Document o9wJjG5g21965Y3bVYZ1yqmbX

r/.c anto or y. 3. PAPAGEOaGE - ST. LOUIS SEPTEMBE^T^TTP^ / -.(:.**' ' ^CB ENVIRONMENTAL PROBLEM ALOliST-^'PATUS REPORT TO D. S. CAMERON - BRUSSELS w. s. CLARK J. R. BURLAND - TOKYO M. W. FARRAR - 2ND STREET E. V. JOHN R. E. KELLER - 2ND STREET R. M. KOUNTZ D. A. OLSON ?. S. PARK W. R. RICHARD T. R. SAVAGE V E. P. WHEELER H. S. BERGEN J. MASON MARKETING: The withdrawal from the market of PCB containing Arociors for plasticizer applications has been completed. All orders for these products which were received up through noon on August 31, 1970 were shipped. The only product area where we were left with an Inventory was in -the toluene blends of Aroclor 125^/1260/1262. The exact amount of the inventory will be determined the first week in September, however, it should be less than 20,000 pounds. Orders for samples find small production runs have been placed for Arociors 60^0, 6050, 6062, and 6070. While it is certainly too early to predict the degree of success of our replacement program, it appears that some accounts have made significant progress in reformulating with Monsanto products. Letters have been sent to Pydraul F-9 customers notifying them of the product reformulation. Production of F-9A 13 scheduled for the next required run. NEKA has recommended that American National Standards Institute form a committee to provide guidance on PCB in -the electrical industry. The committee will be made up of electrical equipment manufacturers, consumers, governmental agencies, and Monsanto. Purposes will be to: 1. Issue maintenance guides, proposed labeling instructions, ett. 2. Speed development of disposal systems. 3. Actively coordinate with International committees. ; PLAINTIFFS f _ -1 EXHIBIT \0.. i 3 \\ DSW 013975 HARTOLDMON0012166 2 ENGINEERING: Vaate Incineration - CEA 2415 An approved project scope report has been Issued, and an appropriation request data transmittal was issued. Pre approval funds were provided by the General Manager for definitive design and the purchase of long-delivery equipment. An incineration package was ordered, and definitive design is underway on the balance of the project. Aroclor Distillation - CEA 2417 An approved pro Ject scope report has been Issued, and an appro priation request data transmittal was issued. Pre-approval funds were provided by the General Manager for definitive design and the purchase of long-delivery equipment. Preparations are underway to clean, Inspect, and dismantle the phthallc column and condenser at Chocolate Bayou. Definitive design is In progress. Tributyl Phosphate - CEA 2371 Thi3 portion of the "New Phosphate Expansion t-'roject for the E- Building" has beer, isolated, and a separate preliminary' project scope report was developed. This latter scope report has been issued for review and cost estimate. p-Cumylphcnol An evaluation report was issued to members of the Eusiness Group and others for review and comment. N-C Phosphate Work was deferred pending success in Research of a modified process and for breaking out the tributyl phosphate project CEA 2371. Based on new Research data, engineering work can be resumed when manpower is available. EUROPE The Norwegian Government has reportedly introduced controls whereby PCB will be placed on a restricted list. All users will have to be registered and will also need a permit to U3e PCB. Ve are seeking copies of the control regulation. Meetings with the other West European PCB manufacturers have yielded a more positive response than anticipated. There is a good deal of sympathy for Joint action following the North American pattern, and the implications of unilateral Monsanto action are appreciated. Timing 13"a" problem and if they cannot act as quickly as us, then an acceptable compromise solution seems probably. DSK 013976 HARTOLDMONOQ12167 3- EUROPS (continued) Draft copies of the N.i.R.C. report on the Irish Sea Incident have been sent to the various contributing bodies. We have not yet seen a copy ar.d are seeking one. JAPAN No new developments. MEDICAL Reports on the chronic dog toxicity studies through the first year of the two-year project have been received. The reports on the rata have been delayed awaiting micropathology. The other projects, i.e. rat reproduction, chicken reproduction with 12423, repeat fish toxicity studies, and the projects on M.IP3 and KB--40 are on schedule. Of particular Interest, it may be noted that MIPS has been classified as "extremely irritating" to the sklr. as a result, of the standard rabbit skin tests. * Three publications referring to research on PCB In the environ ment ("Toxicity to Mammalian Creatures and the Development of Protocol for Toxicity to Aquatic Animals") appeared in the May/ June issue of the