1 D. Wood (2/15/76) i. Develop list of publications for potential ad campaign. i Responsibility: D.R. Bishop (12/19/75) DSW 330316 STLCOPCB4076960 IMMEDIATE ACTIONS DSW 330317 STLCOPCB4076961 3. Emergency Plan A. Immediate Actions Timing Action Day 1 1) Suspend chlorination operations. Suspend shipments from Krummrich Plant and warehouses (Santa Clara, Elizabeth, Los Angeles). Do not recall shipments enroute. Finish any distillation batches under way. Responsibility: R.A. Pohl Contacts: Krummrich Plant ' A.E. Leisy U0 R.W. Flint Warehouses E.M. Potter C.B. Sigler Day 1 2) Communicate to customers regarding suspension of shipments. Emphasize 1 that this is a preliminary response pending clarification of government s and corporate positions. Responsibility: D. Wood Day 1 3) Make preliminary press release (pre pared in advance) stating that operations have been suspended and supplying background information on our PCB con trol efforts, status of replacements. I Responsibility: D.R. Bishop NOTE: First confirm that action (1) p above is in force. DSW 330318 STLCOPCB4076962 Timing Action Day T 4) Communicate situation to other affected Monsanto operations. -Krummrich production planning - D.T. Mayer -Process Chemicals Marketing l (CS Acid, Muriatic) - J.F. Winkler -Anniston Plant (Biphenyl) - W.E. Voss E -Purchasing (TCB, Drums) - B. Ryrne Responsibility: E.M. Potter Day 2 5) Determine precise details of ban: Marketing (D. Wood), Product Acceptability (J.C. Weber), 0 Washington Office (W. Easley), Legal (W. Withers/T. Bottini), and report to Business Director. Coordinating Responsibility: D. Wood Day 3 6) Review this plan to determine whether it fits the circumstances and make recommendations to the CAC on policy and implementation. Responsibility: R.G. Potter OSNN STLCOPCB4076963 CAC POLICY DECISIONS 33o^o STLCOPCB4076964 B. CAC Policy Decisions PJ After the precise nature of the ban has been determined, recommendations will be made on the following points (revised as indicated by the nature of the ban). [ Domestic 1. Date of final production. 2. Shipment of inventory. 3. Customer commitment to orders on books but unshipped. 4. Incinerator returns (maximum rate 300,000 pounds per month). I a. All returns invoiced a price to fully cover incineration cost. L' b. All customers given equal opportunity to use service. c. COP to be set up to handle. d. Alert other incinerator services of our policy. 5. No change in policy on refusal to ship transformer makeup requirements to transformer users. They should 1 still obtain product from transformer manufacturer. 6. What assistance we will give on customer plant decontamination. a. Capacitor/Transformer manufacturers. b. End users -- will refer to equipment manufacturers (let our customers know we will do this). 7. Position on replacement fluid from Monsanto. U.S, Export I 1. Recommend cease shipments two months after we cease domestic shipments. a. Documentation/L of Credit/Import licenses involve \ longer lead time and possibility of legal liability if we shut off immediately. b. Additional flexibility in inventory run down. Ex-U.S.A. a. Maintain U.K. production and take separate decision within one month of a U.S. ban. b. MESA should avoid commitment to long term supply contracts. DSW 330321 STLCOPCB4076965 FOLLOW-UP ACTIONS DSW 330322 STLCOPCB4076966 .S' '* i.* r . _ , . _5T * i . _ V * T- H V-\ C. Follow-up Actions After CAC Approval of Detailed Policy Timing Action S Day 4 1) Appoint Administrative Coordinator for 3-6 month period. 1 Responsibility: R.G. Potter Day 4 2) Briefing meeting to define policy and announce appointment of coordinator to: a) Business Group b) COP n cl Sales Force d) Research e) P.R. f) Washington Office Responsibility: R.G. Potter Day 4 3) Notify Customers by: a) Telephone to most senior management contact -- Marketing Day 5 3) b) Certified express letter to: -- Office of the President -- Purchasing Manager of use locations -- Confirmation to telephone contact (NOTE: Direct all immediate customer (tint/ responses to Marketing Group.) L Responsibility: D. Wood F Day 5 4) Notify Manufacturing, Company-wide, to minimize impact on operation of Askarel units. Responsibility: R.A. Pohl to G.L. Bratsch DSW 330323 STLCOPCB4076967 Timing Action Day 5 5) Resume production and shipments as permitted by the approved policy, if y . any. Responsibility: R.A. Pohl i E.M. Potter ' Day 5 6) Brief corporate marketing directors with other sales to dielectric customers on policy. Responsibility: D. Sliney p Day 6-8 7) Notify Federal/State agencies of policies. Responsibility: Washington OfficeW. Easley Day 5 8) a. P.R. release on policy. n; Day 6 8) b. P.R. prepare Q&A sheet on policy. * Day 10-15 8) c. Arrange series of paid advertisements Responsibility: D.R. Bishop , Day 6-7 9) Prepare form letters a. Transformers users b. Capacitor users y Responsibility: D. Wood P Day 8 10) Brief U.S. Export Managers on export policy. Responsibility: C. Paton/D. Wood DSW 330324 STLCOPCB4076968 Timing Week 2-3 Action 11) Management/Marketing meetings with customers Responsibility: D. Wood Week 2 12) Notify U.S. Export customers of policy. Responsibility: Area Managers Month 2 13) Upon completion of final customer ship ments, move all Monsanto PCB inventories to Krummrich incinerator. Responsibility: E.M. Potter Month 2 14) Initiate decontamination of Krummrich PCB facilities (see detailed decontami nation plan). Responsibility: R.A. Pohl o***"* STLCOPCB4076969 TELEPHONE LIST DSVJ 330326 STLCOPCB4076970 4. PCB Emergency Plan - Telephone List R.G. Potter Office 4-2142 Home 469-1835 Manufacturing R.A. Pohl A.E. Leisy R.W. Flint D.T. Mayer W.E. Voss 4-2243 812-2019 812-2043 812-310 823-205-293 991-5455 966-5608 849-0758 618-286-3483 205-237-5834 Marketing C. Paton D. Wood 4-2529 4-2623 227-7581 536-2161 Medical/Prdto Acceptability J.C. Weber Dr. G. Roush W.B. Papageorge 4-2027 4-2191 4-2086 961-7693 997-2234 878-3513 Legal W.W. Withers T. Bottini 4-2851 4-2872 227-8345 725-0677 Distribution E.M. Potter C.B. Sigler R.A. Sipes 4-2443 4-2428 4-2431 567-6043 618-234-9945 821-0938 Washington Office W.K, Easley Public Relations D.R. Bishop 821-4548 301-299-9587 4-2891 469-1377 & STLCOPCB4076971