PROJECT MANUAL
Central Engineering Department
CEA 1668 BIPHENYL & AROCLOR
JAPAN YQKKAICHI MANUAL NO.____/ CONFIDENTIAL
PROJECT MANUAL
Central Engineering Department
HONS 095267
PROJECT MANUAL CENTRAL ENGINEERING DEPARTMENT
MONSANTO COMPANY ST. LOUIS, MISSOURI
PROCESS DESIGN PACKAGE FOR NEW 5.5M LBS/YEAR BIPHENYL AND 10M LBS/YEAR AROCLOR MANUFACTURING FACILITIES FOR MONSANTO MITSUBISHI KASEI (MMK) AT YOKKAICHI, JAPAN
CEA-1668
COPY NO
L
DATE
Compiled by: CED Personnel Reviewed by: A. J. Heinze, Project Manager Approved by: R. M. Kountz, Product Section Manager
r
Copy No.
1 2 3 4 5
DISTRIBUTION
Project Manager MMK Representative MMK Representative Organic Division Representative CED Central Files
CONFIDENTIAL INFORMATION
This document is the property of Monsanto Company and the recipient is responsible for its safekeeping anddispostion. It contains confidential information which must not be reproduced, revealed to unauthorized persons or sent outside the company without proper authorization.
MOMS 09526a
1 MQNS 095269
O J f C r SCOPC ftEPOKT
Page 10
3. Blow air into the blow tank for two hours before transferring to the still pot.
4. When blowing aroclors 1154 and 1160 adjust steam pressure to coil to hold temperature at 140C.
When blowing aroclors 1142 and 1148 steam should be off the coil to prevent air distilling these aroclors into the scrubber.
B. Control and Alarm System
1. Temperature of the batch is controlled by a steam pressure regulator to the aeration coils.
2. A float type level gauge is provided to show product level in the tank. This is covered in detail on instrument schematic drawing 1-9.
C. Emergency Shutdown
1. Shut off air blower.
2. Shut off steam to coil.
D. Scheduled Shutdown
1. Examine sparger to determine erosion or corrosion of inlet holes.
Section C Distillation
I. Still Pot, Cyclone, Still Heater, Still Condenser. Still Receiver A. Startup and normal Operation
1. Design Considerations:
a) Time cycle considerations:
Heat up Heat up and distill Add 1ime Heat up and distill Distill to Montar Draw off Montar
Total time
For 1142
1.9 hr. 22.0
0.5 22.0
3.5 1.5
51.4
For 1160
2.1 hr 25.0
0.5 25.0
4.0 1.5
58.1
MQNS 095368
Page 11
Actual Distilling Time
Distilling Rate
Capacity 2300#/hr.x8750 hrs.
x 44 x 90% 58.1 or 51.4
For 1142 44.0 hrs. 2300 lb/hr. 15.3m lb/yr.
For 1160 44.0 hrs. 2300 lb/hr 13.5M lb/yr
b) Heater design is based on an absorption rate of 400,000 Btu/hr. into the circulating mass to give a distillation rate of 2300 lb/hr. This rate al lows for initial batch heatup, heat up during con tinuous operation and for vaporization.
c) The still vapor condenser is designed for a heat loading of 400,000 Btu/hr. Calculated loading is:
Desuperheat Condense Cool
Total
37,000 Btu/hr.
230.000
"
122.000 "
389,000
This is based on distilling aroclor 1142 with an in let temperature ofQ210 C and condensate outlet temperature of 100 C.
d) Heat removal from the condenser is accomplished with water in a high volume circulating system. This will allow better control over condensate temperatures and should prevent fouling of the condenser.
e) Distillation rate is controlled by controlling the oil feed rate to the external heater.
2. Still Operation
a) Close bottom outlet valve on still. Leave ram jet valve open about one inch.
b) Align valves to charge from No. 1 or No. 2 Blow Tank.
The automatic level control valve and flow integrator
will pass 30 gallon/minute.
'
HONS 095369
Page 12
c) Start blow tank transfer pump and charrge 570 gallons into still pot. This is equal to 33" on the gauge in the still pot leaving 48" of freeboard for disengaging height. When still is at proper level shut off valve to still and trans fer pump.
d) Add 125 pounds of lime directly to the still. Close up still and still receiver.
e) Energize the steam ejector.
1. Close 4" valve to deadhead the jet.
2. Open steam valves to first and second stages.
3. vacuum should pull down steadily to about 4mm Hg. absolute and hold steady.
4. open water valve to the after condenser and adjust to point where no steam is escaping from the after condenser vent.
f) Align valves to still receiver from ejector and condenser.
g) Energize the still heater.
1. Leave the "auto-man" switch on FRC-311 in the "auto" position with set point at minimum flow for tempering the heater coils.
2. Check that heater damper is open.
3. Circulate oil until header is completely filled with fuel. Burners normally require a viscosity of 15-25 SSF at 200 F.
4. Light gas pilot.
5. Open steam valve and cross over valve to oil gun until both oil and steam lines to the burner are completely warm with steam.
MONS 095370
Page 13
6. Close cross over valve and adjust steam valve to proper pressure.
7. Open oil valve gradually and adjust to proper burner pressure.
8. After burner lights, open block valve in oil line wide, the FRC-311 will be the heat con trol. Adjust steam valve for clean, bright fire.
9. Adjust primary and secondary air for stability.
10. Steam pressure should run 15-25 lb. above oil pressure.
h) Energize the water circulating system to the condenser.
1. Align valves at the water circulating pump to put water in at the bottom of the condenser, out at the top and back to pump suction.
2. Adjust TIC-240 to allow water into pump suction.
3. Start pump. As soon as water is circulating properly set TIC-240 to temperature required. Expected temperature set points will be:
For
1242 1248 1254 1260
i) Align valves in still pump line to circulate through the furnace coil and back into the still.
j) Set vacuum-recorder to maintain 40 mm Hg. absolute pressure. Observe the schedule start of stills to insure that operating vacuum is reached before boiling temperature is reached. If this is not done properly, the overheated aroclor may flash and belch over crude material if the vacuum is lowered quickly.
MGNS 0953J1
Page 14
k) slowly increase the flow of fuel oil to the still heater by adjusting FRC-311. if the furnace has an efficiency of 70% then the increase should follow approximately the table established below.-
GPH
Btu Input
1 150.000 2 300.000
3 450.000 4 550.000 - Design Point 5 700.000
l) When the still first starts to flow, start the blow tank transfer pump and open the block valve in the line to the still. Record the reading on the input flow integrator, FQ-223. The level con trol will now maintain a level in the still de pendent on the amount of oil burned at the heater and the amount of condensate flowing into the still re ceiver. It may be possible to operate the transfer system with the transfer pump down but valves open to the blow tank.
m) When the still is under proper operating conditions the following data can be expected:
1. Temperature in Still Pot
Aroclor
1242 1248 1254 1260
o Degree C
200 215 230 250
2. Vacuum
40 mm Hg. Absolute
3. Flow Rate
2300 pounds/hour
4. Coil Temperature
Steady witg a difference of about 8C between
inlet and outlet temperature
5. Still Condenser
Foward flow temperature at 100C for 1242, 140C for
1260.
M0NS 0953 72
Page 15
6. Still Pump
Output pressure about 50 PSIG.
7. Oil Feed
About 5 gpm maximum rate.
n) when the still receiver is full align valves to pump to surge tank.
o) Start receiver transfer pump. The level control system will allow continuous pump-out without dead heading the pump.
p) When 5000 gallons of feed material has been dis tilled shut off feed valve to still and valve in condensate flow line to still receiver. This is measured on FQ-223. Shut off oil flow to heater.
q) Release vacuum and add 125 pounds of lime to the still pot.
r) Restart still system by opening valve to still receiver, opening valve in feed line to still and starting flow of oil to still heater.
s) Continue to distill into the still receiver until an additional 5000 gallons has been distilled. At this point shut off the still feed and begin still boil down.
t) Still boil down procedure:
1. Reduce circulation rate of still pump by closing outlet valve on pump. Regulate to a pump pressure 10-15 PSIG below the pump operating pressure.
2. Continue to boil down to one or all of the following endpoints:
a) Observe pump pressure. If it drops below 10 PSIG the distillation is finished.
b) Observe temperature spread between inlet
and outletQof coil. When this spread
reaches 35 C or more the distillation is
finished.
.
M0NS 095373
Page 16
c) Observe forward flow. When flow stops the distillation is finished.
. 3.
Shut down oil flow to heater, with vacuum still on close valve under bottom of still and open vent valve at pump. suck vacuum through pump and pump discharge pipe until line is clear. Shut down pump, close block valve at pump. Close vent valve at pump.
4. The ram valve should be open about 1" during the distillation. Now close to break the crust and open to allow air to suck into the still pot. Close immediately.
5. Release vacuum at still receiver,
u) To drop residue:
1. Turn water and steam on fume ejector.
2. Drop bottoms into open top drums using a thermometer or measuring stick to tell when the drums are 2/3 full.
3. When the draw-off is complete, close bottoms dropping valve to within 1" of being completely closed.
4. Shut off water and steam to fume ejector.
B. Control and Alarm System
1. still Pot
a) Covered in detail on instrument schematic drawing 1-10 which covers the following loops:
LRCA-229 PRC -231
Level control on the still Vacuum control on the still
b) Set level in still pot to alarm as follows:
High level - 60" from bottom bend line Low level - 12" from bottom bend line
c) If circulating pump shuts down, alarm will sound.
MQNS 095374
Page 17
2. Still Heater
a) Covered in detail on instrument schematic drawing 1-13 which covers the following loop:
PRC-311
Fuel oil control for heater
b) Set alarms as follows:
High coil outlet temperature Low inlet oil pressure
300c 100 PS1G
3. Water circulating System
a) Covered in detail in instrument schematic drawing 1-10 which covers the following loop:
TIC-240
Water temperature control to condensers
4. Still Receiver
a) Covered in detail on instrument schematic drawing 1-10 which covers the following loop:
LCA-236
Level control in still receiver
b) Set level in receiver to alarm as follows:
High level Low level
50" from bottom bend line 6" from bottom bend line
C. Emergency shutdown
1. Shut off feed to the still pot.
2. Shut off oil flow to the heater.
3. Release vacuum by readjusting the vacuum controller to 760 mm Hg. Absolute.
D. Scheduled Shutdown
1. check for corrosion in the heater, still pot and pump system.
MQNS 095375
Page 18
Section p Absorption
I. Absorbers, Surge Tanks, Polish Filter, Finished product Storage
A. Startup and Normal Operation
1. Design Considerations;
a) Absorbers
1. Based on experience in the Anniston ex perimental column. This is covered in reports for Job 370-322.
2. Flow rate - 2300 lb/hr. Viscosity - 40-45 SUS Height to diameter ratio - 725/l (3/1 minimum) Design mass flow - 1 GPM/Ft. of bed
3. vibrators should be installed on the ab sorbers to facilitate charging -and- to and to prevent channeling.
4. Porocel - Regular grade 20/60 is the charge material for the absorbers.
5. Absorbers must be charged with dry porocel before starting the distillation system. Charging should be made with vibrators operating. It is absolutely essential that the porocel be dry before treating of the aroclor begins. The bed may have to be heated with steam coil provided and blown with nitrogen to accomplish this.
6. Provide individual absorbers for each aroclor to prevent product contamination.
b) Surge Tank (Item 223)
1. A coil with agitator is provided for control of temperature to the absorber.
2. It is desirable toQhave the goods at a temperature of 100C when charged to the surge tank.
3. The main function of the tank is to control product inlet temperature to the absorbers.
MONS 095376
Page 19
c) Filter (Item 227)
1. This unit collects any porocel that passes through the support plate in the absorber.
2. Filter elements are replaceable fiberpaks.
2. Absorber Operation
1. Set controller on crude surge tank to regulate temperature to the proper value for viscosity control and start agitator. These temperatures are:
. Aroclor 1242
1248 1254 1260
70C
85 C 110C 135C
NOTE:
The temperature of the product stream from still condenser will determine whether water cooling is to be used or steam heating.
2. Align valves to proper absorber, from absorber through filter to finished product surge tank.
3. Set flow recorder to the desired flow rate. This should not be over 3*5 GPM.
4. Start flow into Item 223 from still receiver and when temperature is adjusted to proper figure start flow through system.
5. For initial operation it may be desirable to circulate back to the crude surge tank until lab tests show product is within the standard range.
6. When product stream is within proper specification start collecting product in finished product surge tank.
7. When finished product surge tank is 80% full align valves to proper storage tank.
8. Pump surge tank to storage.
MONS 095377
Page 20
B. Control and Alarm System
1. Crude Surge Tank
a) Covered in detail in instrument schematic drawing 1-11 which covers the following loops:
TIC-255 LIA-253
Temperature control system Level control crude surge tank
b) Set level in crude surge tank to alarm as follows:
High level Low level
75" from bottom bend line 12" from bottom bend line
2. Absorbers
a) Covered in detail in instrument schematic drawing 1-11 which covers the following loops:
FRC-256 TIC-258
Feed flow control to absorber Temperature control for the absorber
b) Set flow on FRC-256 at a figure to equal the forward flow from the still condenser. This can be judged by readings taken on FQ-223.
c) Set TIC-258 to maintain proper temperature into and out of the absorbers based on the product being treated.
3. Finished Product Surge Tank
a) Covered in detail in instrument schematic drawing 1-12 which covers the following loop:
LIA-261.1
Level control finished product surge tank
b) Set level in finished product surge tank to alarm as follows:
High level
75" from bottom bend line
C. Emergency Shutdown
1. Shut off feed to absorbers . 2 . Shut off feed to crude surge tank 3. Shut off water or steam.
MONS 095378
Page 21
D. Scheduled Shutdown
1. Check for corrosion in the surge tanks, ab sorbers and polishing filter.
Section E Blending
I. Blend Tank, Filter. Raw Material Storage A. Startup and Normal Operations
1. Design Considerations:
a) Blends required are as'follows:
Aroclor 1260 Aroclor 1254 Trichlorbenzene PPO
Interteen KA________
-
70% 30% 0.2%
Interteen PPQ
60%
40% 0.2%
NOTE: % by weight
b) To produce the interteens pump the desired amount of trichlorbenzene into the mix tank. Treat with Attapulgus Earth. Pump in the desired amount of aroclor, mix thoroughly and have analysis made for specific gravity, re fractive index, moisture and chlorides.
2. Blending Operation
a) Operation of the blending tank
1. Close valve under the blend tank.
2. Align valves from TCB storage to blend tank and pump to desired measurement.
3. Start agitator. Align valves to circulate, by passing the filter.
MONS 095379
Page 22
4. Add 10 pounds of Attapulgus Earth, cir culate and mix for two hours.
5. Realign valves to go through filter press and remove Attapulgus Earth.
6. Repeat Items (4) and (5). Shut off circulating pump.
7. Pump in the proper amount of Aroclor 1260 or 1254 on top of the TCB. When the measurement is 6" from the cut-off point turn off the agitator so an accurate measurement can be made. Shut off the charge valve at the desired measurement.
8. Agitate for two hours. Then take a control sample. Results desired are usually, specific gravity, refractive index, moisture and chlorides
9. Take a sample from the PPO drum (Glycidal phenyl Ether) to be used in the mix. Results desired are usually, specific gravity and chlorides.
10.
After receiving the laboratory report make any adjustments necessary with tCb or Aroclor 1254 or 1260. Blend again and resample. Repeat until the mix is within specification range.
TCB will lower specific gravity and refractive index.
1254 or 1260 will raise specific gravity and refractive index.
If moisture is high blow with dry air or nitrogen
11.
Add the exact amount of PPO to the batch mix by sucking it in through the suction side of the circulating pump.
12. Agitate for two hours. Take final sample for complete analysis.
13.
If electrical properties of the aroclors used are low it is not necessary to treat the entire batch, aroclor and TCB, with Attapulgus Earth. If electrical properties are high use the following procedure:
MOMS 095380
Page 23
a) Add 25 pounds of Attapulgus Earth to the batch.
b) Circulate and agitate the mix for four hours. Bypass the filter press. Take sample for analysis.
c) Make necessary adjustments with TCB or 1254 or 1260 as required.
d) Add specified quantity of PPO. Mix for two hours. (Circulate and agitate).
e) Realign valves to go through filter press and remove Attapulgus Earth. Circulate for one hour before taking final samples. Continue to circulate for two hours.
f) Blow filter with air or nitrogen and clean.
g) While press is being cleaned, add 25 pounds of Attapulgus Earth, and agitate. Cir culate through press for 30 minutes before drumming or loading tank cars. Blow filter press with air and clean.
B. Control and Alarm System
1. This is covered in detail on instrument schematic drawing 1-12 which covers the following loops:
TIC-301 LT-305 TIC-304
Temperature control, Level in blend tank Temperature control, storage tank
blend tank raw material
Controls and alarms are set up as follows:
a) Steam is controlled by means of a temperature
controller on the plate coil of the raw material tank.Set at 90C.
b) Steam is controlled by means of a temperature con troller on the plate coil of the blend tank. Set at 90 c.
MQNS 095381
Page 24 C. Emergency shutdown
1. Shut down agitator. 2. Shut down circulating pump. D. Scheduled Shutdown 1. Examine tanks and agitator for corrosion.
r
MOMS 095382
PROJECT SCOPE REPORT CEA 1668
BIPHENYL & AROCLOR MANUFACTURING FACILITIES
FOR MONSANTO MITSUBISHI KASEI (MMK)
YOKKAICHI, JAPAN
March I960 A. J. Heinze
MONS 095270
TABLE OF CONTENTS
1.1 Introduction 1.11 Project Objectives
1.2 Process Technology 1.21 Process Description 1.22 Yields and Raw Materials 1.23 Material Specifications 1.24 Major Basis for Flow Sheets 1.25 Packaging 1.26 Waste Streams 1.27 Personnel, property and Public Hazards
1.3 Manufacturing Facilities 1.31 Capacity 1.32 Description of Facilities 1.33 Major storage Facilities 1.34 Flexibility and Future Expansion
1.4 Service Requirements 1.41 Utilities 1.42 Services
1.5 Plans and Schedules 1.6 Reference Reports 1.7 Appendix
A. Process Flow Sheets B. Equipment List and Summary Sheets
%
MQNS 095271
Page 1.
1. 1 Introduction
This scope report describes the facilities required to manufacture biphenyl and Aroclor at the Yokkaichi, Japan plant of MMK. The biphenyl facilities will be similar to those installed and operating at Monsanto's Anniston, Alabama plant. The Aroclor facilities will be similar to those installed and operating at Monsanto's WGK plant at Sauget, Illinois, and at the Anniston plant.
1.11 Project Objectives
The object of this project is_to provide manufactur ing facilities to produce 5.5M lbs/year of biphenyl and Aroclor 1242^ 1248, 1254 and 1260 at an aggregate total rate of 10M lbs/year. This project will in clude an Aroclor blending system and warehouse, drum ming and storage facilities for finished goods.
1.2 Process Technology
1.21 Process Description
a) Biphenyl process:
Benzene is converted into biphenyl, higher polyphenyls, carbon and hydrogen by raising its temperature above 650C in a direct fired tubular furnace and holding the reac tion mass until a portion of the benzene has reacted. Acetone is added to the furnace feed and acts as a reaction promoter. The vapors from the furnace pass to a fractiona ting column where the unreacted benzene and by-product hydrogen are distilled overhead. The benzene is condensed and recycled to the furnace. The hydrogen is compressed and cooled to recover benzene for recycle. The compressed hydrogen is subsequently vented to the atmosphere.
