Document o7amozV9q03pp1z1aDY7bgXE

PPG Industries, Inc. Chemicals P.O. Box 1000 Lake Charles, Louisiana 70602 January 31, 1992 Mr. Tom Coerver Department of Environmental Quality Air Quality Division P O BOX 44096 Baton Rouge, LA 70804-4096 Dear Mr. Coerver: Re: Quarterly Fugitive Emission Report In accordance with the provisions of LAC 33:III.2121.F, the PPG Industries Lake Charles Complex is hereby submitting its quarterly fugitive emission monitoring report for the period of 10/01/91 through 12/31/91. The 0.44 percent of components leaking value once again demonstrates that the PPG Complex is at the "good performance level" for the quarter. Attached for your review are the following tabulations and summaries for this quarter: Attachment I Attachment II Attachment III Attachment IV Attachment V Attachment VI Attachment VII Attachment VIII Attachment IX Attachment X Attachment XI Attachment XII Attachment XIII Complex Performance Summary Test/Repair Summaries Delayed Repair Summary Turnaround Repair Summary EDC #1 Unit Data EDC #2 Unit Data VDCM Unit Data Tri-Ethane II Unit Data Ethyl Chloride Unit Data Per/Tri Unit Data waste Treatment Unit Data CPC Unit Data VCM II Unit Data Also included in this report as Attachment XIV is a summary of monitoring of all inaccessible values which is performed annually. All other required monitoring not otherwise listed was performed. Items listed in Attachment IV, Turnaround Repair Summary, are those believed to risk higher emissions if repair is attempted without a unit shutdown. SL 025217 (318U491-4326Y qUestions warding this report, please call me at Respectfully, G$Mw/lS . % Esther s. Liggio vq Environmental Control Specialist ESL/vk Certified Mail/Return Receipt Requested Sh 025218 ATTACHMENT I DARBONNE SERVICES. INC. PPG INDUSTRIES, INC. QUARTERLY REPORT SUMMARY AND GOOD PERFORMANCE For Psnod Ended 12/31/91 GOOD PERFORMANCE LEVEL Number of Components Monitoreds Number o-f Components Leaki no: Number of Components Repaired: 7SB9 35 30 7. of Components Leaking: .44 of Components Repaired! 35.71 All monitoring of fugitive emissions has been performed as required by Section LI.21 of the Louisiana Air Quality Regulations. :`PG INDUSTRIES. INC. Signature (Jtj DARBONNE SERVICES,, INC. A. Title C Ate 2% ___________ Date SL 025219 Attachemnt II, Page 1 a' : i .1, f. ' J C-lL i :;Eh t r Darocsnn'j Services lisc. .. inwuo i r\ a P.. G- BOX 100-.- LAKE CHARLES LOUISIANA 70602 fLANT SUMMARY UMMARV FOR THE PERIOD '/01/91 throuoh 1/91 ------------------ NUMBER OF COMPONENTS ------------IN UNIT TESTED LEANING REPAIRED ------- PERCENT -------EARING REPAIRED 'r-O . I OPT iEA VY ,jr ' -AS 1 4rsB 13 3862 10. -.2 IQ.. 003 1004 Q.J 14 i0 014 4 '.3 4 3 11 i') 0 0 0 0 0 0 . 17 0 . 07 0 0 1..- 37.5 90.9 0 100 0 0 0 0 GGNF JIEN 'TFE SERVICE 'V 4A i ' / 5? -'"< ML; r" .-iI-aI "V !sur ,'\t rl!_L- !-iLL \1 ~ f ORAN TOTAL SUMMARY BY COMPONENT TYPES ------------------ NUMBER OF COMPONENTS------------IN UNIT TESTED LEAKING REPAIRED 3340 7398 003 r=7 O 76 4 214 4 66 4 *= = - hisses iS=;^^s;s;3a = : *3635 **7SE6 19 4 Mr L Jr A o 17 13 0 o 0 3* * * U -------- PERCENT--------LEAKING REPAIRED .25 6.07 o 0 4 89. 47 100 0 <) o ; = = =..--=s:.: 93. 