Bulletin of Environmental Contamination and Toxicology. Copies are being circulated. ' PUBLIC RELATIONS* Use of our July l6 news release on PCB increased during August. Cur practice of following up each PCP story rflr.h our news release - to those media who did not receive the initial mailing -- seems to be Diving dividends. The Booth Newspaper chain in Michigan OSW 013977 HARTOLDMON0012168 4- PU3LIC RELATIONS: (continued) waa the first to run our release. Other major dallies Include the Austin Statesman, Milwaukee Journal, San Francisco Examiner, Akron Beacon Journal, St.Louis Post-Dispatch and the St. Louis Cl obe-Cemocrat. Trade publications using the release were the Oil Daily, Chemical Week, OP&D and C&E News. Work continues on a Monsanto Magazine ar:icle for the winter issue detailing our actions in solving the PCB problem. RESEARCH Carbonless Carbon Paper Solvents The "happiness curve" for MIPS at NCR improved with favorable results from preliminary testing on odor, eye irritation and patch test irritation by their consultants. Hilltop Laboratories. More detailed tests 'are to follow, however, NCR have been supplied 10,000 - 12,000 lbs. of MIPS from Queeny Plant productlon in July and are preparing large quantities of commercial NCR paper for testing by their customers. Results from these latter tests are not expected for four months. Meanwhile, as an emergency stop-gap measure if needed, NCR 13 anxious to qualify MIP3 of a composition which would not require a fractionating column for production. We will supply this grade, along with additional orders for the regular grade MIPB from the next production run at the Queeny Plant. Higher alkylated biphenyls (butyl thru C&t 8| iq) have a11 given poor performance in print fade properties and are no longer of serious interest. NCR have initiated a fundamental study of the print fade problem. Our studies of print fade suggest that the problem is caused by light and "excess solvent. WayB for minimizing or eliminating print fade are also under study in our laboratories. Four additional solvent samples were sent to Nashua to.zero in on the required viscosity and dye solubility in their equivalenc of NCR paper. We also agreed to supply NCR a sample of alkylated terphenyl (Santowax R) in order to provide an in extremis material for their evaluation. " Aroclor Replacements for Poly3ulfldes Our alternate replacement products have met mixed reaction m the field. Suggested blenda of Aroclor 5460/S-261 or QSW 01397 HARTOLDMON0012169 RESEARCH: (continued) -5 - ; S-16O were rejected by Thiokol because of doubta concerning the use of any chlorinated aromatics. Other customers are evaluating suggested blends but have not yet finished reformulations. It is apparent that aggressive presentation of a new product (not simply a replacement) is needed at Thiokol. At present our best experimental candidate is B-phenoxyethyl benzyl phthalate. It is hoped that sufficient quantities for customer eviuation can be made In the near future. MCS-1016 Drum lots of MCS 1016, (fractionated Aroclor 1242) were sent to G.E. , A'jrovox, Westinghouse-Bloomington and Pittsburgh, Sangamo, Cornell Dubiller, Hercules, Mitsubishi Monsanto, McGraw Edison, PR Mallory, Monsanto P.uabon, Sprague, Electronic Components for evaluation in capacitors. This new fluid removes Clc and Clfi chlorinated biphenyl isomers to aid biodegradation. G.E. reports that 6-12 months will be required for full evaluation depending on assessing the degree of risk in making the new fluid sub s tltutlon. Aroclor 1242 Fractionation Column Bottoms Aroclor distilled from Aroclor 1242 fractionation column bottom contains crystals when cooled to 20C. Mass Spectrophotometry indicates that these crystals are tetra-chlorinated biphenyl. Aroclor 1242 bottoms containing the crystals were chlorinated to Aroclor 1254 and tested for insolubles. The laboratory produced Aroclor 1254 did not produce crystals after seeding and cooling to 0C overnight. Reclaim Aroclor Jard #2 Aroclor 1242 was analyzed and proved satisfactory for reclaim into Pydraul 312. The material was free of low boilers with less than .01% hydrocarbon. Krummrich began processing of Westinghouse-South BostQri tank car Batch #1 material. Ibis material was purified by batch distillation discarding the first 20% cut. Ruabon has followed reclamation of Pyranol 2 from BICC at Dalton to provide a reclaim service on electrical grade Aroclor in England. DSW 013979 HARTOLDMON0012170 -6 - Removal of Aroclor 1221 and 12^2 from Water Waste Streams - A sand prefilter 3 1/2" diameter by 5 1/2" deep bed and a carbon bed are being evaluated to remove Aroclor from waste water at - AnnlBton. The concentration of Aroclor waa reduced from >1000 ppb to > 10 ppb by adsorption. Fifty gallons were passed through a 3 1/2" x 5 1/2" adsorbing bed before detecting *1.0 ppb Aroclor. NC Phosphate Ester 300 pounds of satisfactory product were produced by rewashing production trial material in the Pilot Plant. A trial washing run of production Batch 8 in the Podbelniak centrifuge at Eaker Perkins was successful in eliminating emulsions. Soluble salts were 8 ppm. However, two batches reworked in the pilot unit using tap water and longer hold and washing cycles had unsatisfactory 0 & C performance. Research doesn't know'why the material is out of specification. 