The crude biphenyl from the bottom of the ben zene stripping column is fed to the refining column where product biphenyl is distilled overhead.
The ratio of biphenyl to higher polyphenyls is basically controlled by varying the benzene conversion per pass or the amount of biphenyl recycled to the furnace with the benzene.
MQNS 095272
Page 2.
The overall reaction which takes place in the pyrolysis furnace is as follows:
x'
|i
o/
710 c^ {/
\ /,--------
^ " Nv- + Higher
+H +C
Polyphenyls
2
Benzene
Biphenyl
Hydrogen Carbon
b) Aroclor process-
Aroclor is a trade name used to designate chlorination products of biphenyl, higher poly phenyls or a mixture of biphenyl and higher polyphenyls.
Biphenyl is chlorinated at 150C in the presence of ferric chloride catalyst to a specified specific gravity which is a measure of chloride content. Hydrogen chloride gas is liberated during this re action and can be recovered or absorbed in water and sewered.
The crude Aroclor is then air blown to remove the residual hydrogen chloride and transferred to a batch still. The crude Aroclor is then distilled under vacuum in a semi-continuous fashion in a direct take-over still. Heat input to the still is supplied by an external oil-fired heater.
The still residue contains lime, high boilers, tars, ferric chloride and Aroclor which is drummed and discarded or sold as Montar.
The distilled material is the finished Aroclor product and is further refined by treatment with porocel, filtered, then stored in a nitrogen
atmosphere.
1.22 Yields and Raw Materials
Benzene Acetone
Lbs/100 Lbs Biphenyl
115,4 1.2B
Biphenyl Ferric Chloride Chlorine Air
Lime Porocel
1242
61.02 0.03
90.3 2 22.56
0.50 0.15
Lbs/100 Lbs Aroclor
1248
55.02 0.03
103.23 28.67
0.50 0.15
1254
49.01 0.03
116.13 16.25 0.50 0.15
1260
43.00 0.03
129.03 30.97
0.50 0.15
MGNS 095273
Page 3.
Aroclor 1254 or 1260 Trichlorobenzene Glycidal Phenol Ether Attapulgus Earth
Lbs/100 Lbs Blend
60.00 40.00
0.21 0.05
1.23 Material Specifications
Raw material and product specifications as indicated below are appended.
Raw Material or Finished Product
Code No.
Benzene Acetone Ferric Chloride Chlorine Lime - CafOH), Attapulgus Earth Trichlorobenzene Glycidal Phenol Ether Biphenyl Aroclor 1242 Aroclor 1248 Aroclor 1254 Aroclor 1260 Inerteen 54201-KA Inerteen PPO
14700 82905 33500 82638 38800 19400 60200 36100 82601 82612 81102 82613 82614 82681 82649
: Basis for Flow Sheets
The Anniston biphenyl plant and the WGK and Anniston Aroclor plants will form the basis for the flow sheets and engineering flow diagrams generated for this project. The only modifications to design will be those needed to solve specific problems such as waste disposal at the Yokkaichi plant.
1.25 Packaging
The major liquid products from the plant (Aroclor 1242, 1248, 1254, and 1260 and inerteen) will be shipped in tank cars or tank trailers, or will be packaged in 55-gallon steel drums. No product flaking facilities are included in this project.
1.26 Waste Streams
During the production of biphenyl, small amounts (approx. 51 lbs/hr.) of hydrogen off-gas will be vented to the atmosphere. No liquid waste streams are
MOMS 095274
Page 4.
produced during normal operation. The residue (higher polyphenyls) from the biphenyl refining step is assumed to be drummed for disposal.
During Aroclor production, approximately 630 lbs/hr. (average rate) of a mixture of chlorine and hydrogen chloride gas is liberated from the chlorinator and aeration tanks. This gas mixture is scrubbed with water in a drowning jet and sewered. During the distillation operation, about 70 lbs/hr. (average rate) of Montar (higher polyphenyls) discharges from the still pot. It is assumed that this material is drummed for disposal. Solids disposal at the filter amounts to about 7 lbs/hr. of cake consisting of approximately 70% Aroclor product and 30% clay. During the Inerteen blending operation, about 25#/batch of attapulgus clay is discharged from the filter. It is assumed that these solid wastes will be drummed off prior to disposal.
1.27 personnel, property and Public Hazards
1.271 Process Hazards
Hydrogen and benzene are present above their auto ignition temperatures in the benzene pyrolysis furnace and transfer piping and therefore a leak will result in a fire. The furnace tubes and trans fer piping are constructed of high temperature al loy steel to minimize this danger.
The pyrolysis furnace will be of the multiple-burner type fired with fuel oil. Interlocks will be pro vided to shut off the oil flow to the burners in the event of high or low benzene feed rate, high furnace stack temperature and process outlet temperature, combustion air blower low pressure and low fuel oil pressure.
1.272 Fire Hazards
Storage and process vessels containing the following chemicals above their flash points indicated are po tential fire hazards:
Material
Flash Point, F
Acetone Benzene
4 12
Hydrogen gas leakage is a potential hazard because of its explosive properties and non-luminous characteris tic when ignited.
MONS 095275
1.273 Personnel Hazards
Page 5.
No special handling precautions are required for Porocel, lime or attapulgus clay.
Acetone
Breathing acetone vapors can result in a strong narcotic effect on severe exposure. Recommended maximum atmospheric vapor con centration is 1000 PPM by volume.
Benzene
Benzene is a toxic organic chemical and contact with liquid benzene and breathing of the vapors should be avoided. The maximum allowable concen tration of vapors in air is 100 PPM. Both acetone and benzene liquid will be stored and handled outside and under normal conditions vapor concen trations will be less than the maximum allowable.
Biphenyl
Biphenyl is a toxic organic chemical and breathing of biphenyl vapors should be avoided. The maximum allowable concentration of vapors in air is 1.5 PPM. Durigg processing biphenyl liquid is generally hot (100C or above) and can cause serious thermal burns
on contact with the skin. Therefore, skin contact with biphenyl must be avoided by the use of gloves and protective garments.
Chlorine Gas
Chlorine gas is a hazardous substance which is very dangerous to the eyes and lungs. Maximum allowable concentration of Cl, in air is 2 PPM. Concentrations in the order of 15 PPM will cause throat irritation. Canister gas maskes, Scott Air Paks or similar apparatus should be available in the area in case of abnormal chlorine concentrations.
Hydrogen Chloride Gas
HCl gas is a corrosive, poisonous substance and very dangerous to the eyes. The gas also has an irritating effect on the nose and throat, although the nature of the irritation is usually transient except in cases of prolonged exposure. Maximum allowable concentra tion of HCl gas in the air is 10 PPM.
MONS 095276
Page 6.
Ferric Chloride
This compound, which is a solid at room tempera ture, is not toxic but can be an eye irritant on contact. Normal precautions of wearing safe ty goggles when handling this material should be followed.
Trichlorobenzene
Trichlorobenzene is a colorless liquid which, on contact with vapors, is irritating to the eyes and respiratory system and can cause damage to the liver. Normal safety precautions should be followed when handling this material.
Aroclors
During processing^ Aroclors are at elevated temperatures (100 c or above) and can cause serious thermal burns on contact. Breathing of vapors from this material should be avoided. At elevated temperatures, the vapors are quite toxic.
1.3 Manufacturing Facilities
1.31
Capacity
a) Biphenyl production design capacity 5.5M lbs/year.
b) Aroclor production design capacity 10M lbs/year broken down as follows:
Aroclor
M lbs/year
Approx, hrs/year
1242 1248 1254 1260
5.70 1.06 2.46 0.78
3825
830 2110
705
c) Operating on-stream time: Approximately 85%.
1.32 Description of Facilities
1.321 Biphenyl Unit
The following major items of equipment will be installed:
a) Pyrolysis furnace - The pyrolysis furnace is a
direct fired, multiple-burner, box type tubular
heater for the vaporization and pyrolysis of
benzene.
The furnace will operate in conjunc
tion with external feed preheaters (heat ex
changers) to take advantage of the high level
heat in the reaction mass effluent from the ra
diant section of the furnace.
MQNS 095277
page 7.
b) Benzene stripping column - The benzene column is a vertical, cylindrical, valve type tray distillation column which functions to separate unreacted benzene from crude biphenyl from the pyrolysis furnace. The benzene, which is taken overhead in the column, is condensed and re cycled to the furnace. The benzene-free bi phenyl and higher polyphenyls from the bottom of the column are pumped to two new 3,000 gallon storage tanks. These tanks also serve as feed tanks for the biphenyl refining facilities.
c) Hydrogen compression facilities - The benzenesaturated hydrogen, which is formed during the furnace reaction, is compressed in a two-stage reciprocating compressor to 300 PSXG. The com pressed gas is cooled and the condensed benzene is recycled to the furnace.
d) Biphenyl refining facilities - The biphenyl refining column is a vertical, cylindrical tray-type column which functions to separate biphenyl from higher boiling polyphenyls. The biphenyl overhead product is sub-cooled and pumped to storage. This column operates in conjunction with an oil-fired reboiler furnace.
1.322 Aroclor Unit
The following major items of equipment will be installed.
a) Chlorinator system - The chlorinator is a 1400 gallon batch vessel used to convert biphenyl to crude Aroclor. The chlorinator operates in conjunction with an 800 gallon biphenyl mix tank and two 2000 gallon aeration tanks.
b) Aroclor distillation - The distillation facilities consist of a 1350 gallon still pot which is heated by an oil-fired still furnace.
c) Clay treatment - The crude Aroclor from the distillation unit is further refined by Porocel treating. The treating system consists of a 1250 gallon surge tank, four vertical adsorption vessels, a polishing filter and a 1250 gallon product receiver.
d) Aroclor blending - The Aroclor blending system consists of a 5000 gallon agitator blend tank and filter.
MONS 0952?a
Page 8.
1.33 Major storage Facilities
Storage facilities to be provided are as follows:
a) Benzene - one 15,000 gallon tank.
b) Acetone - one
800 gallon tank.
c) Crude Biphenyl - two 3,000 gallon tanks.
d) Refined Biphenyl - one 10,000 gallon tank.
e) Finished Aroclor Product - one 23,000 gallon, one 10,000 gallon and two 8,000 gallon tanks.
f) Trichlorobenzene - one 10,000 gallon tank.
g) Fuel oil - one 10,000 gallon tank.
1.34 Flexibility and Future Expansion
The operation of the biphenyl unit is based on producing minimum cost biphenyl when there is no outlet for higher polyphenyls. Additional biphenyl capacity is achievable if higher polyphenyls are de sired. Higher rates can be obtained at the follow ing conditions.
Design
Alternate Operations
Feed, lbs/hr. Outlet, C
9250 715
8440 740
8440 740
8440 740
8440 740
Biphenyl recycle,%
0.5
4frr9-0.5 -T-rfr 0.5 ^T&O.S 0.5
Conversion, %
8.5 12 13 14 15
Acetone, %
0.1
0.15
0.15
0.15
0.15
M lbs/yr. Biphenyl
5.5
6.4
6.9
7.3
7.7
M lbs/yr. Sawtgwa* C
0-63
0.99
1-15
/ 3/
No specific provisions for future expansion are included
in either the biphenyl or Aroclor units.
1.4 Service Requirements
1.41 Utilities
The approximate utility requirements are as follows:
Steam (170 PSIG), lbs/hr. Cooling Tower Water, GPM Fuel Oil, M Btu/hr. Potable Water, GPM Power, installed HP Air ( 75 PSIG) SCFM C02 (200 PSIG) lbs/day
Biphenvl
500 350 9.5
10 65 50 150
Aroclor
2300 100
0.75 205 118
25 -
Total
2900 450
10.25 215 183 75 150
It is assumed that all uti plant.
ies are available in the M0NS 095279
Page 9.
1.42 Services
This project includes a 50'x30' warehouse for drumming the Aroclor products and drum storage. It is assumed that no additional storeroom, shop or locker room facilities are needed for this project. 1.5 Plans and Schedules
The targeted completion date for the process design package is March 1, 1968.
1.6 Reference Reports a) "Standard Manufacturing Process for Biphenyl" Anniston Plant - December 1966 - B. 0. Severson. (A complete list of reports pertaining to the production of biphenyl is contained in appendix N of this reference) . b) "Standard Operating Instructions for Biphenyl Tubular Units" - April 1964 - B. 0. Severson.
c) "Standard Manufacturing Process for Aroclors" Anniston plant - September 1966 - M. J. Williams.
d) "Standard Operating Instructions for Aroclors" Anniston Plant - April 1966 - M. J. williams.
e) "Process Description for the Manufacture of Aroclors" - Department 246 - WGK Plant - October 1966 D. E. Harris.
f) "Process Description for the Manufacture of Pyranols and inerteens" - Department A246 - WGK Plant October 1966 - D. E. Harris.
g) "Standard Operating Instructions for Aroclors and Pyranols. Department 246 and A246 - WGK Plant" August 1966 - V. Brawley.
MQNS 095200
Monsanto
OffQ ANIC C MtMIC Alt OIVIBION
M*TMUl CODE
14700
MAT SHI AL
Benzene - Nitration Grade UtlMO OCPTl.
RAW MATERIAL SPECIFICATION
FffOOUC T IOM
[Anniston
OATS If FICTivi
20
7-20-66
Enjay Chemical Co.
APPROVALS
RCSCARCM
R. C. Moody /s/R. C. Moody 6/9/66 ffffOCUFtMlMT
Ne F. Mueller /s/N. F. Mueller 7/13/66 OUALlTr CONTROL fCA/ Ch*m/0
H. L. Phillips /s/H. L. Phillips 6/10/66 QNftAL OtlCfflFTION
0. E. Dolin /s/0. E. Dolin 6/9/66 CHlMICAL FORMULA
Colorless, clean liquid
C6H6
UffgMiaOK* >fftcs OF
CMnffACTKffMTtC unrestricted information
tAMPLC POP AhilOII
t
Mol. wc. 78.108
Typical Values
Appearance
Clear liquid with no clear free water or suspended matter
G-l
Acidity
No free acid
D-847
Acid wash test, Barrett
2 Max.
0-848
Color, ATKA
25 Max.
5 046
(B) Crystallizing Point
5.30"C. Min. wet basis 5.398C. Min. dry basis 5.42
D-852
Distilling Range 1007. over in range to include
1 *C. 80.1*C
D-850
Specific Gravity 60/608F 25/25'C
0.8820 to 0.8860 0.B740 to 0.8780
C-U
Copper Corrosion
Negative
D-849
Sulphur Compounds
Free of H2S and S02
D-853
Total Sulfur, ppm
2 Max.
1 D-90
Total Chlorine, ppm
---
1 093
Allphatlcs, ppm
3000
Toluene, ppm Thiophene, ppm The prefix "D" in method numbers indicates an ASTM method.
25 <50
MGNS 095281
'
(ft) Rsultn* An*ly*l, Alt olh*f* An*fytf by roui only.
MONSANTO CHEMICAL. COMPANY
AGRICULTURAL CHEMICALS OIVISION
PA* MATERIAL
Acetone
FOR USE IN
RAW MATERIAL
( SPECIFICATION
bATt tMICTiVK
ISSUE NO.
URAOE
Anhydrous
12/18/64
1
SUPPUERS
MATERIAL NO.
All other
Monsanto. Chocolate Bavou. Tennessee Eastman, and Carbide & Carbon
PRODUCTION (MantNanoger/ PROCUREMENT (ProeiremerU Manager) AUTHORISED (totality lantrol Lkreela*)
APPROVALS RESEARCH (Asst.-birector)
/s/ J. A. Steohens
QUALITY CONTROL (Chief Chemist)
/*/ CHR 12/18/64
GENERAL DESCRIPTION
A clear water white liquid
CHARACTERISTICS Appearance
LI MITS Clear, water white
UCTHOO CB-393
Water solubility
No turbidity when diluted with water
CB-393
Sp. Gr. (? 20/20' C. Dlst. range 9 760 min.
0.791-0.794
1.0* C. to include 56.1* C.
CB-405 CB-406
Non volatile matter
0.002 gm/100 ml max.
-407
Color Acidity aa acetic acid
5 max. APHA 0.0027. max.
CB-395 CB-408
Alkalinity aa NH^
0.0005% max,
CB-409
Permanganate test
KMNO^ color retention for 30 minutes minimum
CB-235
Moisture Foreign odor
0.57. max. None
CB-410 CB-394
Note: Chocolate Bayou and other suppliers test each shipment on
the above. Anniston normally mokes no tests.
,
mgns 095ia2
M <zsim
. ' ...
, ,?:
WPWWW 1 .
'tTw. Dalton
-
C. A. Pratte seesaw. pascaiPTiaw
233
iwfsn SUFNLICN McKesson It Robbins
amfaovM.1 ' MMARCM M. A. Terpstra
fCMolQUALITY CONTROL
ChmmtmO
W. J. Gresham
CHKHMOi. rOWWlH.*
1
Fe Cl,
ia61u$. 162.21
TBBWmWUP------------------------------- BAMWLS con analysis
. 11/15/62
1 X 8 oz. W.M. Bottle
umnii<i<
*.IWT
'* UNRESTRICTED INFORMATION
Appaaranca
. Aaaay
SeUatea
. Fetroue Salt*
Solubility:
10:10 of Water
10:10 of Formula 30 Alcohol
Black powder or Granules 97.0%, min. 0.05%, max. Trace, max.
Complete to slightly turbid, max. Complete to slightly turbid, max.
ISSUSO BY
J. P. Prader
MTHOD
J.F.Q. 16-A
22-570 120-570 S-570-1 112-B
HONS 095203
Monsanto ORGANIC CHEMICALS OIVIIION
MAT KRIAL COOC 626.38 PLANT
MAY Ell 1 AL Chlorine Gns USING OCPT1.
0
Ln
* -4
1 !
RAW MATERIAL SPECIFICATION
pi*rr*ue i ion
Anniston OATS EFFECTIVE
SUPPLIER
8-31-66
See below
APPROVALS
nEStMICH
'
R, G. Moody /s/R. G. Moody - 8/11/66 MM0CUMCM8NT
L. R. Stark /s/I.. R. Stark - 8/29/66 OUALITY CONTNOU (Chiel Chwnlit)
H. 1, Phillips /s/ll, l.._Jbm^a-^_&/15l66 fi, E. .PolIn /.s/0. E. Dolin - 8/10/66
4tNHAL DESCRIPTION
CHEMICAL FORMULA
Greenish yellow gas
UPV-HftCOC* SPLCSOV Sept. U, 1957
SAMPLE FOP ANA - vsi )GLC sampling container
LIMITS
C12 Mol. wt. 70.91
ISSUCO *V
1 J. A. Liddle - 5/16/66
Typical Values
METHOD
UNRESTRICTED INFORMATION
Material Supplled by Diamond Alkali Company
A3say (Vol. 7.) Residual Gases (Vol. Moisture, ppm Non-volatile Matter,
7.) ppm
99.4 Min 0.5 Max. 40 Max. 40 Max.
113 113
Material Supplied by Depts. 56, 57 (Anniston)
Assay (Vol. 7.) H2 (Vol. 7.)
C02 (Vol. 7.) CO (Vol. 7.) N2 (Vol. 7.) 02 (Vol. 7.)
85.5 - 93.5 1.5 - 2.5 (3 Max.) 0.5 - 1.0 Nil 3.0 - 8.0 1.2 - 3.0
113 113
113 113 113 113
(R) Rtvllnt
All
by rqu< nly.
