Document o9E8jOBbv2MdXdKR90gDJqYKR

DownloadRandom document
Illinois Power Generating Company Illinois Power Generating Company Newton Power Station 6725 N. 50011' Street Newton, IL 62448 March 31, 2025 Submitted via email to airaction(alepa.gov President Donald J. Trump c/o Administrator Lee M. Zeldin Office of the Administrator (1 101A) U.S. Environmental Protection Agency 1200 Pennsylvania Avenue, V.W. Washington, D.C. 20460 Re: Presidential Exemption: National Emission Standardsfor Hazardous Air Pollutants: Coal- and Oil-Fired Electric Utility Steam Generating Units Review of the Residual Risk and Technolo;y Review, 89 Fed. Reg. 38,508 (May 7, 2024): Newton Power Station Unit t. Dear President Trump: Please accept this letter on behalf. of Illinois Power Generating Company requesting a Presidential exemption under Section 1 12(i)(4) of the Clean Air Act ("CAA") from compliance with the filterable particulate matter ("fPM") surrogate emission standard for non-mercury metal ha7ardous air pollutants ("HAP") and the requirement to install continuous emissions monitoring systems ("CEMS" or "PM CEMS") under the above-referenced rule (the "MATS RTR" or the "Rule") for Newton Power Station Unit 1 ("Newton"). Illinois Power Generating Company is requesting a two-year exemption, beginning July 6, 2027, from these requirements for the Newton facility. The MATS RTR amended 40 C.F.R. Part 63 Subpart UUUUU and became effective on July 8, 2024. Under the Rule, Newton's electric generating unit ("ECiU") is required to reduce IPM emissions from 0.030 lb/MMBtu to 0.010 lb/MMBtu. Compliance is based on a continuous, 30-day rolling limit. In addition, the Rule requires all coal-fired EGUs to use CEMS to implement the revised fPM standard, rather than allowing EGUs to continue to use stack testing to demonstrate compliance. The compliance deadline for meeting the revised fPM standard and for installing and using IPM CEMS is July 6, 2027, but work to design, purchase, and install the necessary controls and the new CEMS would need to begin much sooner. Under Section 112(i)(4) of. the Clean Air Act. the President may issue exemptions "from compliance with any standard or limitation under this section For a period of more than 2 years if the President determines that the technology to implement such standard is not available and that it is in the national security interests of the United States to do so." 42 U.S.C. 7412(i)(4). Accordingly, the 1 Sierra Club FOIA 2025-EPA-04883 ED_018388_00000155-00001 SC_EVERSPLIT0012910 President is authorized to exercise his discretion to exempt Newton Power Station from complying with the standards set forth in the MAIS MR where (1) the technology required "to implement" the standard is not available and (2) where it is in interest of national security. In light of this authority, and in light of the burden imposed on electric generating facilities by the MATS RTR, EPA has announced the potential availability of such exemptions and asked that requests for exemptions be submitted by March 31. See https://www. epa.gov/stationary-sources-air-pollutioniclean-air-act-section-112-presidential-exemptioninformation. Consistent with that announcement, and for the reasons set forth below, Illinois Power requests a 2-year exemption for Newton from the fPM standard and from the requirement to install and use CEMS. importantly, EPA has been very clear that the IPM standard and the CEMS requirement arc completely integrated, such that any exemption must cover both requirements in the Rule. Specifically, EPA explained "that a fPM standard of 0.010 lb/MMBtu ... is the lowest fPM emission limit possible at this time with use of PM CEMS." 89 Fed. Reg. at 38,534. And EPA identified the revised fPM standard and the PM CEMS requirement as a combined "two-pronged approach," stating that "requiring PM CEMS in addition to a lower fPM limit . . . is the most stringent option that balances the benefits of using PM CEMS with the omission reductions associated with the tightened fPM emission standard." M. at 38,530. In other words, EPA's effort "to implement" its revised standard depends equally on both the more stringent numeric standard for fPM and on the obligation to install new monitoring equipment. Section I explains that the technology required to implement the Rule's revised fPM standard is not considered available on a continuous basis, and Section II explains that CEMS arc likewise unavailable. Given the interdependence of these requirements, however, the unavailability of technology as to either component makes "implementation" of the standard likewise unavailable for the other. Section III concludes that it is in the national security interest to issue an exemption from compliance with the MATS RTR. I. The Particulate Control Technology Required to Implement the Rule's IFNI Standard is Not Available There are technological and operational limits at Newton that make it difficult and expensive to meet the revised fPM standard. EPA based its decision to lower the fPM standard on data from only a select few units, see Pct'rs' Brief at 65-68. North Dakota y. EPA. No. 24-1119, Doe. 2077742 (Oct. 1. 