33000 lbs. of material has not been successfully reworked because of lack of satisfactory rework process. Pydraul 312 Line Replacements Two reformulations of Pydraul 312 were investigated. The first contains Aroclor 5^32CDP, DIDA and petroleum oil. This fluid is slightly more FR than 312. The second reformulation, without halogen, will depend on finding a solubilizing agent for oil and aromatic phosphate ester. Fatty acid esters are used in the D. A. Stuart DASCO FR 300. Water-Glycol Fluids A second production run was made on the water/glycol blends. Mo problems were encountered. Aroclor - Environmental Program - St. Louis The analysis of rat tissues (fat, kidney, liver and muscle) from the Industrial Bio-Test 30-bay tissue collection study have been completed. The samples (72) were analyzed as outlined in Analytical Chemistry Method No. 70-1 and the PCB levels were estimated using the Aroclor fed as the standard. The results agreed very well with what is being observed environmentally, namely that the estimated PCB levels found in all tissues de creased as the degree of chlorination decreased (12607125^712^2) and increased as the dietary level increased. The isomer distribution of all Aroclors fed were also markedly altered. A more detailed report has been issued. 05k* 013980 HARTOLDMON0012171 -7- RESEARCH: (continued) Several JFQ. plant sewer water samples (4) ware analyzed for PCS'*. The N. trunk sewer contained less than 47 ppb, the S. trunk 147 ppu, a June composite sample from the main sewer effluent 46.0 ppb, and a July composite sample from the main sewer effluent, 43.5 ppb. In all cases, the ?CB was identifiable as Aroclor 1248. A second set of PCE/alr samples (6) were analyzed for the Appleton Coated Paper Company. As in the past, the results were forwarded to them for interpretation. Samples of mold sand used by Ford-Dearborn (2) and GMC-Pontiac (l) were analyzed for Aroclor 1242. The amounts found ranged from 80-1200 ppm. The analysis of a variety of fish for PCS (31) collected during the semi-annual survey of the Choccolocco Creek have been completed and a report iesued. A second set of fish samples (4) from this area are in hand and analysis of these will be completed this week. PCB's have been observed in a number of carp and catfish (7) taken from the Mississippi river around Kimmswick, Mo. The levels found were, with one exception, in the low ppm range (> 10 ppm). Six (6) water samples from the JARD Company, Inc. have been analyzed for PCB's to establish if they have a significant effluent problem. PCB's were detected in all samples. A report i3 being written. , EC/GC support at the rate of 10 samples/day is being provided for the semi-continuous activated sludge degradation study of Aroclor 1130, 1242, 1254, and MCS 1016. These studies were started 8-10-70 and will run approximately 30-60 days. r A study to Isolate and identify potentially toxic oxygenated impurities in Aroclors has been initiated. No compounds of this type have been observed in Aroclor 1260, Lot AX-3; detection limit ca 2 ppm. Higher levels of chlorinated naphthalenes have been observed. Aroclor 1242, Aroclor 1254 and the competitive product Pheneclor DP 6 will be investigated by this procedure. DSW 0139 81 HARTOLDMON0012172 . -8 - ' Environmental Studies - Ruabon The .VERC report on the Irish Sea Incident ha3 not yet been published, but copieo of the draft-have been sent to the contributing bodies. have now made a written request for a copy of this draft, but do not yet Jcnow whether thfi will be approved. A further meeting on PCS analysis has been arranged by the Ministry of Agriculture, Fisheries and Food to take place late in September. A paper has been prepared for presentation at the CIORE conference in Paris this month on the PC3 pollution problem as it affects tne use of askarels in the electrical industry. This is Intended to generate discussion amongst askarel users. Biodegradation Testing - St. Louis Testing of Aroclor 1242, Aroclor 1254, MCS 1016 and fractionated Aroclor 1330 in our semi-continuous activated sludge units 13 now in progress. These units are being fed at a daily rate of one milligram under Identical conditions