HONS 095284
tosc^ie
OrtOANIC CHQMtCAU UIVUION
MATCRIAL CODi:
3SCoo
MAT TRIAL T-i^s r.vdrntG USIrtS bKf'T*.
RAW MATgniAL SP2CII;JCAYIO:3
Anniston
OATH Cf-PKCTtVC
7-20-06
27, 2(1
#UAi-UI"N
Alabaster Lime: Co.
l*MOUUCTIO.H
APF HOVAl.S nr.iCAncM
H. G. Moody //lt. G. Moody 6/9/66
noeuMi:i/^wT
II. L. Phillips /s/a. L. Phillips 6/10/00
H. F. Mueller /r-/II. F. Knoll cr 7/13/C6
QUALITY COtitnOV. fChlr.' C)i-.lrl>
0. E. flolin /a/0. E, Iiolin 6/8/66
KnRiiau DCftCitinnou
Chcmical roiiwQu*
Uhlt fine pnv.-tlcr
Co (Oil)2
UI'CMICOKP tpr.es Of-'
Jept--.VU.1MZ____
CHA.&crr.r.i.Tic
uiismiixctKp rTor-'VfTa;
IAMPU fOB AM/.LVJIb t? - 1 lb. cans
li..ev.ai Typical Analysis
Mol. wt. " 74.10
IS7IUCD L r
3J.A. Uddle - 5/18/06 METMOO
CnO (7.)
73.00
Mco (%)
1.20
S102 (7.)
0.36
AljOj (51)
0.60
Fo203 (7.) Ignition Moos (7.) Ca(0:i)2 (7. Calculated)
0.30 24.04 97.50^
Screen Analytic
Through 200 norli (7.) through 325 t-.ash (7.)
99.8 94.5
120
Baala of Specifications; Suppliers typical analysis of product (5/23/66) (1) Ca (011)2 * " 1007* * f:<7*) + S102 (7.) + A1203 (7,) + FCjOj (7.r]
M) Aiafr.l*. A/I arAarl Analyte^ fcy r*UHf nty.
HONS 095285
Monsenio OMC.ANK CHI MICALi DIVISION
MAT cr<( At. cot'.c
1 9400
MAT LM1 AL
Attapulrats Earth - RVM Grade
HAW MATERIAL
SPECIFICATION
I'KOOUC TICIII
Annicr.cn
041 r OfLCTiv
?7-L
SUPPl ILN
7-20-66
Minevutla & Chcuxicals Philipp Corn.
APPROVALS
ntr-L ARCH
* " --
R. C. Moody /s/R. G. Koody 6/9/66
i<hocu'<cmi.nt
H. I... FtiUlIp* /s/U. I... riiillipa 6/10/66
bcmI'hal i>r.:.ciMr'Tic/N
N. F. Mueller /s/tl. V. Kuellor 7/13/66
Quality coni viol fCMl Chfiali,:)
0. K. Iiolin /c/0, il. Dolin 6/8/66
CHEMICAL FORMULA
", M
Irjnire Uydio-.is MobjibsIuiii Alumirmo Silicate
ur'CHAcnr.*
04
^' , - C Ht tt ACT KIHKTIC
-
s amp l g 4 0fi analysis
1 lb. can
LIMITS
upstm-RTcmt) iw o?c: .vc ion
Screen Analysis
Through 1*00 Mesh (%)
95 Min,
Lost, on Ignit Ion (7. 9S0C)
15 Max.
Typical Analysis from Supplier (May 23, 1966)
S102 (7,)
67.5
Al.,0., CD
12.8
Fe?03 <%)
4.5
XgO (7.)
11.1
CaO (7.)
1.6
K?0 (%>
0.8
Na20 (S) TiO? (7.) Other (7.)
0.1 0.6 1.0
1 issuer) l*Y ll. A. Mddlc - 5/75/66
MITvtCO
(ft) ftovltno Analylt, At! othor* A,\r>lyraH by r*Qw*-W only.
MONS 095286
"Wyt"
-sk..
Monsanto
RAW MATERIAL SPECIFICATION
WWutfllft.---------------------
P. E. Helsler 0. C. Kamenko
tINIIML DSBCRIFTION
'*5-it ivpilL sees ft' So&oo
PLANT
'
OATS SFFSCTiyt
JUN 3 1965
AWeROVAL*
matcMUl
1
Trichlorobenzene
246
Hooker
R- V. Buckn#tlU_
QUALITY CODNTTRROOLLTfCIW*# Chtmlll)
W. J. firesham_______
CHEMICAL FORMULA
TCB
IUPIMIDII BRfC* OF
__________ 8-29-63
OAR AC Y SRIBTIC
AMFLS FOR AN AL YBli
? & 5 at aabsr battles
imukd v
A. B. flsftlT
UNRESTRICTED INFORMATION
Color
APHA 15, max.
(R) Condition
Clear
(R) Sp. Gr. @15.5/15.5?
1.460 - 1.477
Acidity (mg. KOH/g.)
0.014, max.
Moisture (HbO)
75 ppm., max.
(R) Refractive Index 925C Free Chlorides
1.5680 - 1.5715 0.10 ppm., max.
Crystallizing Point
10C, max.
Dielectric Strength 925C ,3.0 KV, _m__in_.
Distillation Range (ASTM D-850,Modified)
(corrected for Stem and Barometric Pressure)
First Drop
205C, min.
5J6 by volume
210~C, min.
50^ by volume
213C, min.
90?6 by volume
215C, min.
Corrosion Test, 6 hrs at
210C with bright aluminum
foil
Change in weight of A1
0.0*
Color
APHA 200, max.
Condition
Clear
Acidity (mg. KOtyg.)
0.014, max.
Free Chlorides
0.10 ppm., max.
Monsanto Stability Test
0.5 ppm., max.*
Hydrolysis Stability Test 0.5 ppm., max.
Fire Point
None to boiling point
Fixed Chlorine
58.5^, min.
10105 10105
10114 10109
10620 10125
10118 10107 11605 10108
10126
11503 12672 10123 10088
Every other car can be over 0.5 ppm but never over 1.0 ppm. Values over 0.5 ppm to be cleared in advance.
Certificate of Analysis required on the above properties - To be mailed to the Chief Chemist, V. O. Krummrich Plant the same day shipment is
M0NS 095287
Monsanto
OMSAMIC CHIMICAkl PIVIIION
RAW MATERIAL SPECIFICATION
MATERIAL COOt
36100
PLANT
Anniston
CATC EFFECTIVE
8-28-67
[NATCHIAL O^VC'^L PMkfiJOu Er ?*')
Phcnoxypropr> Oxld_________________
USING DEPTS.
28
Shell Chemical Co.
PRODUCTION
APPROVALS
H. L. Williams /a/ H. L. Williams
PROCUREMENT
L. R. Stark /s/ L. R. Stark
QUALITY CONTROL fCftl*# C/lMlll>
H, L. Phillips /a/ H. I.. Phllllpa______________ G. W. Miller /a/ G. W. Miller
SEMEPAL DESCRIPTION
CHEMICAL FORMULA
C9H102
-O-CH2 -CH-CJIj
SUPSRStDES SPECS OF
New
SAMPLE FOR ANALYSIS
1 x 16 oz. W.M. bottle
LIMITS
. WC. 1DU.1/ IMUtO Y
J. A. Llddle 8-14-67
UNCLASSIFIED INFORMATION
(R) Specific Gravity @ 20/20*0 (R) Total Chlorine (R) Inorganic (free) Chlorldea, ppm
Purity (baaed on Epoxide content
percent by weight) Color, APHA Impurity A (aa determined by
Anniston GLC method)
1.105 - 1.115 0.2Z Max. 40 Max. 98Z
30 Max. 0.05 Max.
052 014
Ceneral Information (from aupplier'a technical bulletin)
Bolling Point @ 760 mm Melting Point Flesh Point Refractive Index @ 20C
Viscosity <? 20"C <3 30 *C
245 *C 3.5*C 175*F 1.5314
7.05 CS 4.88 CS
HONS 095288
CJIN *
Monsanto Chemical Company
ORGANIC CHEMICALS DIVISION
FINISHED PRODUCT
SPECIFICATION
product (Trade nuntej
Biphenyl
.
PRODUCT (Uttnucol ntu.ig)
Biphenyl
CHEMICAL fOPMUL A
PRODUCT CODE
a?6.oi
METHOD tOLNTITT
ACTS COOL
TYPE
Technical
rvrs
Teehnicol
-pT7-
Iscued 5/5/61 Annloton Plent By W, W. Klewnr Revised co add K values 11-18*65
c12k10
SUPERSEDE* IPCCS or
____ W1S_____
WCCI'L JOB NO. SAMPLE FOR ANALYSIS
Chsrp.cf.cr In fieri Routine tcotn Appearance
Crystallizing Point, 'C Color, Gardner
Llnlto
White to pale yellow cryataio 68.7 Min. 6 Max.
154.20 Soles
Typical Volueo
White crystals 68.8
1.5
Ccnernl Tent (rfotcrnlncd only on reauent)
Biphenyl, X
Nopthclcnc, %
3 - Methylbiphcnyl, X
4 - Hethylblphenyl, X
Unknown, X
Distillation Ilnnge, *C 1st drop - Dry Point
Must Include 255*C
99.9 0.001 0.05 0.02
<0.03
This specification for internal use only MQNS 095289
VOUSMffO CHEMICAL COMPANY ORGANIC CHEMICALS DIVISION
. v/.G.K. and Anniston .- FINISHED PRODUCT >! SPECIFICATION
rnooucr cooe
81102 '
Ioep'CI^-K.XiK
I 27 Ann.
USE
Sales
JALtlS cooe
-
1040-260-04/11/16-03/09
Vncowcf
tvre
flrnclor 1248 Electrical Grade (pyranol 1498)
VftOOWCT (Chs~tlc+> AV<nJ
TYPE
_
Issued ^/lO/64 W. G^RTiuHFiStrFid 'By
Corrected 2-16-64
CHXMICAL rOHMULA
,'
' .-
. ` Mixture
. .
. ,` .
<
.
.
MOL Vi. UPCnSCDCS SPECS OP
P-12-60
'' . SAMPLE POR ANALYSIS
3 x 5 Pt. Amber Bottles
UNRESTRICTED INFORMATION _
Routine Tests
. Specification
Color, APHA
.
. Condition
Sp, Gr. @65/15-5C
Acidity (me- KOH/gm.)
Moisture
.
Refractive Index @25C
Inorganics (Free) Chlorides
four Point
Dielectric Constant
(1000 cycles @100C) Resistivity
' (500 VDC 100C 0.1" CAP)
as OHM-CM x 10"
Hydrolysis Stability Test
(as Chlorides)
'
Monsanto Stability Test
(as Chlorides)
Plstlllatlon Range '
. (ASTM D-20, Corrected)
10^ Distilled by Wt.
9C$ Distilled by Wt.
50, max. Clear 1.H05 - 1.415 0.010, max. 55 ppm., max. 1.6285 - 1.6505 0.05 ppm., max. 0C, max. 4.5 - 4.7'
500, min.
1.0 ppm., max.
0.5 PPm., max.
545C, min. 585C, max,
Ccporal Tests (made only on request)
Sulfates
"
Dielectric Strength @25C
Mire Point
,
Viscosity 354.4*0 (SOS) Corrosion Test
(C hrs. 5210*0 with bright
aluminum foil)
Cnangs in wt. of Al {%)
J
None 35 KV, min. None to boiling point
73 - 80
0.0
(over)
'
Method No'
WOK
Annist
10,084 14-44 10,084 g-1 10.114 14-49-1
10,087 14-42-; 10,620 14-55-; 10,125 14-54-1 T-2092 014 '
10.115 14-27-5 .11,608 14-36-5
11,607 14-35-5
T-2087 010 11,503 14-61-57 10,117 14-31-54
12,169 - - 11,605 043 10,123 14-23-54 10,036 it-t-52 10,126 14-55-57
MONS 095290
A. C. Color, A?HA A. C- Condition A. C. Acidity (-3. KOll/g.)
A. C. Inorganic (Free) Chlorides
60, max. Clear 0.010, max.
0.05 ppm., max.
0-Ur.RAL INFORMATION
Specific Heat C?25C Fixed Chlorine
0.27
*
47.5 - 48.5
10,084 14-44-54 10,084 G-l
10,087 14-42-54 10,118 010
MQNS 095291
Monsanto
WOfcHCC CMtUlCALS OtVlStON
ANNISTON AND KRUMMRICH FiNiSHEo product SPECIFICATION
0
M059CTION
-
P. E. Heister *U` W. E. Ault
PRODUCT
'
Aroclor 1260
Electrical Grade
h-ant Anniston paoY2owcT>4, c-ooAnn.
Krummrich O AY C CffCCTlVC
JA8LC1J10Co5CJt-
V/OK
joeri* Ann I V.'GK -
U: s
5/25/66 APPROVAL# ncscAnc h
1040-290-04/11/16 -03-09
W, D, Robinson
Quay.it y con T ROL fCA// Cheatit) (J . K. Dohn \v, J, Gresham
CHCulCAl FOAMWUA
% ivPiAUSci tPtct. op
2/7/62
c MAH ACT cms TIC
'
IAHkt rofl IMALriH
3x5 pt, Amber Bottles
LIMIT*
s/cD e v
J. P. Prader
MttMOO
UNRESTRICTED INFORMATION
WGK.
A n nis to n
(R) (R)
(R) (R) (R) (R) (R)
x (R)
J (R)
(R)
(R)
(R) (R) (R) (R) (R)
Color (APHA)
Condition
Spec ific Gravity @ 90. 1 5.5 *C.
Acidity (mg KOH/g,)
Moisture (HjO) (ppm)
Viscosity @ 210*F. (SUS)
Refractive Index @ 25'C.
Inorganic (Free) Chlorides
Pour Point (C)
Distillation Range
(ASTM D-20, Corrected)
10% Distilled by v/t.
50% Distilled by wt.
90% Distilled by wt.
Corrosion Test
(6 hrs. @ 210*C. with
bright aluminum foil)
Change in weight of A1 (()
A . C. Color (APHA)
A .C. Condition
A.C. Acidity (mg. KOH/g.)
A.C, Inorganic (Free)
Chlorides
'
150, max.
Clear
1.555 - 1.566
0.014, max.
35, max.
72 - 78
1.6455 - 1,6470
0, 05 ppm, max.
25-34
.
385 - 39S'C. 390 - 404"C. 400 - 420-C.
'
0.0 150, max. Clear 0.014, max.
' -
0. 05 ppm, max.
10084 10084 10114 10087 10620 10086 10125 10118 10115 10117
.
14-44-54 ................ ..
14-49-54 14-42-54 14-53-54 14- 4-52 14-34-54 14-48-57 14-47-54 14-31-54
10126
10084 10064 10087 : 10118
14-55-57
14-41-54 14-42-54 14-43-57
(Over)
O
MQNS 095292
UNRESTRICTED INFORMATION (Cont'd.)''
Characteristic:;_________________________________ Limits________________
. Method
(R)
(R)
(R)
Flash Point Fire Point Fixed Chlorine (%) Dielectric Strength @ 50*C. Resistivity
(500 VDC @ 100'C. 0. 1" gap as ohm-cm x 10'}
Dielectric Constant 1000 cycles, 100'C.
None
'
None
59.5 - 60.5
30 K.V., min.
500, min.
3,6 - 3.8
WGK______ Anniston
10123 10123 10088
14-28-54 14-28-54 14-13-54
11605 11607
14-35-57
11607
14-36-45
l
RESTRICTED INFORMATION
(R) Monsanto Stability Test (As Chlorides in ppm.)
GENERAL INFORMATION
(R) Evaporation Loss after 6 hrs. @ 100'C. (%)
(R) Stability test - after 30 days at 100*C, in glass scaled in air.
' 0. 7, max.
11503
0,2, max.
10116
No liberation of chlorine or chlorides
14-61-57
12-32-54 (
MQNS 095293
Monsanto
OftOANIC CHEMICALS DIVISION
NNISTONIAND KRUMMR1CH FINISHED PRODUCT SPECIFICATION
PMOOUCT IOH
P. E. Heislcr ALCS W. E. Ault
CNCAAL DCSCniPTION
PROOUC T
Aroclor PLANT
WGK, Ann. +oa l effective
1242, Electrical Gr ade
PRODUCT CODE
USE
81101 - 83612
ALES COOC
|jOBPT. 2-16 Sales
6/17/66
1040-240-04/11/16-03/09
Anrnov tu
RESEARCH
R. W. BuckneU OUALITY CONTROL (Chifl Chemltl)
W. J. Gresham
(J h! Uolill
CHEMICAL FORMULA
Also, known as Pyranol 1499
I27
mow wi. UPBRSS UKI SPCCS. OF
4-13- 62
CHARACTERISTIC
AMPLE FOR analyki*
3 x 5 pt. Amber Bottles
LIMIT
UNRESTRICTED INFORMATION
(R) <R)
(R)
R) (R)
IR) (R) 'R) iR)
(R)
IR)
(R) (R)
%
.
Color (APHA) Condition Sp, Gr, @ 25/15. 5'C .
Acidity (mg. KOH/g. ) Moisture (H2O) Refractive Index @25C. Inorganic (Free) Chlorides Pour Point Dielectric Constant
(1000 cycles @ 100'C. ) Resistivity
(500 VDC @ 100"C . 0. 1" Gap) As OHM-CM x 109
Hydrolysis Stability Test (As Chlorides)
Monsanto Stability Test (As Chlorides)
Distillation Range (ASTM D-20, Corrected) 10% Distilled by wt. 90% Distilled by wt.
Sulfates Dielectric Strength @ 25 c. Flash Point (*F) Fire Point Corrosion Test
(6 hrs. @ 210*C. with bright aluminum foil)
Change in wt. of AL % A.C, Color (APHA) A . C . Condition A.C, Acidity (mg. KOH/g.) A.C, Inorganic (Free)
Chlorides Vise. @ 100'F. (SUS)
40, max. Clear 1.381 - 1. 392 0. 030, max. 35 ppm . , max. 1.6240 - 1.6260 0.05 ppm, , max. -14*C, or Lower 4.70 - 4,90
500, min.
0,5 ppm, max.
0. 4 ppm . max.
325 *C, , min. 360"C. , max. None 35 KV, min. 338 - 392 None
0. 0 60, max, Clear 0.010, max. 0. 05 ppm., max.
82 - 92 (Over)
IMUUO V
J . P , Pradc r
METMQO
WGK
Annisl on
10084 10084 10114 10087 1062 0 10125 12741 10115 11608
14-44-54 G-l 14-49-54 14-42-54 14-53-54 14-34-54 014 14-47-54 14-36-54
11607
14-35-57
12672 11503 10117
010 14-61-57 14-31-54
12169 11605 10123
10123 10126
043 14-28-54 14-28-54 14-55-57
10084 10084 10087 12741
10086
14-44-54 G-1 14-42-54 014
14- 4-52
HONS 095294
Monsanto
NOANIC CHtMlt*tSD|VIJlON
FINISHED PRODUCT SPECIFICATION
HNOOUCTION
P. E. Heinler B AL11
W. E. Ault
er.NLNAL PCICNIHTlON
Also called Pyranol 1-4T6
PNOOUC T
Aroclor
1234
Electricai
i'roijuct coot
Grade
U K
JoEPT.
1 p)i6 - 3
WGK and Ann.