2024), but not all units can meet the revised limit under all operating conditions. Newton currently utilizes an electrostatic precipitator ("ESP") for particulate control. Io ensure compliance with the revised IPM standard, Newton would need to upgrade the existing emission control equipment and/or install new particulate control. If Newton were to rebuild its ESP in an attempt to meet the revised standard, the capital costs per unit could be from $52 million to S 148 million. PG/i:/\: ('ominenis on Proposed Rule: NASHAP loaf- and O/f-Fired Elearie nil/m Steam Generaiing (.'nits /levies-t of the Residual Risk and rechnoloKi, 1?eview, Docket No. EPA-I IQ-OAR-2018-0794-5994, at 12 (June 28, 2023) [hereinafter "PEEN Comments"]. Such a project is cost ineffective per ton of fPM removed. /d. at 17. Moreover, continuous compliance with the revised fPM standard cannot be guaranteed, even with considerable upgrades or a complete rebuild of the ESP. Instead, it is likely that installation of a new ba2housc would be necessary to meet the revised standard. However, this technology is not available because it is designed and installed on a site 2 Sierra Club FOIA 2025-EPA-04883 ED_018388_00000155-00002 SC_EVERSPLIT0012911 and facility specific basis and is cost prohibitive. A new baghousc would cost $150-360/kW to install, which does not include operating costs. Ralph L. Roberson, Technical Comments on EPA's Proposed Rule: Mercury and Air Toxics ,S.tandards Risk and Technology Review, Docket No. EPA-HQ-OAR-20180794-5994, at 3 (2023) [hereinafter "PM CEMS Technical Memo"]. Additionally, other issues exist regarding the installation of a new baghousc, including the space needed for the large footprint a new baghouse requires. We are unaware of any other available particulate control technology that would be cost effective and satisfy space constraints. Newton's operational limitations could also hinder the ability to continuously comply with the fPM standard. Although some units may be able to achieve a rate of 0.010 lb/MMBtu under certain conditions, the Rule requires continuous compliance. Even units that can achieve the limit in ideal conditions may not be able to continuously meet that limit during peak load conditions when they cannot do off-power rapping or maintenance and cleaning of PM controls. During the summer, most units operate at base load and run at high-capacity factors. It may be difficult to maintain optimal operation of control technologies during peak summer conditions unless there are additional outages scheduled for such maintenance, which may not always be feasible. Moreover, the characteristics of coal vary depending on location. Ash content of the coal being fired may impact the ability of units to comply with the f-PM limit, regardless of the effectiveness of the control technologies in place. Other operational factors such as cleaning frequency, operational duration, and maintenance frequency may impact the performance of ESPs and a facility's ability to comply with the proposed limit. These concerns arc exacerbated by the companion requirement to measure compliance using monitors that have not been demonstrated to be reliable. II. CENTS Technology is Not Available I u: MATS RTR requires coal-fired units to implement the revised 1PM standard using CEMS, rather than periodic stack testing. As explained above, this requirement is an integral part of the numeric limit itself. Newton does not have PM CEMS and has historically utilized quarterly stack testing to demonstrate compliance with the IPM standard. Ihcrc are technological limitations, as well as costs and market limits, that make adoption of CEMS by July 2027 unattainable. PM CFMS does not provide direct measurements; it uses correlation curves to calculate emissions levels. However. the low [PM standard in the Rule makes developing this correlation curve "virtually impossible." PGEN Comments at 22 (citing PM CEMS Technical Memo at 3). Similarly. the QA/QC criterion for CEMS are extremely difficult to meet at such low levels. See Comments of the Class of '85 Regulatory Response Group on the Proposal on .Vational Emission Standards fin- Halardous Air Pollutants: ("oal- and Oil-Fired Electric Utility Steam Generating (.nits Review of the Residual Risk anti Technology Review. Docket No. EPA-HQ-OAR-2018-0794-5989. at 16 (June 28, 2024) [hereinafter "Class of '85 Comrncnts"]. In fact, at the time of the proposed MATS R FR, no commercially available PM CEMS would have been able to meet the tight confidence and tolerance intervals associated with the low proposed IPM standard. PEEN Comments at 23 (citing PM CEMS Technical Memo at 5). EPA was, thus, forced to address these issues in the final MA IS RTR by loosening the QA criterion and correlation procedures. See 89 Fed. Reg. at 38,528-29. However, it has not yet been shown that these changes arc enough to address the fimdaryiental issue that PM CEMS has difficulty reliably measuring such low 1PM levels due to the error rates of the instrument. See PEEN Comments at 23 (finding insurmountable the "uncertainties inherent the in the measurement device" and the "problems associated with relative size of 3 Sierra Club FOIA 2025-EPA-04883 ED_018388_00000155-00003 SC_EVERSPLIT0012912 the uncertainty to