to permit a comparison between our present Aroclor products and the proposed substitutes. EC/GC analyses for the first weeks of operation have been . completed except for calculations. River die-away tests are now being started on these same products. Biodegradation - Ruabon Thirteen day exposure of MCS 1016 to biphenyl-active soil culture (C2) has produced considerable degradation of all major peaks . in the chromatogram. Exposure will be continued to 83 days. Qualitatively It appears that degradation is greater than for Aroclor 1242, but identification and quantification of residues must be accomplished to provide adequate definition of the extent of degradation. Thirteen day exposure of MCS 717 to- Cp shows considerable de gradation. Qualitative Judgement indicates more degradation than for Aroclor 1242. MCS 7o2 is also being examined. , * 'Work or. the key hexa and penta chlorinated isomers has continued using C2. Increasing agitation has failed to Induce degradation so far, but work in which lower chlorine Isomers have been added to Increase solubility, is in progress. The degradation of H3-40 lc being assessed. Sample has been exposed to C2. Analytical work is in progress, but the complexity of the chromatograms has caused some delay in interpretation. Development of OLC techniques to provide greater selectivity in the analysis of PCB's is proceeding satisfactorily. QSU 013982 HARTOLDMON0012173 9- - MANUFACTURING Anniston ^ Regulatory Action In early August, the Alabama Water Improvement Commission informed the plant that FDA had furnished them with fish flesh analyses from samples taken in the Choccolocco-Coosa River Watershed, indicating appreciable levels of Aroclor as well as DDT metabolites. Mercury was also present at low levels. The plant's previous informational contacts with AWIC had prepared then for receiving this news. Dae to a high level of public concern about a ban on fishing in some state streams having high mercury level, an intensive program was started immediately to correct remaining major Aroclor discharges. This program will be discussed with AWIC in September. L^^Current Level Aroclor losses during August increased to a level of 7280 ppb in plant effluent, equal to 88 #/day. This increase corresponds to high turbidity of the effluent from limestone inert material as the settling capacity of the- final acid treatment pit has deteriorated since last cleanout." ' Process research studies Indicate that removal of solids will result in removal of Aroclor. ^ Plant Effluent Suspended Aroclor Control The Aroclor department sump was put into service on August 12, tnree weeks ahead of target, and is controlling at the 100 ppb level in department effluent waters. Second phase is being separated and a high-Aroclor scum is being collected on sump surface. An experimental mechanical skimmer will be Installed in September for evaluation in removal of this scum; tests with polyelectrolites in agglomerating this scum were not productive. ,. Final Effluent Treatment T July and August samples from Aroclor sources Indicated that ' the final neutralization pit is now a major remaining source of plant effluent levels. Previous practice in pit cleanout has not been adequate to remove accumulated material, and limestone inert solids apparently are an effective adsorbent in tne pit environment. A two phase program based on these fact3 1 s underway: 1) a second, uncontaminated pit will be put into service by mid-September to permit shutdown and decontamination of the permanent pit and to develop procedur-.n for alternate operation cleanout without loss of neutralization or sollds-settllng capability. Concurrently, gross introductions DSU 013963 HARTOLDMON0012174 10 MANUFACTURING: (continued) of Aroclor Into the sewer system are being stopped with the Aroclor department sump, new operating and housekeeping procedures, and cleanout of potential collection points in the sewer system. This program Is targeted for mid-September completion and should reduce plant effluent to the 200-300 ppb level that Is seen In source point water phase analyses. An initial reduction in water use - 100 gpm out of 700 gpm has been accomplished through a checkoff list. Longer term, Immediate steps are being taken to develop feasibility and costs of effluent solids-Aroclor reduction through continuous coagulation and clarification. Major vendors in the water treating field are being consulted with a final proposal targeted for December 1. Six projects for water reduction and improved housekeeping are underway and are being expedited. 1. Installation-of concrete pads and curbs in major spill areas to replace chat. 2. Reuse water in Aroclor department still Jets and blowtank scrubbers (reduce water-Aroclor contact target 100 gpm). 