JUN 2 8 1S65
APPROVAL*
NirtC AMc H
81103 820.13
iali'.i cciue
. Saler,
io4c-?Oo-o4/Ji/iO-oVoo
R. V), Bucknell
QUAUITY CONTROL (Chlel Chev*l0
W. J. Gresham.
0. E.
chemical roMm>
Dolin
UPLN#COB Il'IiCl. or
4-13-62
C MAN AC T CNIITlC
AMPLE PON ANALVII*
3x5 pt. Amber Bottles
LIMIT*
UNRESTRICTED INFORMATION
(R) Color, APHA
50, max.
(R Condition
Clear
(r Sp. Gr. @65/15.5C (r) Acidity (mg. KOH/gm.)
1.495 - 1.505 0.010, max.
(r Moisture (Ha0)
35 ppm, max.
(r) Refractive Index @25C
1.6370 - 1.6390
(r) Inorganic (Free) Chlorides 0.05 ppm., max.
(r Pour Point
7 - 12C
(R) Dielectric Constant (1000 cycles @100C)
4.15 - 4.35
(R) Resistivity
500, min.
(500 VDC @100C 0.1" GAP)
as 0HM-CM x 109 (R) Hydrolysis Stability Test 1.0 ppm,, max.
(as Chlorides)
(R) Monsanto Stability Test
0.5 ppm., max.
(as Chlorides)
(R) Distillation Range
(ASTM D-20, Corrected)
10# Distilled by Wt.
366 - 378C
50# Distilled by Wt,
371 - 383 c
90# Distilled by Wt,
379 - 394C
Sulfates
None
Dielectric Strength @25C 35KY, min.
Flash Point
None
Fire Point
None
Vise. @210F (SUS)
44-48
Corrosion Test
(6 hrs @210C with bright
aluminum foil)
Change in wt. of A1 (#)
0.0
A. C. Color, APHA
60, max.
A. C, Condition A. C. Acidity (mg.KOH/g.)
Clear 0.010, max.
A. C. Inorganic (Free)
0.05 ppm., max.
Chlorides
M. D. Dealv
METHOD
WGK 10084 10084 10114 IOO87 106?0 10125 T-2092 10115 II608
11607
T-2087
11503
10117
Ann 17PT4-5J G-l 14-49-51 14-42-5' 14-53-51 14-34-5' 014 14-27-5' 14-36-5'
14-35-57
010
14-61-57
14-31-54
12169 11605
10123 10123 10086 10126
043 14-28-54 14-28-54 14-4-52
14-55-57
10084
10084 10087
10118
14-44-54 G-l
14-42-54 010
HONS 095293
(R) Routine Analysis, All others A nolr ted by request Only
Monsanto
OftOANtC CMEMICAI) OlVIltON
FINISHED PRODUCT SPECIFICATION
P>f(OOUCT10N
PROOuCT
Inerteen 54201-KA
eeoouer coot
Anniston
826.81
Seles
mirror--J
) 29
5-3-67
1050-210-16-009
APPROVAL!
KsckAhch
i--
"
" " TM
R. G. Moodv /a/ R. G. Moody 2/24/67 Al.ll
L. R. Stark /a/ L. R. Stark 5/1/67
W. E. Ault // W. E. Ault 4/27/67 tCHCPAL f>CRC*lTIOM
G. W. Miller /s/ G. W. Miller 2/21/67 CHMIC*L POPMULA
Mixture -
MOW WT. uesnacDM
69.9% Aroclor 1254 29.97* Trichlorobenzene
0.2% Phenoxypropene Oxide
or
Tantatlva 7-29-65________________ 3 x 5 Dt. Amber bottle CHAMAerCRtaTtC
J. A. Liddle 2/21/67 MTNOO
UNRESTRICTED INFORMATION
(R) Color, APHA (R) Condition (R) Specific Gravity 9 15.5/15.5'C (R) Acidity, Mg KOH/gm
(R) Inorganic Chloride, ppm (R) Vlecoalty 9 100F, SUS (R) Rcslatlvlty 0 100*C, ohm-cm
(R) Dielectric Strength 9 25*C, KV (R) Refractive Index 9 25"C (R) Power Factor 9 100*C, 1 KC, X
9 100*C, 60 cyclea, X (R) Distillation
1st Drop Belov 270`C 907. by vt. (R) Pour Point (R) Moisture (HjO) ppm
(R) Fire Point (R) Phenoxypropene Oxide, % (R) Corrosion Test - 6 hrs. 9 210'C
with bright aluminum foil change In weight of aluminum
(R) After Corrosion Test Color, APHA Condition Acidity, Mg KOH/gm Inorganic Chloride, ppm
50 Max. Clear 1.518 - 1.528 0.014 Max. 0.05 Max. 58-62 500 x 10* Min. 35 Min. 1.6153 - 1.6173 0.50 Max. 5.0 Max.
200"C Min. 35X Max. 379 - 394"C -30"C Max. 30 Max. None to Boiling 0.18 - 22 0.0*
200 Max. Clear 0.014 Max. 2.0 Max.
046 C-l 052 050 045 049 121 043 048 121
053 047 114 11865 (WGK) 136
046 G-l 050 014
(R) Routine Analysis. All others Analysed by request Only
MONS 095296
Monsanto
ORGANIC CHEMICALS OIVlSlON
/Imiislon & Krummricli
FINISHED PRODUCT
0 SPECIFICATION
PftOUC T ION
P. E. Heisler
5aCi
~
V/. E. Ault
IPROOUCT Transformer Inerteen PPO
PLANT WG IS.
HROOVLT coot
uc
/ocrr. J Z`i6
.. --
[ Anniston j`,A'V/7l/66*
81094 l`Wt> COOC
APPROVALS I RES1ARC N
M. E, Gibbs
.
82649
' SAL"ES
1050-2 00- 16 - 0 3/09
QUALITY CONTROL 7Chlel Chen,St)
V. J. G r e s h a m
O. E. Dolin
tI"U*L OCtg*'*>T,OH
CHCMIC At FOR-UL A
. Mixture - 60% ArocJor 1260: 40% Trichlorobenzene
Plus 0.20% Phenoxypropene Oxide
.
(Westinghousc Inert.een 7336-9)
*OL RT.
% luPtRlCOCS PC*. OP 6/23/65
*AI4*LC FOR ANALYSIS
3x5 pt. Amber Bottles
UCO p y
J. P. Prader
Ch*R A tmisiic UNRESTRICTED INFORMATION
LIMITS
. MCTMOO
J
'o
(R) Color (K) Condition (K) Sp. Cr. @ 15.5/15.5"C.
APHA 150, max. Clear 1.560 - 1. 568
(R) Acidity (mg. KOH/g.)
0. 0]4, max.
00 Moisture (HjO)
30 ppm, max.
(10 Refractive Index @ 25 *C.
1.6137 - 1.6147
'
(R) Inorganic (Free) Chlorides 00 Dielectric Strength @ 25*C, 00 Resistivity @ 100"C.
500 VDC and 0. 1 " gap
0.10 ppm., max. 35 KV, min.
100 yt 10 ohrn/cm, min.
00 Viscosity @ 100"F. 00 Pour Point . 00 Distillation Range:
52 - 56 S.US -32*C., max.
(ASTM D-20, Corrected)
First Drop
200C., min.
Below 2?0*C., by wt,
40%, max,
90% by wt, .
395 - 415 C.
00 Corrosion Test, 6 hrs,
@ 210*C. with bright
Aluminum Foil
00 Change in weight of A1 .
0.0%.
AC Color
APHA 200, max.
AC Condition
Clear
AC Acidity (mg. KOH/g. ) 0.014, max.
.
AC Inorganic (Free) Chlorides
Z. 0 ppm, max.
oo Phenoxypropene Oxide (R) f ire Point O'-: Dielectric Constant
..
0.18 - 0.22%
None to Boiling Point
3.7 - 4.0 ;
...
'
1000 cycles, 100*0.
ixed Chlorine
59.1%, min.
Arc Formed Combustible Gases 1.0%, max,
Electrical S^a-hiNty 'aged 96 hrs
100'C, covered jar, 15% air)
Decrease in Resisri* ify RESTRICTED information
10%, max.
MONS
10, 084 10,081 10,114 10,087 10,620 10, 125 10, 118 11,605 11,607
10, 0S6 10,115 10, 117
10, 126
10. OS4 10, 084 10, 087 10, US
11,86 510, 123' 10,603
10, OS 8 10,711 10, 121
095297
(R) Power Factor @ 60 cycles
- . and 100*0. `
(fij A'ul'.., , \ . '
. , , , ,
5. 0%, max. (over)
11,603
general information
Dielectric Constant 1000 cycles, 25*C.
Analysis of each 10 ml. fraction of a fractional distillation Chlorine/Hydrogen Ratio Arc Formed Combustible Gases
d! 0 - 4^3
min. 1.5%, max.
MQNS 095298
Monsanto
General Offices - St .
O' March l.o, 1Q68
Project Lose Prevention Report 63-13 CPA 1663
TO A . J . Helnse !i. S. Yates
R. E. Horn nl
Y. Terajiraa SMT Iroject Kile S&PP Location File
COPIES TO THOSE PRESENT
It. J. Green A. J. Heinze W. B. Howard Ft. M. Kounta R. S. Yates
DATE AND PLACE OF MEETING
Trial-'burl.
"
March 14 and 11, I960. Crcve Coeur.
CKA 166C
Biphenyl and Aroclor, NtiK Plane, YaKkcchi, Japan.
Thio project is for design of a plant to make jlil ppy biphenyl
and 10M ppy Aroclors. The process design package is being
developed by CED; mechanical design, purchasing, and construction
will be handled by KMX. Currently it is planned to build the
Aroclors unit first and to build the biphenyl plant some 18
months later. The capital for the total croject is aoproxlmatelv
$1.7M.
"'
PERSONNEL
1, Access to Benzene Distillation Structure
The present
plan la to provide access to the benzene distillation
structure's two levels by means of a single ladder to each
level. These are not normally classed as operating levels.
It was recommended that the project manager check this
planning with Mr. George Gorbell. The same recommendation
also applies to the access to the platform for the biphenyl
distillation area.
2. Personnel Protection at Furnace Preheater and Retention Tank
it is recommended that personnel protection, probably railing, be installed at both ends of the furnace preheater and also
at the retention tank.
MQNS 095299
2
PROCESS
1. Control House Location
The plant layout drawing was
actually a sfcuay'"clrawins rather than a final layout dceigr..
However, It is recommended that, on even the study drawing,
the control house not be shown enclosed in a U formed by
operating units and tank storage.
2. Protection of Oil-Fired Pyrolysis Furnace
The pyrolysis
furnace will be protected in the same manner as vri.ll be that
planned for the Newport biphenyl project.
3. Inert-Gas Purge
Carbon dioxide will be provided at the
unit". It "is recommended that a provision be made in the
operating procedure for inert-gas purge of equipment, in
cluding the fractionating column, before start-up in order
to avoid a benzene-air interface.
A. Overpressure Protection of Fuel Oil Pumps
It was agreed
thaTPVC 10 d will" be' moved to just downstream of the fuel
oil pumps (positive displacement) to protect the pump as
well as the other equipment protected by the PVC.
5. Protection on Chlorlnator
The chlorination of biphenyl
is highly exothermic. B'ual alarms will be provided by two
TRA'c on the chlorlnator.
6. Protection Against Chlorine-Hydrocarbons Explosion
The
literature oh the process indicates that biphenyl car, burn
in chlorine. The flash point of biphenyl in chlorine is
not known at present. It is recommended that the flash
point of biphenyl be determined in chlorine in order to
determine v.'hether protection is needed to prevent the
addition of chlorine to the chlorlnator In the absence of
feri'ic chloride catalyst .
7. Aroclor Furnace Controls
It is recommended that the
Aroclor furnace controls (for oil firing) be checked with
Mr. George Ostroot.
8. Temperature Alarm on Process Stream Out of Aroclor Furnace It was agreed that a temperature alarm needs to oe installed in the discharge line from the furnace. It appeared that this alarm can be added to the temperature recorder already provided .
FIRE PROTECTION
The following fire protection recommenda
tions are the same ns those made for Biphenyl and Aroclor
plants in the United States:
MONS 095300
3
1. Provide automatic water spray protection throughout the Benzene Stripping Column structure and over the equip ment containing benzene in the Benzene Recovery Area. These systems should he hydraulically designed for a density of O.35 gpm per sq. ft.
2. Connect the proposed automatic water spray systems to the existing water supplies arid provided post indicator type control valve located 1)0 ft. from the area being protected.
3. Provide sufficient two-way hydrants to allow available hose streams at any point in the area where fire may occur. Extend the existing mains to supply water to the proposed hydrants.
1). FI reproof the skirt of Benzene Column ,yl-lll for a tviohour fire rating.
5. Provide a dike around Benzene Tank ,71-101 and Acetone Tank ;'/l-103 with a capacity equal to the larger tank.
6. Provide an ordinary hazard, dry pipe, automatic sprinkler system in the Warehouse and Drumming Building.
It is understood that drumming of Aroclors in metal drums and storage of Aroclors in metal drums on wood pallets (3 high) will be done in this building. The principal reason for automatic sprinklers is to protect against a fire in the wood pallets that could expose the drummed Aroclors.
IX1SS EXPOSURE
The probable maximum loss was estimated to
occur from tne explosion of the biphenyl chlorinator. The cost
for replacement of the chlorinator. and repair of auxiliary
equipment was estimated to be $20M. The downtime for replace
ment was estimated to be one month. On this basis the business
interruption loco would be approximately $100K.
It is noted that this will also be the probable maximum loss after the biphenyl unit goes into operation. That is, the probable maximum loss for any reasonably foreseeable Incident in the biphenyl unit will be less than the losses outlined
Just above.
BOSS PRCTKNTIOM REVIEVJ BY PLANT
The S&PP Brancli of CED does
not plan a complete review of cTesign prints for safety provisions.
S&PP requests plant personnel, including plant safety personnel,
to follow the development of design prints and to check th
progress of construction with particular emphasis on personnel
safety and loss prevention.
MONS Q95301
-4-
LOSS FREVRHTIO?! 0UID3
Attached to A. J. Heinzs and R. S.
'V"c'i:os' copy or this report is a copy of Form G-1A25, Loss
Prevention Review Guide, which can be used as a safety check
list for this project.
SAFETY HAMPER
R. J. Green will be Safety Manager for this
project. Please contact him for any subsequent safety meetings
that are needed.
bjr Attachment
R. J. Green
La) .
H
W. B. Howard
<K. /'*
HONS 095302
Central Engineering Department DOSS PREVENTION REVIEW GUIDES
September 15, 1365
Safety and Property Protection MONSANTO
HONS 093303
Reference: CED Procedure 602 Loss Prevention Review
Fora G 1425
Copies available from Office Supplies Dept
SECTION I - LOSS PREVENTION REVIEW C-UIOE
PERSONNEL SAFETY REVIEW
A. Project Site Location
1. What consideration has been given to exposure to or from the neighborhood from fire, explosion, noise, air ana stream pollution, and exposure to or from existing operations?
2. How many means of access are provided for the site to facilitate entrance by emergency vehicles?
3. What access roads to the site are exposed to railroad 'olockag
or highway congestion and other hazards? What are plans to minimize and control these hazards?
4. What sharp curves exist in access roads? Hov; much are curves banked? Has the need for barricades been considered?
D, Building and Structures
1. What standards are being followed in the design of stairways, platforms, ramps and fixed ladders?
2. Are sufficient general exit facilities and escape routes available? Will alternate means of escape from roofs be provided?
3- What lighting is provided?
4. How are doors and windows hung to avoid projecting into or blocking walkways and exits?
5. How is the structural steel grounded?
MOMS 095304
i-age 2 - Personnel Safety Review
C. Operating Areas 1. How are equipment, steam, water, air and electric outlets arranged to keep aisles and operating floor areas clear of hoses and cables?
2. What consideration was given to ventilation of hazardous fumes, vapors, dust and excessive heat?
3. What space is provided for the temporary storage of raw materials at process points, and temporary space for finished products?
4, Where is laminated safety glass used for windows of control rooms exposed to potential explosion hazards? What alternate escape routes to safe locations are provided
5- What arrangements are planned for pressure relief venting of area, if applicable?
6. How much clearance and what platforms are provided arour.d equipment for conducting maintenance operations safely?
7. How are nozzles and manholes sized ar.d located with con sideration for safe clean out, maintenance operations ar.d emergency removal of people from vessels?
S. How is protection provided against contact with hot surface
HONS 095305
page 3 Personnel Safety Review
9. What is the head clearance in walkway and working areas?
10. What consideration is being given to the proper guarding of exposed moving parts of power-driven equipment before operation start-up? What are the specifications for guards? Where are guards located? What type of guards are they?
11. What provision is made for interlocking covers and guards with operating mechanism?
12. Are manually-operated valves, switches ana other controls readily accessible to the operator from a safe location?
13. Where do vents discharge? What potential dangers of injury to personnel or damage to property do they present?
14. Where are hoists being installed? What type? What safety features are incorporated in the design?
15. How are elevator shaftway door interlocks and gate contacts designed? How will bi-parting doors be operated? What provision has been made for safety astragals?
16. How much material handling is to be done by mechanical means and how much by manual handling?
o 17 Where are Monsanto standard emergency showers and eye baths provided? MQNS 095306
Page 4 - Personnel Safety Review
18. What provision has been made for a safe storage and disper.clocation for flammable liquid drums?
19. What platforms and working areas are there where the operation
is of a nature which requires at least two exits for speedy
exit from the area in an emergency?
"
20. Where excessively noisy operations are concerned, w.nat measures are contemplated to reduce the noise level to a safe range?
21. How are supervisors' offices located relative to the operations? What provision is made for emergency exits?
22. What positive electrical power disconnects are being installed^)
for purposes of lockout?
^
Yard
1. How are roadways laid out with consideration for the safe movement of pedestrians, vehicles and emergency equipment?
2. Where railroad car pullers are to be installed, how are the control stations fully protected against broken cable whiplash? How will operator be protected from being caught between cable or rope and capstan or cable drum?
3. How are flammable liquid tank car and tank truck loading and unloading docks grounded?
MOMS 095307
.-age 5 - Personnel Safety Review
4. What means are provided on loading platforms for access oo work areas of tank cars and trucks?*
5. What handrail protection is being provided? 6. How is safe access provided to tops of storage tanks on -,:n
persons go for contents measurement and vent maintenance? 7. Is there sufficient head clearance and good visibility in
walking and working areas? 8. What yard lighting is provided?
L
MQNS 09530a
SECTION xl - LOSS PREVENTION REVIEW GUIDE "\ PROCESS SANITY REVIEW CHECK LIST
Soie:
Consider the check list in terms not only of steady state
operation, but also start-up, shut-down, and upsets of all
conceivable types.
*
A. Materials 1. What process materials are unstable or spontaneously i3,*.!table?
2. What data is available on amount and rate of heat svol.. during decomposition of any material in tne process?
3. What precautions are necessary for flar.tv.a'ole materials?
r~ 4. What flammable dust hazards exist?
5. Vfhat materials are highly toxic?
6. What has been done to assure that materials of construction are compatible with the chemical process materials that are involved?
7. What maintenance control is necessary to assure replacement of proper materials, e.g., to avoid excessive corrosion, to avoid producing hazardous compounds with reactants?
c
MONS 095309
Page 2 - Process Safety Review Check List
8. What changes have occurred in composition of raw materials and what resulting changes in process?
9- What is done to assure sufficient control of raw material identification and quality?
