E. T. Still May 24, 1988 Page 2 The Dalles - FPD D. Johnson performed an industrial hygiene survey for CTPY, noise and asbestos. Thirteen (13) bulk samples were obtained for asbestos identification. The Retort Building has several hundred feet of pipe insulation and two boilers that have been insulated with asbestos-containing material. A recommendation has been made to the facility to begin a planned abatement program. Miscellaneous D. Johnson prepared a letter to S. Allen, Director of State Department of Labor Asbestos Division, requesting guidance in removal of asbestos from inservice steam pipe at the Sequoyah facility. As of May 1, he has not responded.