3. Reuse water in Muriatic Acid department fume scrubbers and absorbs?final scrubber and divert acid sewer through Aroclor department sump. (Reduce water-Aroclor contact target - 100 gpm). 4. Upgrade HC1 off-gas organics removal system to Improve efficiency. 5. Provide a collection system for carbon tower spent carbon to prevent spills to sewer. 6. Further water reductions by re-routing Parathion phos phoric acid wastes. gulk Waste Disposal ,' Data has been gathered on all solid materials to be collected and disposed of. This data has been reviewed and will serve as the basis for scoping a collection system and Incinerator. A report will be issued in September on the- use of fuel oil to dilute Montar for improvements in handling and pumping for incineration. 0S* 013984 HARTOLDMON0012175 11 MANUFA CTURING; (continued Sauget PC3 Levels In Sewer Current losses to the river are about 30 to 35 #/day. WGK laboratory i3 now training analysts in routine analysis of PCB's in sewer samples. This should be completed by September 4 at which time 3 to A samples/day will be analyzed. One of the two chromatograph deteotor3 was found faulty and has bean returned to the manufacturer for repair. Although the instrument is operable on the remaining detector, some instrument time loss is experienced. - Projects to Reduce Sewered PCB's from Aroclor Department Blow tank demister (E3t. 2031) design package completed. Project construction will begin in September. Process Amendment has been prepared and is being circulated for approval. Estimate being prepared for about $30,000 to provide paving, curbs, trenches and batch basin in tank car and tank truck loading areas. Aroclor Incineration Estimate 2292 for $7,419 capital and $4,700 expense submitted. Project will privide 150,000 gallons of storage for waste PCB's until incineration facilities are started up. Two to three weeks will be required to complete this project after approval is received. At this time, no bulk aroclors are being dumped at the sanitary landfill. PC3 Levels in Atmosphere r Report published which covered points of loss. It was pointed out that most severe vapor losses were from Therminol units in Depts. 239> 245, 248 and 255- To spur action, a meeting was held on August 17 with Bill Papageorge and Don Roush to give general philosophy and technical assistance to those responsible for correcting these problems. Target date of 9/1 for obtaining samples has been missed. A special grade of toluene is needed for the sampling device and should be received during the week of 8/31. We should still meet our target date of 9/15 for setting air emission targets for Dept. 246 and the plant. OSW 013985 HARTOLDMON0012176 12 MANUFACTURING: (continued) Newport Rwflo/al of Suspended Aroclors from Plant__Effluent r,f Installation of sump level alarms now 80^ complete. Analysis of Newport plant effluent for PC3 between July 1 and August 5 showed an average level of 37^ ppb, with a range from less than 10 ppb to 2,500 ppb. The higher figures are thought to be due to leaks and spills and are still under Investigation. 37^ ppb of PCB is equivalent to approximately 3.74 lbs./day. Spll13 Drip trays have now been provided under seals of Santotherm pumps on 4NDPA plant. Work Orders have been Issued for the installation of a bunded area around these pumps. Atmospheric Emission Preliminary Progress Report No. SQ IO306 issued. A list of twelve points to be sampled has been drawn up. Analysis work will be started as soon as the necessary sampling apparatus has been made up. The points to be sampled, and the expected levels of PCB are: Source . Estimated Loss 1. Santotherm expansion tank UNDP A plant 0.5 lbs./day 2. Santotherm expansion tank Santolube 900 plant 3. Aroclor P.P. storages U. Still bottoms area, ) 5. Chlorination circulating pumps ) 6. Chlorination operation floor ) 0.5 lbs./day 1 lb,/day Anticipated to be In range , 1 to 5 mg/nr of PCB concns. 7. Tanker and tote bin loading shed ) 8. Still ejector exhaust j 9- Drumming off area ) 10. Lime tank area 1 11. Plant Office j Anticipated to be in range , 1 to 5 mg/m-3 PCB concns. OS* 013986 12. Analytical special Pdta. Lab. ) HARTOLDMON0012177 - 13 - MANUFACTURING: (continued Aroclor Bulk Deliveries Bulk Off-loading Procedure now In the hands of Marketing ar.d Distribution Departments. Used Drum Disposal Discussions held with drum reconditioning company to evaluate setting up of official used Aroclor drum disposal service for Aroclor users. A visit is planned to the cleaning/ reconditioning plant to inspect their effluent treatment and incineration facilities and monitor trials to be sure that the operation will not result in PCS pollution emissions. /jk W. B. PAPAGEORGE OSW 013987 HARTOLDMON0012178