10. What hazards can be created by failure of supply of one or
more raw materials?
'
11. What assurance is there of adequate raw material supply?
12. What hazards can occur as a result of loss of gas for purging; blanketing, or inerting? How certain is gas supply?
13- What precautions need to be considered relative to stability of all materials in storage?
14. What fire extinguishing agents are compatible with process materials?
15- What fire emergency equipment and procedures are being provided?
3. Reactions 1. How are potentially hazardous reactions isolated?
2. What process variables could, or do, approach limiting conditions for hazard?
3. What unwanted hazardous reactions can be developed through unlikely flow or process conditions or through contamination? MONS 093310
4. What combustible mixtures can occur within equipment?
;:&ge 3 - Process Safety Review Cneck. Lis'*;
5. What precautions are taken for processes operating near ' or inside the flammable limits?
6. What are process margins of safety for all reactants and intermediates?
7. What reaction rate data, are available on the normal, or abnormally possible, reactions?
8. How much heat must be removed for normal, or abnormally possible, exothermic reactions?
9. How thoroughly is chemistry of the process known? (See NFPA "Manual of Hazardous Chemical Reactions")
10. What foreign materials can contaminate the process and create hazards?
11. What provision is made for rapid disposal of reactants if required by plant emergency?
12. What provisions are made for handling impending runaways and for short-stopping an existing runaway?
13- How fully is the chemistry of all desired and undesired reactions known?
14. What hazardous reactions could develop as a result of mechanical equipment (pump, agitator, etc.) failure?
V~/ 15. What hazardous process conditions can result from gradual or sudden blockage in equipment? MGNS 095311
age 4 - Process Safety Review Check List
16. What raw materials or process materials can be adversely affected by extrema weather conditions?
o
17. What process charges have beer, rr.ade since the previous process safety review?
. Equipment
1. In view of process changes since the last process safety review, how was adequate size of equipment assured?
2. Are any venting systems manifolded and, if so, what hazards can result?
3. What procedure is there for assuring adequate liquid level in liquid seals?
4. What is the potential for external fire which may create hazardous internal process conditions?
o
5. Is explosion suppression equipment needed co stop an explosion once started?
6. Where are flame arresters and detonation. arresters needed?
7. In confined areas, how is open fired equipment projected from spills.
8. What safety control is maintained over storage areas? MOWS 09531<!
o
.-'age 5 - Process Safety Review Check List
9. In the case of equipment made of glass or other fragile material, can a more durable material be used? If not, is the fragile material adequately protected to minimize breakage? What is the hazard resulting from breakage?
10. What emergency valves and switches cannot be reached readily?
11. When was pertinent equipment, especially process vessels, last checked for pressure rating?
12. What hazards are intmiuced by failure of agitators?
13- What plugging of lines can occur and what are the hazards?
14. What provisions are needed for complete drainage of equipment for safety in maintenance?
15. How was adequacy of ventilation determined?
16. What provisions have been made for dissipation of static electricity to avoid sparking?
IT. What requirements are there for concrete bulkheads, or barricades to isolate highly sensitive equipment and protect adjacent areas from disruption of operations?
D. Instrumentation Control 1. What hazards will develop if all types of motive power used in instrumentation should fall nearly simultaneously?
2. If all Instruments fail simultaneously, is the collective operation still fail-safe? MONS 095313
Page 6 - Process Safety Revievi Check List
3. What provision is made for process safety when ar. instrument, instrumental in process safety as well as in process control, ( is taken out of service for maintenance? When such an instrument goes through a dead time period for standardization or when, for some other reason, the instrument reading is not available?
4. What has been done to minimize response time lag in instruments directly or indirectly significant to process safety?
5. Has the process safety function of instrumentation been considered integrally with the process control function throughout plant design?
6. What are effects of extremes of atmospheric humidity and temperature instrumentation?
7. What gages, meters, recorders cannot be read easily? What modifications are being made to cope witn or solve this problem?
S. What is being done to verify that instrument packages are properly installed? Grounded? Proper design for the environment?
9. What procedures have been established to testing and proving instrument functions?
10. What periodic testing to check performance and potential malfunction is scheduled?
E. Operations 1. When was the written operating procedure last reviewed and revised?
MONS 0953X4
Page 7 - Process Safety Review Check List
) How are .new operating personnel trained on initial operation
2 and experienced operating personnel kept up to date, on plant
operating procedures, especially for start-up, shutdown, upsets and emergencies?
3- What plant revisions have been made since the last process safety review?
4. What special clean-up requirements are there before start-up
and how are these checked?
*
5. What emergency valves and switches cannot be reached readily? What procedures are there to cope with these situations?
6. What safety precautions are needed in loading liquids into, or withdrawing them from, tanks? Has possibility of static electricity creation been adequately taken care of?
7. What process hazards are introduced by routine maintenance procedures?
8. What evaluation has been made of the hazards of sewered materials during normal and abnormal operation?
9. How dependable are supplies of inerting gas and how easily car. supplies to individual units be interrupted?
10. What safety margins have been narrowed by revisions of design or construction in efforts to de-bottleneck operations,
reduce cost, increase capacity, or improve quality?
li. What provisions does the operating manual have for coverage O of start-up, shut-down, upsets, and emergencies?
HONS 095315
page 8 - Process Safety Review Check List
12. What economic evaluation has dictated the choice on process between a batch process and a continuous one?
t'. Malfunctions
.
1. What hazards are created by the less of each feed, and by simultaneous loss of two or more feeds?
2, What hazards result from loss of each utility, ar.d from simultaneous loss of two or more utilities?
3. What is the severest credible incident, l.e., the worst conceivable combination of reasonable malfunctions, which can occur?
4. What is the potential for spills and what hazards would result from them?
G. Location and Plot Plan
1. Has equipment been adequately spaced ar.d located to permit anticipated maintenance during operation without danger to the process?
2. In the event of the foreseeable types of spills, what dangers will there be to the community?
3. What hazards are there from materials dumped into sewers of neighboring areas?
4. What public liability risks from spray, fumes, mists,
noise, etc. exist, and how have they been controlled or minimized?
MQNS 095316
SECTION III.
LOSS PREVENTION REVIEW GUIDE
ELECTRICAL SAFETY REVIEW CHECK LIST
A. Design
I. How completely does the electrical system parallel the process?
a) What faults in one part of the plant will affect operation of other independent parts of the plant?
b) How are instruments for a plant protected from faults or other voltage disturbances?
2. How are interlocks ar.d shutdown devices made fail safe?
a) What is the need for each interlock and shutdown used?
b) How have interactions and complications been minimized?
c) How do we insure continued use of protective devices?
d) What requirements or standards were used for the hardware that has beer, selected?
3. How has the area NEC classification been established and hardware and techniques selected?
a) What process details effect the classification, group, and division?
b) What "UL approved" hardware is unavailable for this Job? Does this require testing.
c) Are any new techniques being applied on this job?
MONS 095317
4. Is the electrical system simple in schematic ana physical layout so that it can be operated ir. a straight forward manner? (This minimizes human error in switching for Isolation and load transfer.)
age 2 - Eiectricax Safety Review Check List
5. What electrical equipment can be taken out. of service for preventive maintenance without interrupting production? How
6. How is the electrical system instrumented so that equipment operation can be monitored? Will this eliminate down time due to equipment failures caused by unknown overloading?
7. What are the overload and short circuit protective devices?
a) Are they located in circuits for optimum isolation of
faults?
*
b) What is the interrupting capacity?
c) How are they coordinated?
d) VJhat instructions are furnished for field testing on installation and for later during life of equipment?
8. What bonding and grounding is provided?
a) How does it protect static buildup?
b) How does it provide lightning protection?
c) How does it provide for personnel protection from power system faults?
9. Check Lighting. a) Adequacy for safe normal operation? b) Adequacy for normal running maintenance? c) Adequacy for escape lighting during power failure?
10. How is tankage.grounding coordinated with cathodic protec tic MONS 095318
Page 3 - Electrical Safety Review Check List
11. What is the probability of accessability during mishaps of
power disconnects, starters, etc.?
'
12. What communication is provided to operate a complex safely? (Telephones, radios, signals, alarms, etc.)?
13. What are spacings and clearances for normal traffic mainte nance, and for fire fighting?
j4. What provisions are needed for interlocks and vihat is the schedule for checking operability of interlocks?
15. Where sequence controllers are used, is there an automatic check, together with alarms, at key steps after the
controller has called for a change, and is there a check together with alarms at key steps before the next sequence changes?
HONS 095319
SECTION IV - LOSS PREVENTION REVIEW GUIDE
n -B-O-I-L-E-R--A-M-D--M-A-C--H-IN-E-R--Y--C-H-E-C-K--L-IS--T
A. Boilers
1. Safety Valves
a) How are long and large vent lines supported?
b) What drain connections are provided?
c) Is first drum valve set to relieve boiler working pressur
d) Is the last drum valve set to pop at or below 103# of boiler working pressure.
2. Blow-off piping
Have you used steel piping of next higher gauge than required for boiler pressure, avoided sharp radius ells, and sloped all lines and drained all low points In the lines?
3. Feedwater Piping
Is'the bypass around feedwater regulator accessible from the operating level ar.d locaued where the drum level gage glass can be seen?
4. Steam Outlet Piping
a) Are there separate non-return and header stop valves where 2 or more boilers discharge into the same piping system?
b) Is there a visible free blow and drain lr. piping between non-return and header stop valves?
c) Are there condensate drain provisions for ail sections of piping?
d) Is there adequate piping expansion flexibility? How is piping supported?
5. Drum Water Level - Attended Operation
a) Are there both high and low water alarms?
b) Is there a low water cut-off of gas or oil burners? (If drop or loss of plane steam pressure does not jeopardize process safety) MONS 095320
Page 2 - boiler and Machinery Chech List
c) Is gage glass visible, from feedwater regulator bypass valve? d) Is remote drum level gage independent of drum level controls?
6. Drum Water Level - Unattended Operation al Where and how are high and low boiler water levels monitored? b) Are two Independent low water level switches Interlocked with gas or oil burner safety shut-off valves?
7. Gas burner control and piping - General
a) What type of plug cocks have been provided for manual shut-off service?
b) Is there in-line strainer in gas line ahead of all regulating and safety shut-off valves?
c) How do you provide for stable gas pressure regulation at all loads? This may require a small regulator in parallel, with the full-sized regulator for start-up or low fire service.
d) Is there a double safety shut-off and vent valve arrange^ Q ment? What type of reset is there for each valve?
e) What type of automatic fuel-air ratio control is used?
f) Is there separate pressure regulation of pilot gas?
g) Is safety control circuit DC, or 120v AC with the safety controls in the ungrounded circuit.
h) How do you insure positive, tamper-proof time period to provide minimum of 6 air changes in combustion chamber before light-off. Air flow rate during purge should be
at least 70$ of maximum capacity.
i) What controls are provided to prevent burner firing rate from being reduced below minimum stable flame.
J) What controls or interlocks are installed to prevent burner light-off when insufficient combustion air flow is present.
k) What interlock is there to assure low-fire burner light-off?
l) What method is provided for monitoring of main burner
_
flame for alarm and/or automatic burner shut-off in event, yj
flame failure?
MOWS 095321
Page 3 - Boiler and Machinery Check List
8. Additional gas burner controls and interlocks for uriatource operation: a) How is monitoring of .tain burner flame acoo.'.'.plished?
b) What other interlocks for safety shut-down of curr.er?
1) High gas pressure?
2) Low gas pressure?
3) Low combustion air flame?
4) Low boiler water (double switches}?
c) Is there flame scanner response line of 2-4 seconds?
a) Is there tamper-proof programmed light-off sequence to purge, light and prove pilot, light ar.d prove main flu: post purge?
e) no;, have you see up positioning fusi-air ratio control
f) Are you using a self-checking feature for flame sca.vne and flame scanner relay circuitry?
9. What provision is made ir. the oil burner controls and tipieach ,of the following items? a) oil line strainer
b) oil pressure control
c) heater for heavy oil
. d) single safety shut-off valve
e) start-up recirculating line for heavy oil
f) positive fuel-air ratio control
g) low oil pressure alarm or interlock
h) low oil temperature alarm or interlock for heavy oil
I) low atomizing steam pressure alarm or interlock
J) positive purge cycle and low fire start controls
k) interrupted pilot
10. Additional oil burner controls ar.d interlocks for unatter.c operation: a; Are interrupted ar.d proved pilot and monitoring of nai oil burner flame with interlock to close safety shut-o valve during flame failure provided? MUNS 095322
Page 4 - Boiler and Machinery Check Lise
b) What other interlocks for safety shut-down of burners are used for: 11 Low oil temperature - for heavy oils
2) Low oil pressure
3) Low combustion air flow
4) Low atomizing steam pressure
5) Low boiler water (double switches)
c) How do you provide a tar.per-proof programmed light-oi':'
sequence?
~
d) Do you use positioning fuel-air ratio controls?
II. Piping and Valves
1. Hov. ::erc piping systems analyzed for stresses and movement due to thermal expansion?
2. How are piping systems supported and guided?
3. How are piping systems provided for anti-freezing protection particularly cold 'water lines, instrument connections ar.a lines in dead-end service such as piping at standoy pumps?
4. What provisions for flushing out all piping during start-up?
5. Are any cast iron valves being installed in strain piping:
6. Are any non-rising stem valves being installed?
7. Are double block and bleed valves used on emergency inter- _ connections where possible cross-contamination is undesiratl
8. How are controllers and control valves reached for maintenar.
9. How are by-pass valves readily reached for operation?
10. Are any mechanical spray steam desuperheaters used?
11. Are all control valves reviewed for safe action in event of power or instrument air failure?
MGNS 095323
Page 5 - Boiler and Machinery Cr.eck List
^ 12. What provisions are made for testing and maintaining primary elements of alarm and interlock instrumentation without shutting down processes?
13- What provisions for draining and trapping steam piping are provided?
0. Pressure and Vacuum Relief
1. What provision is there for flame arresters on discharge of relief valves or rupture disks on pressurized vessels?
2. What provisions are there for removal, inspection, and replace ment of relief valves and rupture disks, and what scheduling procedure?
3- What need is there for emergency relief devices: 3reather vents, relief valves, rupture disks, and liquid sesls? What are the bases for sizing these?
^ 4. Where rupture disks are used to prevent explosion damage, how are they sized relative to vessel capacity and design?
5. Where rupture disks have delivery lines to or from the disks, what has been done to assure adequate line size relative to desired relieving dynamics? To prevent whipping of discharge end of line?
6. How are discharges from vents, relief valves, rupture disks, and flares located to avoid hazard to equipment ar.d personnel?
7. What equipment, operating under pressure, or capable of having internal pressures developed 'ey process malfunction, is not protected by relief devices ar.d why r.ot?
8. Kovi have you supported discharge piping independently of relief valves. Make piping as short as possible and with minimum changes in direction?
9. Did you provide drain connections in discharge piping of relief valves where condensate could collect?
MONS 095329
Page 6 - Boiler and Machinery Check List
10. Are relief valves provided on discharge side of positive
O
displacement pumps; between positive displacement compressor
and block valves; between back-pressure turbine exhaust flanges
and block valves?
11. Where rupture disks are in series with relief valves to prevent corrosion on valve or leakage of toxic material,
install rupture disk next to the vessel and monitor section of pipe between disk and relief valve with pressure gage
and pressure bleed-off line. Have any rupture disks been installed on discharge side of relief valve?
12. What provisions for keeping piping to relief valves and
vacuum breakers at proper temperature to prevent accumulation of solids from interfering with action of safety device are provided?
D. Machinery
1. Are adequate piping supports and flexibility provided to
keep forces on machinery due to thermal expansion of poping
within acceptable limits.
*
2. Vlhat is separation of critical and operating speeds?
3. Are check valves adequate and fast acting to prevent reverse flow and reverse rotation of pumps, compressors and drivers?
4. Are adequate service factors or. speed changing gears in shock service provided?
5. Are there full-flow filters in lube-oil systems serving aluminum bearings?
6. Are there provisions for draining and trapping steam turbine inlet and exhaust lines?
7. Are there separate visible-flow drain lines from all steam turbine drain points?
8. Are driven machines capable of withstanding tripping speed of turbine drivers?
MONS 095325
Page 7 - Boiler and Machinery Check List
9. Are non-lubricated construction or non-flammable synthetic lubricants used for air compressors with discharge pressures of greater than 75 psig to guard against explosion?'
10. What provisions are made for emergency lubrication of critical machinery during operation ana' during emergency shutdowns?
11. Arc provisions made for spare machines or critical spare parts for critical machines?
12. Are there provisions for operation or safe shut-down during power failures?
13. Are vibration switches on alarm or on interlock for cooling tower fans provided?
HOMS 095326
SECTION V - LOSS PREVENTION REVIEW GUIDE
FIRE PROTECTION CHECK LIST
1. If the building has enclosed walls and the construction or
occupancy has combustibles, what kind of automatic sprinklers
(wet*or dry pipe systems) are provided?
*
2. If the building has open walls and the construction or occunancy has combustibles, how much water spray protection (HAD'j or pilot r.ead heat actuating systems) been provided?
3. What existing hydrants serve the project? What additional ones are to be provided?
4. What fixed or portable monitor nozzles (on hydrants or separate) are provided for coverage for manufacturing facilities or storage facilities in open areas (not within open or closed wall buildings)
5. Hovi have the underground fire mains been extended or looped to supply additional sprinkler systems, hydrants and monitor
nozzles? Dead ends should be avoided. What sectional control valves have been provided?
6. How many small hose standpipes are provided inside of buildings?
7. What type, size, location and number of fire extinguishers are needed?
8. What flammable liquid storage tank protection has beer, provided? Foam? Dykes?
S. Where have total flooding or local-application carbon dioxide systems been provided?
10. 'Where is load bearing structural steel exposed to flammable liquids or combustible gases so that fireproofing is needed?
11. Kovi has adequate drainage been provided tc carry spilled flammable liquids ana water used for fire fighting away from buildings storage tanks, and process equipment?
12. What protection has been provided for dust hazards?
HONS 09532?
Page 2 - Fire Protection Check List
13- What is the capacity of fire water supplies? What is the ma.xii:
fire water demand?
'
14. How long will supplies meet this maximum demand?
15. What is the spacing of flammable liquid storage tanks?
16. What is the estimated probable maximum loss (PML)? Has Form #G1324 been completed?
17. What is the approximate "hold-up" of flammable liquids in the manufacturing equipment broken down by flash points?
18, What attention has been given to protection of process equiomer.c
from external fire?
'
19. Are liquid inventory tanks near or under the ground instead of elevated?
20. Is the area pad or flooring designed to conduct spill liquid
away from process equipment? What facilities are provided for drainage?
21. How have major storage tanks or vessels been located to minimire hazard to process equipment in the event of rupture or burning?
HONS 095328
o
l
PROCESS DESCRIPTION MMK BIPHENYL AND AROCLOR MANUFACTURING FACILITIES
PROJECT CEA-1668 BIPHENYL PLANT
TABLE OF CONTENTS
SECTION A SECTION B
Synopsis of Biphenyl Process
Pyrolysis Furnace - Benzene Column
1. Pyrolysis Furnace Facilities 2. Benzene Column Facilities 3. Initial Furnace Dry-Out 4. Initial Conditions of Startup 5. Initial Startup 6. Normal Operations 7. Control and Alarm System
Page No.