75 * Kf 1-* -9 COMPONENTS WERE ADDED THIS QUARTER AND 05 COMPONENTS WERE DELETED. 3 COMPONENTS ARE PREVIOUS SHUTDOWN ITEMS. NEFE GUT Or SERVICE THIS QUARTER. 76v COMPONENTS 0 CDriFCNENTS WENT ON SHUTDOWN THIS QUARTER. SL 25220 YPE rrer r"re HIATUS HATE REP. ATTACHMENT DETAILS IJ,-PAGE. REPAIR ilETHDE* REPAIR SUC. EEHON. READINSCATE BATE REFAIR ANT '.'3l *8 i;-ll-?i 10001 li-!!-?! -lEHTENED PACKING valve 11-11-9; 10001 11-11-91 TIGHTENED PACKING 383 Fuse 11-12-91 10001 11-20-91 REPLACED PUMP SEhl 3383 lal is 11-13-91 1000! < NO REPAIR ATTEMPTED > 4701 PU2D 1_!2-0) 10001 11-13-91 REPLACED SEAL 9743 V si vs 11-13-91 10001 11-13-91 TIGHTENED PACKING 7MC PUM 11-13-91 1000! 11-13-31 REPLACED PUMP SEAL '191 Valve 11-13-31 10C01 1 NO REPAIR ATTEMPTED 3 "".79 Fuse 10001 11-20-91 REPLACED PUMP SEAL m '.'alve 11-13-91 13001 11-13-91 TIGHTENED PACKING 11-25-91 REPLACED VALVE 3 Valve 11-13-91 10001 11-14-91 REPLACED VALVE 9421 Valve 11-14-91 10001 11-18-9! REPLACED VALVE END FLOG 9730 Pmo 11-14-31 10001 11-18-91 REPLACED PUMP SEAL 9'45 Puao 11-14-91 10001 11-18-9! REPLACED PUMP SEAL 10019 Valve *!-t 1000! 11-20-31 TIGHTENED PACKING 11-21-91 TIGHTENED PACKING MT42 Valve !1-14-31 10001 11-19-91 REPLACED VALVE END PLUS 9461 PuiD 11-14-! 10001 11-15-9! REPLACED PUMP SEAL 696 Valve 11-14-91 10001 11-19-91 REPLACED VALVE END PLUS 036 Filip 11-14-91 10001 11-15-91 REPLACED FUHP SEAL 9041 Valve 11-14-91 100C1 11-14-91 TIGHTENED PACKING 056H Valve 11-14-91 10001 11-14-91 TIGHTENED PACKING 11806 Valve .J1-15-91 10001 11-22-91 REPLACED PACKING w e Fuao *1-15-91 10301 11-19-91 ADJUSTED SEAL FLUSH 11-21-91 REPLACED PUMP SEAL 12364 P'JBO 11-05-91 L 10-09-91 REPLACED SEAL ^ 12379 Puap 11-13-91 1000! 11-13-91 ADJUSTED SEAL FLUSH YES 3000 = :I-l!-9! YES MGO z 11-11-91 YES .) il-21-91 CAN NOT IISOLATE YES 0 = 11-14-91 YES 100 Z 21-13-9! YES 0 - 11-22-91 SHUTDOWN FOR REPAIR YES 0 z Il-2>=1 NO 10001 - 11-13-9: YES 0 z 12-02-91 YES 0 -- 11-14-91 YES 0 - 11-20-91 YES Vn 2 11-20-9! YES 0 = 11-20-9! NG 10001 z j1-20-91 YES 200 -- 11-21-91 YES 0 Z 11-20-91 YES 0 = 11-20-91 YES 0 - H-20-91 YES 1500 - 11-20-91 YES 4000 -- 11-14-91 YES 3000 z 11-14-91 YES 0 -- 11-22-91 NO 10001 S 11-20-91 YES 0 - 11-22-91 YES 0 10-16-91 NO : .'.001 = I1-13-91 11-25-91 11-21-91 11-21-91 11-19-1 ATTACHMENT II, PAGE 3 420 ?aae 11-15-91 10001 12445 Valve 11-15-91 10001 12480 Valve 11-15-91 10001 12482 Valve 11-15-91 10001 12597 Valve 11-15-91 10001 13054 Puip 11-18-91 10001 13283 Valve 11-18-91 10001 11-13-91 ADJUSTED SEAL FLUSH 11-20-91 TIGHTENED PACKING 11-21-91 REPLACED PUMP SEAL 11-15-91 TIGHTENED PACKING 11-15-91 TIGHTENED PACKING 11-20-91 ADJUSTED SEAL FLUSH 11-20-91 TIGHTENED PACKING YES YES YES YES YES YES YES ij = 11-18-91 soco : 11-20-91 100 = 11-22-91 500 = U-15-91 0 = 11-15-91 300 = 11-20-91 1000 = 11-20-91 SL 025222 ATTACHMENT III Me For' ,:LU; iin , r -" -- ,-t L- ^ JC;C Sin~5 ar j jd Ended Lac at' 4! R;< nthvlE-ns ^traair, Ethvl erv- Uni t:\ ast Unit: EDC 42 10/91 Shutdqwn Date Leak Located: Da ts Pep air Comp 1et ed: ami; nr n+ Dave to Repair: 04/25.'90 Date Component Rechscked: Readino on Recneck: Cate Main Dati.g-airor '~i Uv" anance Attempted: 04/24/91 Anticipated: >4/92 Renal r Del a.