the limited data range of fPM concentrations and the confidence levels and tolerances"); see also Class of '85 Comments at 18. And, in reality. units would need to target emissions below 0.010 lb./MMbtu in order to ensure continuous compliance. See Pet'rs' Brief. at 72. Iherefore, the CEMS technology to demonstrate compliance with the revised fPM standard is unavailable. Second, there are significant costs and market limitations associated with PM CEMS, which make it "not available." Installing and operating CFMS is more costly than stack testing. See PGFN Comments at 25-26. Costs include purchasing and installation of CFMS, as well as potential modifications to the units to accommodate CEMS. extended correlation testing, and annual operational costs. See id. at 26; see also Class of '85 Comments at 18 (estimating $180,000 to $400,000 for "site preparation and engineering analysis, analyzer equipment and installation costs, and initial PS-11 correlation testing"). This does not include the costs of maintaining a full-time employee to operate PM CEMS and the costs of lost generation during testing events For CEMS. Luminant Comments at 16-17. There are also market factors which limit the availability of installing and operating CEMS by the compliance deadline. There area limited number of vendors for CFMS, as well as a limited number of professionals certified to install and test CEMS. Currently, two-thirds of facilities utilize stack testing and would need to install CFMS by July 2027, which would overwhelm the current supply of CEMS and the availability of professionals certified to inspect and test the newly installed systems. See Class of '85 Comments at 16. III. It is in the Interest of National Security to Issue an Exemption for the Rule The requested exemptions from the MATS RTR are in the national security interests of the United States. the Rule adversely affects the nation's energy generation capacity and threatens grid stability and the supply of affordable, reliable energy. The Rule's stringent limits and the high costs associated with compliance, particularly in combination with other rulemakings impacting coal-fired FGUs, places a considerable burden on the operation of the Newton units. And MATS rules have historically resulted in the loss of generation capabilities the 2012 MA IS rule resulted in the retirement of approximately 60,000 MW of coal-fired capacity. Pet'rs' Brief at 23. As explained in Lurninant's Comments. coal plants "continue to be of paramount importance for grid reliability during the transition to renewables." hl. at 29. Energy generation and grid reliability have, in turn, been identified by the President as issues of national security and it is. therefore, in the interest of the nation to exempt these units from compliance with the MATS RTR. As set forth in President Trump's Executive Order ("17.0.") 14156, Declaring a National Energy Emergency, the "generation capacity of the United States [is] . . . far too inadequate to meet our Nation's needs" and "a reliable, diversified, and affordable supply of energy" is necessary to ensure "military preparedness." 90 Fed. Reg. 8,433, 8,433 (Jan. 29, 2025). The E.O. continues, "integrity . of our Nation's energy infrastructure--from coast to coast--is an immediate and pressing priority for the protection of the United States' national and economic security," while "insufficient energy production ... constitutes an unusual and extraordinary threat to our Nation's economy, national security, and foreign policy." Id. at 8,433-34. As explained above, the MATS RTR is one of the "policies" that the President has indicated will contribute to the "inadequate and intermittent energy supply" and "increasingly unreliable grid." N. at 8,433. Similarly, in E.O. 14154. Unleashing American Energy, President Trump acknowledged that prior regulations which include this Rule have "limited the generation of reliable and affordable electricity" and, in turn, "weaken[ed] our national security." 90 Fed. Reg. 8,353, 8,353 (Jan. 29, 2025). This E.O. plainly states it is in "the national interest to unleash America's affordable and reliable energy" and that 4 Sierra Club FOIA 2025-EPA-04883 ED_018388_00000155-00004 SC_EVERSPLIT0012913 ensuring "an abundant supply of reliable energy" will help "protect the United States's economic and national security and military preparedness." M. Providing the requested exemptions will achieve these goals of ensuring national security through the supply of reliable energy. Moreover, F.O. 14154 specifically calls for the review and potential rescission of rules like this one, which "impose an unburden on the . use of domestic energy resources." M. at 8,354. Thus, in order to ensure a sufficient and reliable supply of energy, President Trump should use his lawful authority under Section 112(i)(4) of the CAA to grant the requested exemptions from compliance with the standards set forth in the MATS RTR. If you have any questions regarding this submittal, please contact Jim Ross at Jim.Ross(dyistracorp.com . Sincerely, Cynthia Vodopivec Senior Vice President, Environmental Health and Safety 5 Sierra Club FOIA 2025-EPA-04883 ED_018388_00000155-00005 SC_EVERSPLIT0012914