X
2
2
3 3
6 B XX 11
SECTION C
Hydrogen Compressor System
1. Compressor Facilities 2. Pre Startup and Check-Out 3. Compressor Purging 4. Initial Hydrogen Startup 5. Compressor System Instrumentation & Controls 6. Normal Operation
13
13 14 16 17 18 19
SECTION D
Biphenyl
Refining System
1. Biphenyl Refining Facilities 2. Initial Startup Check-Out 3. Initial Startup 4. Normal Operations 5. Normal shutdown
20
20 21 23 25 25
APPENDIX A APPENDIX B APPENDIX C
Selas Multi 595 - Refractory Drying Out Procedure Oil Pressure vs. Burner Firing Rate Chart Air Flow and Pressure vs. Firing Rate Chart
MONS 095329
Project Manual Section: 2.11
Date: By: Page:
March 18, 1968 A. J. Heinze 1
Section A Synopsis of Biphenyl Process
Benzene is converted into biphenyl, terphenyl, higher polyphenyls, tars, carbon and hydrogen by raising its temperature above 650*C
and holding the reaction mass until part of the benzene has re
acted. This reaction is carried out continuously in a
burner
tubuler-type
radiant furnace in which the benzene is passed
through 3*5" Incoloy 800 radiant tubes. Acetone is added to the
feed to allow the reaction to proceed at a faster rate.
Fresh benzene and recycled benzene is fed to the furnace via the convection section near the roof of the unit where the liquid feed is vaporized. The vapors from the furnace convection section are then raised in temperature by passing them thru the shell side of the furnace preheater. This step recovers waste heat from the hot product gases from the furnace radiant section by passing these gases thru the tube side of the preheater unit.
The preheated benzene vapors from the shell side outlet of the preheater are returned to the furnace where they are further heated in the radiant section to the reaction temperature. These hot product gases, after giving up some sensible heat by passing thru the tubes of the preheater, are then routed thru the tubes of the benzene stripper reboiler and then pass into the column.
In the stripping column, the unreacted benzene is distilled over head and the net crude biphenyl bottoms stream is pumped to storage. The column bottoms are pumped thru the shell side of the column reboiler in which heat is exchanged with the hot product gases in the tubes to generate sufficient stripping vapors in the bottom of the column to produce essentially benzene-free poly phenyls from the column.
The overhead benzene vapors are condensed in a vertical, watercooled condenser and the condensed benzene liquid then flows to a combination reflux and furnace feed tank. Make-up (fresh) benzene from storage is pumped into this tank on liquid level control. Part of the benzene from this tank is pumped back to the column as reflux on flow control. The furnace is also fed with fresh plus recycle benzene from this tank, also on flow control.
The hydrogen and other gases from the furnace operation pass con tinuously from the reflux/furnace feed tank to a vertical receiver equipped with a Brink demister element. saturated, mist-free gas then passes to a two-stage reciprocating compressor where the gas is compressed and subsequently cooled to recover benzene. This recovered liquid benzene is intermittently pumped back to the reflux/furnace feed tank. The compressed gas is vented to the atmosphere.
HONS 095330
Page 2
Section A - Con't
Crude biphenyl from storage is pumped on flow control to a 20-tray fractionating column where biphenyl is separated from terphenyls and higher polyphenyls. This column operates con tinuously in conjunction with an oil-fired reboiler furnace. The total biphenyl overhead stream is condensed in a vertical condenser and then flows to the column reflux receiver. Part of the biphenyl product from this receiver is pumped back to the column as reflux and the net biphenyl liquid from the re ceiver is pumped to storage. The net column bottoms stream (Santowax C) is pumped on level control from the column to a residue receiver prior to being drummed for disposal.
Section B Pyrolysis Furnace - Benzene Column
1. Pyrolysis Furnace Facilities
Following is a brief description of the major equipment items in the pyrolysis furnace area:
a) Pyrolysis furnace, Item 1-105: The pyrolysis furnace
is a box-type tubular furnace consisting of convection
and radiant sections and is equipped with
pressure
atomized type burners, arranged in 3 rows of
on each side
of the unit. The furnace is fired with a low-sulfur
distillate fuel oil and is supplied combustion air at the
burners by a forced draft fan (Item 1-109).
b) Furnace preheater. Item 1-108: The preheater is made up of two Brown Fintube multi-bare tube hairpin sections. Each 4" chrome-moly shell contains 7 - 20 ft. Hastelloy X bare tubes giving a total heat transfer area of 148 ft. The tubes are constructed with wrapped spiral spacers which function as baffles. Fluid routing at the pre heater is hot product gases parallel flow thru the tubes and convection section vapors series flow thru the shells.
c) Retention tank. Item 1-110: The retention tank, located at the outlet of the furnace radiant section, is a l'-6" O.D. by 5'-7" high Incoloy 800 vessel with a volume of approximately 66 gallons. This vessel provides additional residence time for the reaction gases from the furnace to attain the desired benzene conversion.
d) Combustion air blower. Item 1-109: The air blower is a centrifugal type unit designed for a volumetric capacity of 1500 CFM and a static head of 42" W.C. The blower is located near the furnace and supplies the combustion air requirements for the unit.
MQNS 095331
Page 3
Section B - Con't
2. Benzene Column Facilities
Following is a brief description of the major equipment items in the benzene column area:
a) Column rebojler, Item 1-110: The column reboiler is a 170 ft floating head unit mounted at grade adjacent to the column. This unit is provided to generate sufficient stripping vapors in the column bottom section to produce an essentially benzenefree crude biphenyl bottoms product.
b) Benzene stripping column. Item 1-111; The benzene column is 3'-3" diameter by 31'-0" high steel frac tionating column containing 12 valve-type trays. This column operates continuously in conjunction with the pyrolysis furnace system.
c) Column condenser. Item 1-114: The column condenser is a 1019 ft fixed tube sheet, vertical unit in which condensation and sub-cooling of benzene occurs inside the tubes. This condenser is mounted over the reflux/furnace feed tank for gravity drainage of liquid benzene into this vessel.
d) Column reflux and furnace feed tank. Item 1-115: The reflux/furnace feed tank is a 1250 gallon, vertical, steel vessel which is equipped with a water boot in the bottom head.
e) Crude biphenyl storage tanks. Items 1-118 and 1-119 The crude biphenyl storage tanks are 3,000 gallon, vertical, insulated, steel storage tanks. These tanks ore equipped with panel mounted, N- purged level in dicators and steam coils.
3. Initial Furnace Dry-Out Operation
The initial heating of the furnace must be gradual to assure slow drying of the furnace refractory. This dry-out procedure should be followed initially and also after the furnace has been down for extended periods of time.
a) prior to lighting off the furnace for the first time, it is assumed that the utility (and process) lines have been pressure tested, that all instrumentation has been checked out and that the furnace system is ready for operation. It is further assumed that the furnace box
r has been purged with steam and/or air and has been found negative to MSA or equivalent explosion meter be fore any attempt is made to light the first burner. The furnace box must be negative to an explosion meter when the lighting torch is first inserted. MQNS 095332
Page 4
Section B - Con't
The following procedure is recommended for initial furnace operation:
a) Admit steam to each burner throughout the entire
furnace. This is done by opening the 3/4" block
valves in the 90# steam line and opening the 3/8"
cock at the steam inlet to each burner.
(Steam
is admitted at this point to make sure that the
unlighted burner tips stay "cool" in the presence
of other lighted burners).
b) Start the air blower and set the auto/manual
switch on FIC-3 to manual to allow air to flow to the burners in the bottom row of the furnace. Regulate
the air manifold pressure to about
w.c. by throttling
FV-3 control valve.
c) Make certain that the 3/8" oil inlet cock to each burner is closed.
d) Set the auto/manual switch on FrICA-3.1 to manual.
e) Set the auto/manual switch on TRCA-2 to manual and regulate the output air signal so that when FIC-3 is switched to automatic, the air flow to the burners will be continued smoothly.
f) Switch FIC-3 to automatic control and use TRCA-2
for final adjustment of air flow to the bottom row of
burners at about
W.C. on the bottom row air manifold.
g) Start fuel oil pump 1-145 (or 1-146). with the F ICA3.1 control valve closed and all the individual bfirner oil inlet cocks closed, the oil flow will be diverted back to the storage tank (Item 1-144) via pressure regulator PCV-104.
h) With the FrICA-3.1 auto/manual switch on manual, set the pointer so that an output results which will just start to open the control valve.
(Note: To implement the startup which requires oil flow through the FrICA-3.1 control valve without allow ing flow to the burners, provide a 40-50 gallon barrel under the 1/2" drain line from the oil manifold).
With fuel oil now being pumped into the drain barrel,
adjust the pointer to attain about
PSIG on the
oil manifold. This is equivalent to about'
Btu/Hr. firing rate per burner for the
GPH oil
nozzle.
'
MONS 095333
Page 5
Section B - Con't
i) insert the acetylene torch adjusted for strong flame
in the lighting hole of one of the
burners in the
bottom row.
j) close the inlet steam cock of the burner selected and'slowly open the burner oil cock. After a burner is lighted, the oil cock must be fully open. This cock is not intended to be used for throttling.
(Note: For design operation of the furnace, the required oil flow to each burner will be equivalent
to about
Btu/Hr. which will require an oil
manifold pressure of about
PSIG. The combustion
air manifold pressure required for these conditions
is about
W.C. It is important to adjust the air
manifold pressure on lighting to a value to give an
oil-rich (air deficient) fuel mixture at the burner.
For lighting the burners at an oil manifold pressure of PSIG, the air manifold pressure should be
about
w.c.
k) If a burner does not light in about 10 seconds, the oil to that burner should be cut off and the furnace purged out. Burners which are operating will provide a partial purge in removing an explosive mixture. If there is any question regarding hazard in lighting after admitting unburned fuel, an MSA test should be made.
l) Burners should be held on the rich side until about 30% of the total burners are operating. The burners should be adjusted (pressure and oil/air ratio) so that the burner cup is not radiant but rather is genera ting a long flame which crawls up the furnace wall.
m) The temperature increase in the top of the radiant section should not exceed 50F per hour and should
be in general accord with the general Selas procedure
for drying-out refractory on furnace walls.
(a copy
of this procedure is attached as Appendix A).
n) It is suggested that non-adjacent burners be lighted first in the bottom row, adding burners later in the top row and in the middle row.
o) After 50 to 60% of the burners are in operation, switch the auto/manual selector on F ICA-3.1 to auto matic to maintain the setting selectid to result in
the desired burner operation.
MONS 095334
Page 6
Section B - Con't
p) The procedure for burner operation in the top zone of the unit is essentially the same as de scribed above for the bottom zone except that the air flow controller (FIC-5) is not indexed from a temperature controller.
In operation, this difference will require that the set point on FIC-5 be controlled manually during startup, and not pneumatically from a TRC.
q) With all the burners in the bottom row in operation the high select relay on F ICA-3.1 can now be set. Adjust the air supply to the high select relay in
the FrICA-3.1 output to a value which will provide
a minimum oil pressure of about
PSIG.
r) For proper operation, the stack damper should be adjusted to provide a draft of about 0.1" w.C. at the top of the radiant section at all times.
It is also important that a nominal draft be main tained at the arch which will represent the minimum draft point in the furnace structure.
When lighted burners are shut down to light new ones, immediately start the steam purge to the shut-off burner to avoid possible nozzle coking. As burners are required, a scattered pattern should be used in the lower rows progressing upward as required.
During the drying operation, periodic observations must be made and steps taken to prevent surface thermal shock or steaming within the refractories which may spall or crack them.
4. Initial Conditions of Startup
At this point, it is assumed that the furnace initial dry out phase has been completed, that the furnace and benzene column systems have been leak checked and pressure tested and are ready for initial startup.
The following items should now be checked prior to initial startup:
a) Furnace
Check to see that all burner cocks on each of the burners are closed.
MQNS 095335
Page 7
Section B - Con't
b) Utilities
Check the CO, system to assure 200 PSIG supply header pressure using PI-18, located on the furnace control wall. Also check to assure a minimum of 1000 lbs. (Approximately 8600 SCF)
of CC>2 available for purging.
Check that cooling tower water is flowing through tlie shell side of benzene condenser 1-114.
Make sure adequate instrument air pressure is available at the unit.
c) Fuel Oil
Check fuel oil tank 1-144 to assure an adequate supply of oil is available.
Check operability of fuel oil by-pass pressure
control valve PCV-104 by starting pump 1-145
or 1-146 with the fuel feed lines to the furnace
blocked off. When the set point of this valve has been reached, oil should pass through the
opening valve as observed in the sight glass just
downstream of the valve.
(This system was used
during initial furnace dry-out operations).
d) instrumentation
Set the furnace shutdown interlock switch to by pass location. This allows startup by taking the benzene high-low flow (FRCA-1), the fuel oil low pressure (PA-14) and combustion air low pressure (PA-11) functions temporarily out of the system.
See Section B (Page 4) for the settings on the burner control instruments.
' Set the system back pressure controller PRCA-26 to zero; this will open valve PV-26. Make sure PV-26 bypass valve (X96-2") is closed.
Set the fuel oil flow controllers to each zone
(F ICA-3.1 and F IC-5.1) to zero and close the block valves at the automatic valves.
Make sure all valves set approximately 25 meters to Pl-22, 23,
on pressure SCFH (max.) 32 and 35.
gauges are open CO, flow on the
and purge
M0NS 095336
Page 8
Section B - Con't
Set the benzene column overhead temperature controller TRCA-28 to control on he 12th tray of the column (TR 40-point 9) at 80 C to control reflux flow rate. Set column reflux controller FRC-27 on cascade and automatic control.
e) Raw Materials
Check the benzene storage tank (item 1-101) to make sure an adequate volume of on-specification benzene is in storage. Line up valves from benzene storage pump 1-102 to reflux/furnace feed tank.
Check the acetone storage and feed tank (1-103) to assure the tank is essentially full of on-specification acetone prior to startup.
f) Reflux/Furnace Feed Tank
Initially fill this tank with approximately 850 gallons of benzene from storage. Check operation of tank level controller LICA-30 during initial filling step. Vent tank via vent line with flame arrestor during filling.
Check the water boot interface level indicator LI-52 and manually drain water from the boot as required.
Initially align valves in the off-gas line from the tank
to vent hydrogen to the atmosphere.
(Make sure the
block valve in the gas line to benzene receiver 1-122
is closed) .
'
g) Stripping Column
Charge tank 1-118 (or 1-119) with about 300 gallons of liquid biphenyl.
Pump product biphenyl from the crude storage tanks into the sump of the stripping column. This can be done using pump 1-120 and the 1" rerun feed line to the column.
5. initial startup
a) Open the damper in the pyrolysis furnace stack and purge the fire box with air via blower 1-109. The purge volume should be about 5 times the volume of the box. Check the box with an explosion meter to make sure the box is safe to light the burners.
MOMS 09533 7
Page 9
Section B - Con't
b) Align valves to allow CO, to be purged through the furnace tubes at the rate of 125 SCFM to be observed on meter Fl-9. This is done to displace air from the furnace tubes, preheater and column system prior to feeding benzene.
c) With the furnace access doors closed, the furnace is now ready for initial operation. Align valves for the lighting of the 2nd and 4th burner on the bottom row on each side of the furnace. Manifold (oil and air) pressure readings and general operator experience are used during this initial lighting operation. Start oil pump 1-145 (or 1-146) and air blower 1-109 and light off the above mentioned burners. (Refer to Section 3 above for burner lighting procedure).
d) start pump 1-112 (or 1-113) and begin circulating biphenyl liquid through the shell side of the column reboiler.
e) The furnace box temperature, as observed on the multi point recorder TR-10 points 2 through 7, is now raised to about 450C, lighting more burners as required.
This temperature is attained over a 4-hour period.
f) After the furnace box temperature has reached 500c,
start CO, flowing through the furnace tubes and open
the manual valves (along the furnace control wall) in
the benzene feed line to the furnace. Start the reflux/
furnace feed pump 1-116 (or 1-117) and manually set 5
GPM benzene feed rate on flow controller FRCA-1.
additional burners to maintain 500c on TRCA-2.
Light
(Note: After 18 to 20 of the burners have been lighted, the oil flow controllers can be switched manual to automatic control).
from
g) Continue venting CO, to the atmosphere via the off gas line vent from the reflux/furnace feed tank and
slowly decrease the flow of C02 to the system as the
benzene flow rate is increased. During this adjust ment maintain temperature on TRCA-2 at 500C.
h) The benzene is now switched to automatic control and
raised to 8 GPM. Additional burners are lighted as required to maintain 500C temperature on TRCA-2.
MONS 095338
Page 10
Section B - Con't
i) Gradually increase the benzene flow rate to 15 GPM while maintaining the process vapors outlet tempera ture at 500c. When all the burners have been lighted,
heat input to the furnace is increased by increasing the oil and air flow rates to the burners.
j) When the benzene feed rate exceeds 12 HPM and the combustion air rate exceeds about 45,000 SCFH (total), the shutdown interlock switch can be changed from the by pass to control location.
k) Adjust the benzene flow rate to 21 GPM (design rate) and adjust the pressure at PI-22 initially to about 90 PSIG by throttling the PRCA-26 control valve. The rate of pressure increase should be about 10 PSX per hour.
l) Switch furnace temperature controller TRCA-2 to auto matic cascade control.
m) The unit will be initially operated under these condi tions for a period sufficient to test the unit and train the operators.
n) The furnace outlet (control) temperature is now raised to approximately 715C (8.5% net conversion) at a rate not
to exceed 100C per hour.
o) When the furnace outlet temperature reaches 650C bi
phenyl formation starts to occur. Start acetone pump 1-104 and feed acetone into the system at a of 9 lbs/hour (approx. 1.4 GPH).
charge rate
p) As biphenyl is formed and flows to the benzene column, the net bottoms liquid (crude biphenyl) volume will increase, check the column sump level (LRCA-31 and LI-31) and open the block valves at automatic valve LV-31 to allow column liquid level control.
q) As part of the benzene flowing into the furnace tubes is converted to biphenyl, make-up benzene will be pumped into the reflux/furnace feed tank on liquid level control,
LICA-30.
r) To minimize benzene losses in the off-gas from the reflux/furnace feed tank (now being vented to at mosphere) , the hydrogen compressor is now started up.
(See Section c for compressor operating procedures).
s) TO prevent vaporization of crude biphenyl in the column reboiler (1-110) adjust the 4" globe valve on the reboiler outlet line to give a pressure of 10 PSIG as read on PG 33.
HONS 095339
r*
Page 11
Section B - Con't
6. Normal Operations
This unit is completely automatic and only routine observations need be made to be sure that all controls are functioning as intended. These checks are as follows:
a) Observe the water level in the reflux/furnace feed tank by periodically draining water through the bottom nozzle. Check the water level interface indicator, LI-52, to be sure it is operating properly. It is located at the tank.
b) Observe the level controller (LICA-30) on the reflux/ furnace feed tank and be sure it is operating properly.
c) Observe the tubes in the furnace through the peepholes
to check for leaks and hot spots.
check the tempera
ture throughout the furnace.
d) Observe the furnace stack. If black smoke is noted, a tube is probably leaking and the unit should be shut
down.
e) Check the liquid level in the bottom of the benzene column (LRCA-31).
f) Check the temperature of vapors leaving the vaporizer section of the furnaceo(TR-10, point 15). If the vapor temperature is not 175C, light off the top row of
burners on each side and adjust the oil and air flow to the burners until this temperature is obtained.
g) Check for leaks throughout the system.
h) Adjust the outlet water from the condenser (1-114)
to maintain sufficient water pressure in the remainder
of the plant. 49C (TG-42).
