Document o93zgyVoQDKYdbBwOv9xB1578

FILE NAME: Asbestos Cement Pipe and Sheet (ACPS) DATE: 1972 July 20 DOC#: ACPS016 DOCUMENT DESCRIPTION: Unpublished Report - Pipe Fabrication 1 j ( ( ) Env. ' .entai Uenver GHQ Ju ly 20, 1972 Control Departiaen ~ PIPE FABRICATION Date Operation Count F/ce Pi 4/10/72 Power Machining 0-6 (1) 0.4 3/9/72 (2) Power Machining 28.0 24.0 3/17/72 u; 4/10/72 3/9/72 3/17/72 4/10/72 3/9/72 3/17/72 Power Machining Manual Machinincr Manual Machining Manual Machining Hand Rasping Hand Rasping Hand Rasping 1.2 4.1 0-4 1.2 0.4 13.7 3.6 20.0 2.5 3-3 2-5 1-6 1.2 8.2 20.0 2.5 MTB004042 ( f \ -J fv f-' 4 co cn cd cty .co er\ o ', ! * coctn eo (n co O' pe Size 1? 1 II >1 II ll II H II 1 M H II II M tl 6*' 8" 6" 3 " Comments Sampled inside walkway - strong draft blowing away from operator. Sampled outside - mo de ra te to strong drafts present - Frequent swirling winds contaminated area Short sample time - not representative of the average concentration. Sufficient sampling time. Sampled inside walkvray - Strong draft blowing away from operator. Same as item #2 S a m e ' a s i t e m #3 Same as item #1 Sa me as it e m #2 Sa me as i t e m #3 PRODUCED JM - 83 ( PIPS Page July FABRICATION 2 20, 1972 Date 4/10/72 Operation Skil Saw 3/9/72 Skil Saw 4/10/72 3/9/72 3/17/72 3/9/72 3/9/72 Hammer & Chisel (Tapping for Sewer Saddle) Hammer & Chisel (Tapping for Sewer Saddle) Hammer s Chisel (Tapping for Sewer Saddle) Power Cutting with Carbide Tip Blade Hand Sawing MT8004043 ( ( ri Count F/cc 4.1 2.9 4.5 123.0 129.0 9 6.0 1.2 19.0 2.5 6.9 5.5 9.9 3.3 Pipe Size 4" 6" 8" 4'1 6" 8" 8" 8" 8" 4" 6 " ,8U 4" Comments Same as item #1 Same as item # 2 Same as i t e m #1 S a m e as itera #2 S a m e as i t e m '#3 Same as item #2 Same as item #2 PRODUCED JM - 83