Mr. Bill Stewart, P. E Executive Director Texas Air Control Board 6330 Highway 290 East Austin, Texas 78723
JJF-133-82
October 14, 1982 CERTIFIED MAIL 5381526
Dear Mr. Stewart:
The Celanese Chemical Company, Inc., plant at 3ishop, plans to reclaim about 1300 feet of steel pipe ranging in size from 1" to 10" in diameter. This reclamation work will start November 1, 1982. The pipe is insulated with friable asbestos insulation, so insulation will be removed as the first step, and landfill in the designated asbestos landfill located or. the plant site. All precautions, outlined in 40 CFR 61.20-61.25, will ' be observed.
This letter will serve as a notification of this work, as required by 40 CFR 61.22 (d) (2). The attached data sheet lists all the pertinent uaca.
Please contact me if you have any questions or comments.
Vary truly yours
//
f iy`
yj>' J- Fritsch, Jr. Plant Manager
JJF/rgs Attachment'. bcc: Mr. J. Garza
Mr. J. F. Harper Mr. T. L.'Markham Mr. W. H.-Meyer
Austiir Mr. R. K. Goleraon
A.B.I., Bishop Mr. Juan Gonzalez
CCCTC Central Files (2)
BISHOP CENTRAL FILES: 202.1
.NC. 3GX i23. 3ISJ-C?. "X TS3
004267
npT ne *
NOTIFICATION INFORMATION - RECLAMATION
I. OWNER;
Celanese Chemical Company, Inc.
II. ADDRESS:
P. 0. Box 47320 1250 West Mockingbird Lane Dallas, Texas 74247
III. DESCRIPTION:
Remove friable asbestos insulation from 1300 linear feet of steel pipe ranging in size from 1" to 10" in diameter.
IV. ADDRESS OF SITE:
Chemcel Plant Celanese Chemical Company, Inc. P. 0. Box 428 Bishop, Texas 78343
V. STARTING AND COMPLETION DATE:
Start - November 1, 1982 End - November 19, 1982
VI. NATURE OF RECLAMATION:
See III above.
VII. PROCEDURE:
Wet insulation thoroughly, strip off insulation, pack in plastic bags and landfill in registered (on-site) landfill.
VIII. LANDFILL SITE:
Texas Department of Water Resources Registration No. 30084 EPA I.D. No. TXD008113441