The maximum exit water temperature is The feed water pressure should be about
41 PSIG.
i) Check the furnace inlet pressure (PRA-4) and the shell and tube side pressure drop at the preheater, 1-108. Also check PI-22.
7. Control and Alarm System
Alarms are provided on all critical control points. as follows:
They are
a) High and low liquid level alarms are provided on the reflux/furnace feed tank (LICA-30).
b) High and low flow alarms are provided on the benzene flow controller (FRCA-1) in the furnace feed line.
MUMS 095340
Page 12
Section B - Con't
c) The fuel oil and air to the furnace are provided with low pressure alarms (PA-14 and PA-11 respectively).
d) A high temperature alarm is provided on the furnace process outlet temperature controller TRCA-2.
e) Fuel oil feed to the furnace will alarm on low flow
rates to both zones of the furnace (F ICA-3.1 and
FrICA-5.1.
r
f) The pressure recorder (PRA-4) on the benzene feed to the furnace inlet is alarmed for high and low pressures.
g) pressure controller (PRCA-26) on the stripping column feed line is alarmed for high pressure.
h) High and low level alarms are on the benzene column level controller, LRCA-31. High level alarms are pro vided on the crude biphenyl storage tanks (LIA-57.1 and 57.2) .
i) All pumps sound an alarm when they kick off.
j) An automatic shutdown system is provided to initiate an emergency shutdown of benzene, fuel oil and com bustion air feeds for any of the following abnormal conditions!
Power Failure
In the event of a power failure, the following sequence of events will occur to initiate the inter lock circuit and shut the unit down.
(1)
The fuel oil solenoid valves will close,
stopping all air and oil feed to the
furnace burners.
(The oil pump and air
blower will also stop).
(2)
The air system to the benzene flow control valve will be vented to the air, thus closing the valve.
(3) The 110 volt power supply for the interlock circuit and instrument control panel originate at the same source. Therefore, a local power
( failure on the circuit will initiate an emer gency shutdown.
HONS 095341
Page 13
Section B - Con't
Low Fuel Oil Pressure
A pressure switch (PA-14) is installed to initiate a furnace shutdown if the fuel oil pressure drops to 100 PSIG.
Low Combustion Air Pressure
A pressure switch (PA-11) is installed in the air line from blower 1-109 to initiate a furnace shutdown if the air pressure drops to 15" W.C.
High and Low Benzene Flow
Abnormal high and low benzene flow rates will initiate an emergency interlock shutdown of the pyrolysis unit. The interlock system will be set for a normal range of 10 to 30 GPM of ben zene flow.
High Stack Temperatures
Excessive heat input causing high stack temperatures in the furnace will shut the system down (T1A-6). The setting for the interlock shutdown will initially be set for 1,000 F.
Section c Hydrogen compressor System
1. Compressor Facilities
Following is a brief description of the major equipment items in the benzene recovery (hydrogen compressor) area.
a) Benzene receiver, item 1-122: The benzene receiver is a 200 gallon, vertical steel vessel provided to serve both as an inlet knock-out drum and recovered benzene receiver. This tank is equipped with a stain less steel/glass fiber Brink mist eliminator to assure mist-free gas to the compressor inlet. This vessel operates intermittently with benzene return pump 1-123 on pump-out.
b) Hydrogen compressor, item 1-124: The hydrogen compressor is an Ingersoll-Rand 2-stage reciprocating type ESH unit driven by a 30 HP motor. The compressor runs at 600 RPM and discharges the rated benzenesaturated hydrogen flow of 70 ICFM at 300 psig.
MONS 095342
Page 14
Section C - Con't
The compressor is provided with cylinder forcefeed lubrication system with low oil pressure shutdown switch. The compressor cylinders are cooled with tempered water. The machine is also provided with manual inlet valve unloaders for capacity control.
c) compressor inter-and-aftercooler, items 1-125 and 1-127; The inter-and-aftercoolers are Brown Fintube double pipe fin tube units in which the gas is cooled (and benzene condenses) in the annulus and tower water flows inside the tube.
d) Compressor receivers, items 1-126 and 1-128: These receivers are both 125 gallon, vertical steel vessels which function as condensed (recovered) benzene re ceivers. These vessels are equipped with automatic level controllers (LCA-71 on 1st stage receiver and LCA-81 on 2nd stage receiver) and benzene is continu ously pressured back to the benzene receiver prior to transfer to the reflux/furnace feed tank.
2. Pre Startup and Check-Out
Prior to initial startup on hydrogen, it is assumed that the following activities have been accomplished:
Pre Air Test activities - Prior to making the initial air test, the compressor suction piping must be checked to make sure it is free of weld metal, slag, dirt and scale and that the suction line temporary filter (special fitting 511) is in place. Also it is advisable to brush the inside walls (and then flush) of receivers 1-122, 126 and 128 to remove dirt and loose scale. The suction and discharge piping must be "gas tested" and any
leaks detected and eliminated ! prior to admitting H2 into the
system.
Air test and mechanical check-out. The machine must initially be operated on air to check "run-out", alignment and proper lubrication. The following steps should be followed for the initial air test:
a) Insert a line blind on the 3" gas inLet nozzle on
side of the benzene receiver.
b) Remove the 10" hand hole cover on the top head of benzene receiver to serve as the air source.
r- c) Start the flow of cooling water to heat exchangers
1-125 and 1-127.
MONS 095343
Page 15
Section C - Con't
d) To operate the machine (initially) fully unloaded, adjust the handwheels of the four 1st stage unloaders and the two 2nd stage unloaders to the downward posi tion. The machine will now run fully unloaded.
e) Operate the cylinder jacket tempered water system and
adjust the water temperature to 40c. Start the water
circulating through the cylinder jackets.
at 40C.
Set TIC-114
f) Start the compressor and run fully unloaded for at
least one hour. Initial mechanical inspections are
made during this period.
g) Initially set back pressure controller PRCA-87 at 150 PSXQ. Close block valves around suction pressure control valve (PV-86) as this system will not be used for the air test.
h) After the 1-hour unloaded compressor run, fully load the machine by reversing the procedure outlined in step (d) above. The unit is now compressing atmospheric air (from 1-122) and discharging it to the atmosphere via pressure valve PV-87.
(Note: Moisture from the air will be condensed and collected in items 1-126 and 128 after the machine is loaded. Align block valves around the level con trol valves on the bottom piping from these drums such that this water will be blown back to 1-122. Check the level gauge on this vessel and periodically drain as required).
i) Run the compressor fully loaded at 150 PSIG for about 2 hours. At the end of this period, increase the setting of PRCA-87 to 300 PSIG. Run machine at 300 PSIG for approximately 4 hours.
j) After this 4-hour run, shut down the machine. Re place the 10" hand hole cover on the head of 1-122 and remove the temporary line filter (special fitting 511) .
k) During the air test, check the operability of the
frame oil system low pressure shutdown. Also, ad
just the cylinder lubricator system for 6-8 drops per
minute to the 1st stage cylinder and 3-4 drops per
minute to the 2nd stage cylinder.
.
MQNS 095344
Page 16
Section C - Con't
1) Refer to sections 2A-1 through 2A-19 of the I-R instruction booklet for mechanical checks that need to be made.
3, Compressor Purging
Prior to initial startup of the compressor with hydrogen,
the system must be purged with an inert gas (n ) to a safe oxygen level. Also, before a maintenance2Inspect ion
of the machine, the compressor system should be purged
with
prior to opening any part of the machine or
associated equipment. A N2 purge line is tied into the
compressor suction line (gas outlet line from 1-122) which
is to be used for inerting the system.
The following procedure can be used for N2 purging:
a) Install a line blind at the 3" gas inlet flange on 1-122.
b) Make sure all vessel drain valves are closed.
c) Open the 3/4" block valves in the N2 line and slowly pressure up the compressor system to about 30 PSIG.
(Note: Install a temporary pressure gauge on the 1/2" drain connection on 1-122 level gauge LG-64 to check the n2 pressure in this part of the system). Check this pressure at various points in the piping (PG-68, 73, 79 and 96).
d) Slowly depressure the system to about 1 PSIG via pressure valve PV-87.
e) Again repressure the system to 30 PSIG N? pressure and depressure to 1 PSIG (as above) for the second time.
f) Sample the gas mixture at the high pressure vent (1/2" valve between PV-87 and upstream block valve)
and analyze. When this analysis indicates 4% o2
or less, the system is safe to admit hydrogen.
(Note: During this purging step, be sure to bleed
off N2 from the drain valves at vessels 1-122,
126 and 128 for several minutes).
.
MONS 095345
Page 17
Section C - Con't
4. Initial Hydrogen Startup
The following procedure should be followed for initial start up on hydrogen.
a) Check that cooling tower water is flowing to ex changers 1-125 and 1-127.
b) Start tempered tower water flowing through the cylinder jackets and set TIC-114 at 40c.
c) Set PC-85 at 1.75 PSIG. Set PRCA-86 at 1 PSIG and PRCA-87 at 300 PSIG, all on automatic control.
d) Make sure valves and piping are aligned to blow recovered benzene back to 1-122.
e) Start the steam purge to the hydrogen vent line. Throttle the block valve just ahead of the steam orifice such that PG-84 reads about 9 PSIG. This corresponds to a steam rate of approximately 70 lbs/ hour.
f) Make sure the lubricator oil levels are adequate.
g) Fill the 1-122 receiver with benzene to a point that the demister drain leg is submerged.
h) Adjust the handwheels of the four 1st stage inlet valve unloaders and the two 2nd stage unloaders to the downward position (unloaded).
(Note: At this point it is assumed that the pyrolysis-benzene column system is in operation and that gas is being vented from the reflux/ furnace feed tank to the atmosphere via the 2" vent line containing the flame arrestor).
i) Open the 3" block valve in the gas line to item 1-122 and close the vent line block valve.
j) Start the compressor (unloaded). The machine will be up to speed in a few seconds.
k) After the machine is up to speed, fully load the unit by adjusting the handwheels of all six unload ing valves to the raised position.
l) The machine is now compressing hydrogen to 300 PSIG from a controlled inlet pressure of 1 PSIG and con densed benzene is accumulating in receivers 1-126 and 1-128. Take a complete set of temperature, pressure and level readings.
095346
Page 18
Section C - Con't
5. compressor System Instrumentation and Controls
Following is a description of the instrumentation, controls and automatic shutdown features on the compressor system:
a) Pressure Controllers
Suction pressure is controlled with pressure con trollers prca-86, located on the control room panel. The machine suction pressure is sensed at a point on the first stage suction line and the suction pressure (normally 1.0 PSXG) is controlled by re cycling 300 PSIG gas from the discharge line, taking the pressure drop across PV-86 control valve.
Discharge pressure is controlled with pressure con troller PRCA-87, also located on the control room panel. High pressure gas (300 PSIG) is expanded across PV-87 control valve and is vented to the atmosphere.
Overpressure can occur in the system caused by a compressor failure. Should the system pressure begin to rise, pressure controller PC-85 control valve will open and vent gas to the atmosphere.
b) Automatic Shutdown Devices
The following instruments are provided with alarms and cause the compressor to shut down:
Low suction pressure. High liquid level in benzene receiver 1-122. High liquid level in first stage receiver 1-126. Frame lubrication system low pressure.
c) Benzene receivers - liquid level controls
Automatic liquid level controllers are provided on
first and second stage receivers (LCA-71 and 81).
These controllers function to maintain a specified
level in these vessels by blowing recovered benzene back to item 1-122. High and low level alarms are
provided on these tanks to detect instrument
malfunction.
'
MONS 095347
Page 19
Section C - Con't
Liquid benzene is pumped from 1-122 intermittently back to the reflux/furnace feed tank via controller LC-63. Level switch LC-63.2 automatically starts pump 1-123 and when the level in 1-122 drops to the LC-63.3 position, the pump automatically stops. Low level alarmLA-63.4 is provided at the bottom nozzle of 1-122.
d) Gas high temperature alarms
Temperature switches (TAH-90 and TAH-91 respectively) are installed in the gas discharge lines from each stage which will activate the annunciator panel alarm should the exit gas temperature reach the preset value of 190c.
6. Normal operation
The operation of the compressor system is completely automatic and normally requires periodic monitoring as follows:
a) Check benzene level in items 1-122, 1-126 and 1-128 every 4 hours.
b) Check/^P across item 1-122 every 8 hours. (dPl-93)
c) Check pressure on items 1-122, 1-126 and 1-128 every 4 hours.
d) Check the following temperatures & pressures every 4 hours
Cylinder discharge pressures (PG-68 and pg-96). Item 1-122 gas outlet - TR 40, point 11. Items 1-126 (TG 72) and 1-128 (TG 78) gas outlet. Hydrogen from compressor cylinders. (TG 67 and TG Jacket water supply, TG 83. jacket water discharge, TG 82.
75).
e) Maintain jacket water temperature (TIC 114) 10c
above item 1-124 inlet temperature.
f) Check out alarms and automatic shutdown devices once a month.
MONS 095348
Page 20
Section D Biphenyl Refining System
Crude biphenyl from storage (tanks 1-118 and 1-119) is con tinuously pumped to a valve-type tray fractionating column where product biphenyl is taken overhead, cooled and then is directed to storage. Santowax C bottoms from the column is pumped to a receiver prior to being drummed for storage.
Overhead product quality is controlled by reflux flow con troller FRC-153 which is reset by temperature controller TRC-154. Heat required to generate stripping vapors at the bottom of the column is provided by the column reboiler furnace, item 1-132. Santowax C liquid level is maintained in the column sump via level controller LRCA-152.
1. Biphenyl Refining Facilities
Following is a brief description of the major equipment items in the biphenyl refining area:
a) Biphenyl refining column, item 1-129: The biphenyl refining column is a l'-6" dia. x 39' high, steel, insulated column containing 20 fractionating trays. The column operates essentially at atmospheric pres sure and continuously produces product biphenyl as overhead product at a rate equivalent to 5.5m lbs/year.
b) Column reflux drum, item 1-135: The column reflux drum is a 200 gallon, vertical, insulated, steel legsupported drum containing a level controller and internal steam coil.
c) Refining still furnace, item 1-132: The refining column reboiler is an oil-fired, vertical, cylindrical heater containing a cross-flow convection section and helical-coil radiant section. This unit is designed for a heat absorption rate of 400MBTU/hour and will be located adjacent to the refining column.
d) Column2condenser, item 1-133: The column condenser is a 50 ft. vertical unit mounted above the reflux drum. This condenser is cooled with tempered water from the controlled-temperature warm water circulating loop.
e) Column residue receiver, item 1-138: The residue receiver is a 500 gallon, vertical, insulated, steel leg-supported drum containing a steam-purged level indicator and steam coils (internal and external).
Santowax c residue is intermittently drummed from this
vessel for disposal.
MUNS 095349
Page 21
Section D - Con't
f) Refined biphenyl storage tank, item 1-137: The re fined biphenyl storage tank is a 10,000 gallon, vertical flat bottom, steel tank equipped with a steam jacketed conservation vent valve and internal steam coil.
g) Column tempered water system: The column tempered water system consists of a 125 gallon water tank (item 1-139), a 46 ft. U-tube cooler (item 1-140) and water circulating pumps (items 1-141 and 1-142). This system provides temperature-controlled warm water to the column overhead condenser 1-133.
2, Initial Startup Check-out
Before initial operation of the system, preliminary checks must be made of valves and instruments to see that they are in the proper position for initial startup.
a) Preliminary check of the column feed system
Steam tracing should be on all lines in the feed system and on the column at least 30 minutes before crude biphenyl is charged.
The 1/2" by-pass valve around the feed control valve (FV-139) should be closed. The 1" block valves on either side of the feed control valve should be open.
The 1" feed valve to tray 14 should be open.
The feed flow controller (FRC-139) in the control room should be set in the manual position and the flow control valve should be closed.
b) Preliminary check of bottoms circulating system
Steam tracing should be on at least 30 minutes before crude biphenyl is charged.
The inlet valve to the circulating pump (item 1-130 and 1-131) should be closed at this time but will be opened later. The valve in the discharge line from this pump should be open.
The 3/4" block valves to and from the bottoms sample chamber should be closed.
The furnace coil drain valve (if any) should be closed.
Drain valve in the column bottoms line should be closed.
MUNS 095350
Page 22
Section D - Con't
The globe valve in the return line to the column sump should be open.
The 3/4" by-pass valve around the sump level con trol valve (LV-152) should be closed. The 3/4" block valves on either side should be open.
Valves set so to the
in the bottoms discharge line should be that the column bottoms are recycled back crude biphenyl tanks (items 1-118, 1-119) .
The column level controller, LRCA-152 should be set in the manual position and the control valve should be fully shut.
The column temperature controller (/^TRCA-141) should be set in the manual position and the control valve (in the fuel oil line to the furnace) should be fully shut.
c) Preliminary check of the product cooling and collection system.
The 3/4" block valve in the reflux line should be open. Reflux flow control valve FV-153 should be open.
Valves in the product discharge line from pump 1-136 should be set 30 that the product is recycled to crude biphenyl storage tanks (items 1-118, 1-119) on initial startup.
Biphenyl sample valve in the feed line to reflux tank 1-135 should be shut.
Steam tracing should be turned on all product lines.
(Note: During the initial startup, no product will be put into the Biphenyl storage tank until the column is at equilibrium and is producing specification material. This is being done to prevent contamination of the Biphenyl storage tank with off-grade product.
At this point, the tempered water system should be started up and the circulating water temperature should be adjusted to 186F via TIC-115, warm water should be
started through the Column Condenser (item 1-133).
HONS 095351
Page 23
Section D - Con't
3. Initial Startup
For initial startup, it is assumed that the column is empty with no liquid either on the trays or in the sump.
The column is now ready to be charged with crude biphenyl, and this should be done in the following manner.
a) Start the feed:
With the feed control valve closed, start the
feed pump (item 1-120 or 1-121) in the crude
biphenyl storage area.
Slowly open the feed valve to let approximately 2 GPM of feed into the column. This is done by manually adjusting the output air from the feed flow controller (FRC-139) to the feed control valve. 2 GPM should be indicated on the controller.
Check the FRC-153 reflux control valve to see that it is fully open.
b) Start the heat-up:
when the column level controller LRCA-152 indicates 50%: open the inlet valve to the circulating pump (item 1-130) and start the pump. Check for leaks.
As soon as the column sump level reaches 50%, manually close the feed control valves to stop the feed pump.
Start up the refining still furnace (item 1-132) as per vendor operating instructions for lighting the burner, etc.
Manually adjust the
TRCA-141 temperature con
trol valve so as to raise the temperature of the circulating bottoms stream to 260aC as read on
TR 170, point 1.
Again slowly open the feed valve, and feed 2 GPM until the column level again reaches 50%.
Manually adjust the TV-141 temperature control
valve and raise the temperature of the circulating
bottoms stream to 300 C.
'
M0NS 095352
Page 24
Section D - Con't
Check the temperature at the top of the column (TR-170, point 7). As soon as it reaches 255 c, visually check the sight glass on the reflux drum (item 1-135) to see that there are no leaks or plugs.
Manually adjust the TV-141 temperature control valve and raise the temperature of the circulating bottoms stream to 360C.
c) Set for normal operation:
Set the column level controller (LRCA-152) to 50% and switch to automatic control.
Set the overhead temperature controller TRC-154 at 255C to control reflux flow. Set reflux flow controller FRC-153 on cascade and automatic control.
Set the feed flow controller (FRC-139) to about 1.7 GPM (Design feed rate) and switch to automatic.
Set the reflux drum level controller (LICA-158) to 50% and set on automatic control.
Manually adjust the temperature of the circulating bottoms stream to 390C. This is the liquid tempera ture in the column sump. Set temperature controller ATRCA-141 to automatic with the set point at about 12C. This will control the reboiler furnace outlet temperature to approximately 402C.
Watch the multipoint, TR-170. As soon as the column reaches equilibrium, the column temperature points will level out. At this time samples of the bottoms and product should be taken, analyzed and corrections made as follows:
1. Bottoms-too high in biphenyl concentration correction increase the temperature controller set point by 3C, allow the column to reach equilibrium and resample.
(Note: A good check point for biphenyl quality is column top temperature. Normally this will run 255 C.
MONS 095353
Page 25
Section D - Con't
c2. Product - Too high Santowax
concentration -
low C.P. correction - Increase reflux and resample.
Note: The column is now making specification over head product and is at equilibrium. Both product and bottoms can be switched to storage. This should be done as follows.
Reset the valves in the product line so that the product enters the biphenyl storage tank (item 1-137) . The valve to the crude biphenyl storage tank (item 1-118, 1-119) should be closed. Reset the valves in the bottoms line so that the Santowax C is directed to storage. The valve in the line to the crude biphenyl storage tanks should be closed.
The refining system is now operating at normal conditions. 4. Normal operations
The operation of the refining system is completely automatic and normally requires periodic monitoring as follows:
a) Adjust the feed to the desired flow rate and adjust the reflux flow as necessary to maintain quality product.
b) Check levels in the column (LRCA-152) and reflux drum (LICA-158) every 4 hours.
c) Checkup across reboiler furnace coils every 8 hours.
d) Monitor overall column system temperatures (TR-170) every 4 hours.
e) Check tempered water system to make sure temperature control system is operating properly.
f) Control temperature of biphenyl condensate from the condenser (1-133) at about 90~95c by adjusting the temperated
water temperature accordingly.
5. Normal Shutdown
a) Short Term Shutdown
A short term shutdown of the column system is ac complished by putting the column on total reflux. This should be done in the following manner:
MQNS 095354
Page 26
Section D - Con't
Set the reflux controller, FRC-153, to manual and adjust the output air to the control valve so that the valve is fully open. Close the block valves around LV-158 control valve.
Close the feed valve by adjusting the feed con troller, FRC-139, to 0. Stop the feed pump (item 1-120 or 1-121) . The column is now on total reflux.
b) Long Term Shutdown
Accomplish a short term shutdown.
Shut down the furnace in the manner prescribed in the operating instructions for the furnace (item 1-132).
Set the valves in the bottoms pump-out line so that the bottoms can be pumped back to the crude biphenyl storage tanks (items 1-118, 1-119).
Set the column level controller in the manual position and slowly open the level control valve.
Listen to the bottoms circulating pump (item 1-130 or 131) as soon as it starts cavitating, shut down the pump. Close the LRCA-152 level control valve.
Place a drum under the furnace coil drain valve and drain the coil.
Drain the impeller housing of the bottoms circulating pump (item 1-130 or 131).
Drain the product line and shut down the tempered water system. Blow out the bottoms line to the Santowax C receiver, 1-138.
(Note: Leave steam on all tracing and jackets in the still area.
moms 095355
APPENDIX A
/
PROCEDURE FOR DRYIMG-OUT REFRACTORY ON FURHACE WALLS
The refractory of a new furnace, or a furnace which has been idle for a long period, should be dried out slowly so that the expansion is gradual and uniform. In this way, the entrapped water will vaporise slowly rath er than'boil violently, spalling the brickwork.
If a new furnace is idle during the cold season, measures should be taken to keep the furnace warm; either by lighting a few burners or by steam circulation through the colls, if conditions permit. The refractory which may have absorbed moisture should never be exposed to the atmo
spheric temperature below 32*F.
In new furnaces, drying-out can be started two days after the refractory lining has been finished and cured.
Where pilots are supplied with the furnace, and time is available, the
pilots can be lighted and left burning for 2k hours before lighting the
main burners. This can serve as a preliminary to drying-out and will help dry-out the burner cups.
SUGGESTED HEATING RATES FOR VARIOUS WALL THICKNESS
A. Overall Refractory Thickness-Up to 9" Increase at 50"F/hour to about k00 to 500 Hold for 8 hours at 500" maximum
Increase at 50*F/hour to 1000"F
Hold for 8 hours at 1000"F maximum
Increase at 100F/hour to operating temperatures
B. Overall Refractory Thickness - more than 9"
Increase at 50"F/hour to about k00" to 500"
Hold for 12 hours at 400" to 500"F maximum
Increase at 50*F/hour to 1000"F
Hold for 12 hours at 1000'F maximum '
Increase at 100"F/hour to operating temperatures
Page 1 of 2 Multi 595 Revision 1 - 10/6f
SELAS CORPORATION OF AMERICA
MONS 095356
This is an approximate guide only. During the drying-out operation, pe riodic observations must be made and precautions taken to prevent surface thermal shock or steaming within the refractories which may spall or crack them. Additional holding-time at existing temperature should be held whenever moisture is evident.
Avoid any spot concentration of heat by spreading out and staggering the heat input. For inspirating type burners, set the fuel pressure in the
range of 5 "to 7 psig which will insure stable burner operation while
putting the maximum number of burners in operation and insuring a more uniform heat distribution.
Use a rich air-gas mixture to give a soft flame at the burners by re stricting the air flow. Care should be taken to insure that the longer than normal flame does not come in contact with the process tubes.
Temperature should be measured close to the top of the radiant box In the flue-gas stream. A temporary thermocouple can be inserted through the lighting hole of a burner which is not in service.
The lighting of burners should start with the bottom rows, progressing upward as more burners are required.
Although less than half of the burners are likely to be used for dryingout, all the burners should be tested at this time for operability. That is, during the drying out period burners should be turned off in certain rows and other burners lighted in the same row so that at the end of the operation each burner shall have been operated for at least sev eral hours.
If the furnace is not started up immediately after it has been dried-out, it Is recommended that the temperature of the furnace be maintained at
about 500*F.
During the drying out phase, it is recommended that steam is
flowing through the furnace tubes. Prior to lighting the
first burner, align the 2" valves in the steam line to the
inlet of the convection section and allow steam to purge
through the furnace tubes.
This steam flow should continue
throughout the duration of the drying out step.
Page 2 of 2
MUlti 595
Revision 1 - 10/67
SEIAS CORPORATION OF AMERICA_ _ _ _
MONS 095357
PROCESS DESCRIPTION MMK BIPHENYL AND AROCLOR MANUFACTURING FACILITIES
PROJECT CEA 1668 AROCLOR PLANT
TABLE
OF
CONTENTS
SECTION A
Synopsis of Aroclor Process
Page No. 1
SECTION B
Chlorination
I. Biphenyl Feed Tank.
II.
Chlorinator, chlorinator cooler, Chlorination Circulating Pump.
III. Aeration.
2 2 3
9
SECTION C
Distillation
I. Still Pot, Cyclone, Still Heater, Still Condenser, StillReceiver.
10 10
SECTION D
Absorption
I. Absorbers, Surge Tanks, Polishing Filter, FinishedProduct Storage.
18 18
SECTION E
Blending
I. Blend Tank, Filter, Raw Material Storage.
21 21
HONS 095358
Project Manual Section: 2.11
Date: By: Page:
April 22, 1968 R. S. Yates 1
Section A Synopsis of Aroclor process
Aroclor is a trade name used to designate the chlorination products of biphenyl, biphenyl high boilers or mixtures of the two. Liquid aroclors are produced by chlorinating biphenyl to 21, 32, 42, 48, 54, 60 and 62% chlorine content, chlorination above 63% yields a solid product at normal temperatures. Liquid aroclors are identi fied by a four digit number. The last two digits represent the chlorine content (percentage by weight) and the first two numbers represent the Aroclor condition. If. the first digit is "l" it signifies that the Aroclor has been made from biphenyl. If the
second digit is "1" the product has not been distilled, if it is
"2" the product is a distilled grade. As an example, Aroclor 1242 is a distilled chlorinated biphenyl- containing 42% chlorine.
The first process step in the manufacture of Aroclors is a chlorination step. Biphenyl and chlorine gas in the presence of ferric chloride catalyst are reacted to form a chlorinated aromatic compound. Hydrogen chloride gas is liberated during the reaction and either recovered or drowned in a scrubber and sewered. The main reaction is a simple replacement of hydrogen by chlorine but the product of the chlorination contains trace amounts of halogencontaining by-products which are less stable than the direct ringsubstitution products. Many isomers are formed.
A schematic representation of biphenyl chlorination is as follows:
Taking molecular weights:
Biphenyl Chlorine Hydrogen
chloride
= 154 = 71
= 36.5
Aroclor = 254.1 to 395.6
n from 3.05 to 6.75 n Cl
+n HC1
Biphenyl
Chlorine
Aroclor
Hydrogen Chloride
+n 36,200 BTUs
The second process step is aeration. Dry air is blown through the crude product for two hours to remove trace amounts of HCl and other impurities.
MONS 095359
Page 2
The third process step is a flash distillation. This is carried out under vacuum with a vacuum controller preset to give 40mm Hg absolute at the still pot. Heat is supplied through means of an external oil fired heater. Distillation must be carried out in the presence of lime. The residue product which contains lime, ferric chloride, and tars is generally drawn off to drums and may be sold as "Montars'1.
The fourth process step is to treat the distilled aroclor with porocel, an alumina oxide product. The Porocel absorbs moisture and chloride ions to improve the electrical properties of the Aroclor.
The fifth process step is blending of Aroclor 1260 or 1254 with trichlorobenzene and adding glycidyl phenyl ether (phenoxyl propene oxide) which is a chloride scavenger. Trichlorobenzene increases the fluidity of the Aroclors without seriously harming the electrical properties.
Section B Chlorination
I. Biphenyl Feed Tank
A. Startup and normal operation
1. A fixed charge of 6400 lbs. of biphenyl is added to the biphenyl feed tank for all batches.
2. charging Procedure:
a) Check that steam is on the heating coil
and that the temperature controller 13
operational.
b) Add biphenyl. The tank overflow nozzle to Item 1-137 is set at 785 gallons or 6400 lbs. which is the set point.
B. Control and Alarm System
1. Steam is controlled by means of a temperature controller on the coil of the tank - Set at 100c.
2. Reference is made to Drawing 1-9, Loop No. TIC-202.
MONS 095360
V**
Page 3
C. Emergency Shutdown
1. Shut down agitator.
2. Shut down feed-
D. Scheduled Shutdown
X. Examine coil and agitator to determine if any corrosion has taken place.
E. Miscellaneous
1. An agitator is required in the mix tank if flakes are melted and/or ferric chloride is added to this tank.
II. Chlorinator, chlorinator Cooler. Chlorinator circulating Pump A. Startup and Normal Operation
1. Design Considerations:
a) Charges to the chlorinator are based on the batch system at WGK's Department 246. The de
sign criteria for this unit is, 1) superficial
vapor velocity is equal to the superficial vapor velocity in the WGK unit and, 2) liquid level over the sparger is equal to or greater than that in the WGK chlorinator.
b) A fixed charge of biphenyl is added to the chlorinator in order to prevent mistakes in charging. This charge must be in the chlorinator at the start of chlorination.
c) Manufacture of the liquid Aroclors is essentially the same. Batch data are listed below:
Type of Aroclor
Biphenyl charge Chlorine charge (1) Chlorination time
1142
1148
1154
1160
6450# 9489#
6 hrs.
6450#
12220#
lh hrs.
6450# 15350#
9 hrs.
64 50# 19150#
11 hrs.
(1) 99% available chlorine
M0NS 095361
Page 4
Tvpe of Aroclor
1142
1148
1154
1160
Crude
Hi
Specific Low
Gravity
Temp.
1.352 l.g41 65 C
1.415 1.405 65 c
1.505
1.495 65C
1.566 1.555 90 c
Wt. of Crude Batch
Crude density Temp.
11312#
10. #/gal. 150 c
12713#
ii!#/gal. 150 C
14142#
11.8#/gal. 150c
16200#
12.5#/gal 150 C
Batch volume
1080 gal.
1145 gal.
1200 gal.
1295 gal.
Theoretical Molecular Weight
257.7
292.6
326.6
369.5
d) The heat removal system is based on a heat evolution rate of 510 Btus/hour per pound of chlorine added. Normal evolution at the maximum chlorine input rate of 2015 pounds/ hour of chlorine is 916000 Btu/hour with al
. lowances being made for some radiation losses. Design rating of the external air cooled heat exchanger is 1,150,000 Btu/hour. The addition of a two speed motor to the recommended unit will give a turn down of 3 to 1 representing at the lower speed on input of 670 pounds/hour of chlorine. Batch circulation rate is 250 gallons/minute which allows for a complete batch turnover in 4.3 to 5.2 minutes.
A manual-automatic selector switch is installed on the panelboard to control the fan and select the motor speed.
e) The flow of chlorine to the chlorinator is con trolled by a flow controller which allows manual adjustment of chlorine feed rate with automatic control. The input rate is varied through three levels during the chlorination period to keep entrainment losses to a minimum.
f) Chlorination temperature is held constant by a temperature controller which controls the opening of a shutter assembly located above the air cooled exchanger.
MQNS 095362
Page 5
g) An entrainment separator. Item 1-205, is installed at the top of the chlorinator to prevent aroclor from being lost from the chlorinator. The mist eliminator as proposed will eliminate 99% of all particles 3 microns and smaller, vapor will pass through the unit.
h) Sparger design is based on a chlorine velocity of 50 feet per second, a chlorine rate of 2015 lbs/hour with a 1/4 inch hole size.
2. Chlorinator operation
a) Charging Biphenyl
1. Close valve under chlorinator.
2. Check that chlorinator circulating pump is off and that discharge valve to blow tank is closed.
3. Check that 3" valve in the chlorinator vent line at top of chlorinator is open.
4. Check that 4" valve on the mist eliminator line is open.
5. Open charge line between biphenyl measuring tank and chlorinator. When charging is complete check that the biphenyl tank is empty.
6. close valves between measuring tank and chlorinator. At this time open the 4" cap on the chlorinator and add one bottle of ferric chloride to the chlorinator (3 pounds).
7. Close the 3" valve in the chlorinator vent 1 ine.
b) Operation of Chlorinator
1. Check that cooler fan is off. Note the selector switch could be in the automatic position.
2. Align chlorinator valves so that the chlorinator pump will circulate from the bottom of the chlorinator to the top through the circulating pump and heat exchanger.
MONS 095363
Page 6
3. Turn the circulating pump on.
4. Set the chlorine integrator on the panel board to a value corresponding to 80% chlorination. Set points for 80% chlorina tion for different aroclors are listed below:
Basis: 6450# Biphenyl Charge
Aroclor 1142 1148 1154 1160
Set Point 7500 9700
12300 15300
5. Set the chlorine recorder controller at 1010 pounds/hour and put in automatic position.
6. Set temperature recorder controller at 150C and put in automatic position. Normal batch temperature is 150 C. Manual position switch for 1200 RPM or 600 RPM fan speed depending on weather conditions. Fan will turg on when circulating temperature reaches 150C.
7. Push chlorine start button.
8. Open hand valve on the chlorine line to the chlorinator.
9. The temperature in the chlorinator will rise to 120C within 30 minutes after the flow is
started.
Take a specific gravity reading after two hours to check for a short charge batch. Gravity foroall batches should be less than 1.200 at 65 C after two hours. If gravity is above 1.200 take frequent gravity readings to prevent over-chlorination.
10.
All chlorinator batches should have the chlorine feed rate stepped up manually, but controlled automatically in the following time sequence:
First two hours Next one hour Continue to finish
1010 1335 2015
lbs/hour lbs/hour lbs/hour
M0NS 095364
Page 7
11.
When the batch is 80% finished the light on the annunciator panel will go on and the horn will blow.
12. Take a gravity at this point.
13.
Continue to take gravities, as necessary, until the batch is at the desired finished gravity.
Batches should be finished as follows:
Type of Aroclor
Hrs. of
Batch to be
Chlorina Finished at
tion Time Specific Grav.
Temgerature
1142 1148 1154 1160
6 1.341 to 1.352 ih 1.405 to 1.415
9 1.495 to 1.505
ii 1.555 to 1.566
65 65 65 90
When the batch has been chlorinated to the desired gravity:
a) Shut off the chlorine hand valve.
b) Open vent valve, close the off-gas valve.
c) Turn fan off at the selector switch at the control board.
d) Pump batch to blow tank. Make sure the chlorinator is empty by observing the level in the blow tank.
e) While the batch is being transferred, stroke the chlorine flow controller and temperature controller by moving the selector switch on the instrument re
ceivers to manual and turning the set points to maximum range than to zero.
f) When the chlorinator is empty close pump away valves and promptly recharge with biphenyl.
L
MONS 095365
Page 8
B. Control and Alarm System
1. This is covered in detail on Instrument Schematic Drawing 1-9 which covers the following loops:
FRC-206 TRCA-211
Chlorine flow to chlorinator Temperature control, chlorinator cooler
and Drawing 1-13 which covers the following loop:
PR-316
Chlorine pressure to chlorinator
2. Controls and alarms are set up as follows:
a) Low temperature alarm for chlorination batch, 120C, TRCA-211. The fan will shut
off at 130C and will not start again until
the temperature reaches 150c.
b) High temperature alarm for chlorination batch, 175 C. TRA-200, Point 5.
c) High temperature alarm for chlorination batch, 175 C, TRA-200, Point 4. If this temperature is reached then the flow of chlorine is shut off to the chlorinator. A stop may be required on the chlorine inlet valve if a sudden shut off will affect the chlorine plant.
d) If the circulating pump motor stops for any reason the chlorine inlet valve is closed. Pumi> shutdown is alarmed.
e) An alarm will sound when a set amount of chlorine is added to the chlorinator.
C. Emergency Shutdown
1. Shut off the flow of chlorine to the chlorinator.
2. Shut down the circulating pump.
D. Scheduled Shutdown
1. Examine sparger to determine erosion or corrosion of inlet holes.
2. Examine brinks element to make certain seal pipe is intact.
MONS 095366
Page 9
III. Aeration
A. startup and Normal operation
1. Design considerations:
a) product in the blow tank is blown with air from an external blower or other air source to remove HCl from the crude aroclor.
b) Blowing operation may reduce the acid number, and/or moisture content.
c) External coils are installed on the side of the tank with a steam regulator to control the product temperature.
d) Sparger design is based on an air velocity of 50 feet per second, an air rate of 450 pounds/hour with a 1/4 inch hole size.
e) HCl fumes are drowned in a water-gas scrubber of the Venturi type. The scrubber is based on 50 pounds of water required to drown 1 pound of HCl gas. Heat of solution of HCl gas is 865 Btu/pound.
2. Aeration Tank Operation
a) operation of Air Blower
1. Start air blower and adjust outlet pressure to 10 psig.
b) Operation of Drowning Jet
1. Open water valve to scrubber.
2. Adjust water valve to give a pressure gauge reading of 60 psig.
c) Operation of Aeration Tank
1. Energize the plate coil heating system. This is normally left on at all times.
2. Open valve to sparger at top of tank and observe pressure gauge. A constant vibration of the pointer indicates that the aroclor is being properly blown.
MONS 095367