-: Cannot Ivolaste______ Ethylene Flow Control EDC Valve v-o o1 Date Leak Located: L Date Repair Completed: Number o-f Dave to Repair: . 3/2/91 10/01/91 56 Date Component Rechecked: 12/13/91 Reading on Recheck: 0 Date Maintenance Attempted: 03/05/91, 10/01/91 Date Repair Anticipated: 04/92 Reason ter Repair Delay; Cannot Isolate Maior 7620 #2 Crude Tank EDC Va1 va Hverhaul______ EDC 2 (0 4/91 Date Leak Located: Date Reoair Completed: Number -.9 Days to Repairs 06/05/1 10/01/91 56 Date Component Rechocked: 12/13/! Reading on Pecheck: 2000 D ite Maintenance Attempted: Date Repair Anticipated: ___ Reason tor Repair Delay: 4174 Product Valve Piping 03/05/91, 10/01/91 10/91 Cannot Isolate Maior Mani-fold EDC Overhaul______ EDC 41 04/91 Date Leak Located: 'Date Repair Completed: Mumper o+ Daye to Repair: 03/05/91 10/01/91 56 Date Component Rechecked: 12/18/91 Reading on Recheck: 0 Date Maintenance Attempted: Date Repair Anticipated: h Reason tor Repair Delay: 08/05/91. 10/01/91 10/91 Cannot Isolate M&icr Overhaul 025223 SI* ATTACHMENT III P^GE 2 T:-.; i-i.-iaCi '.'Iad j iVLI I /' .'j c ocat1 on ETHYLENE Lata Leas: Located 0 t e Re a a i r Completed Numosr -j-f Davs to Repair 1/ 19/91 stream_____ ethylene Un i t \ --St Unit Shutc-oi-jn. TRI-ETHANE II 11/11/91 Date -wOmpcnerit Rechecked! Read mo :n F echsc k : Date Maintenunce Attempted: Date Repair Anticipated: 01/12/92 ____ R-'-aeon ter Repair Delav: SD Required Eli 7 TOP #1 CRUDE EDC VALVE STORAGE -for Repair EDC Tri-Ethane II 03.- 01/37 Date Leak Located: Cate Aeoa.'. r Completed: i mber . f Dc:ys co Repair: 05/06/91 Date Component Rechecked: Reading -,-n Re-check: .0 a . a Lai- -1 en an c a A11 c-mp ted: Data Repair Anticipated: !~eaa on - or Repair Delay: 0?1 EC REACTOR !ALvE PIPING 03/02/92 3D F-sauirsd -for COOLER E0 Repair CNI ETHYL 10/91 CHLORIDE Date Leak Located: Date Repair Completed: Number ci Days to Repair: 11/13/91 Date Component Rechecked: Reading on Recheck: Date Maintenance Attempted: Date Repair Anticipated: 10/92 Reason -for Repair Delay; SHUTDOWN FOR REPAIR_____________________________________ 68 32 Secondary Stripper Vent EC Ethyl Chloride va.l-/e PCV . 07/91 Date Leak Located: Dace Reoair Completed: Number Days to Repair: 08/09/91 10/08/91 61 Date Component Recnecked: 10/16/91 Reading on Recneck: 0 Date Maintenance Attempted: 08/09/91. 10/08/91 Date Repair Anticipated: 06/92 Reason -for Repair Delav: Can Not Isolate ______________________________ i 2524 ETHYLENE PCV EHTYLENE VCM II Valve 7/90 Date Leak Located: Date Repair Completed: Number o-f Days to Repair: 05/10/91 Date Component Rechecked: Reading an Fecheck: te lamtenanca Attempted: Date Repair Anticipated: Reason Rjr Repair Delav: 05/23/91 & 06/21/91 1/92 Requires Repacking or Replacement SL 025224 Outs: 01/27/92 ATTACHMENT IV PPG INDUSTRIES, INC. Quarterly Report Items Awaiting Turnaround For Repair For Feriad Ended 12/31/91 Page 1 Unit; EDC #2 Tag /\ .DescrlDtion 7729B VaIve in Gas Service Unit: 7RI-ETHANE II T g !4 \ . lest? idtiun 25 i l / vALIE IN GAS SERVICE Unit; TRI ETHANE II A Tag t\ Descr-i pt i on 58S3 VALVE IN GAS SERVICE Unit: ETHYL CHLGRIDE Tag i'-\ .Deucription 700 i VALVE IN L. LIQUID 3ERVII:e Uni :: VCM 11 Tag 4\ .Descriotion 12524 VALVE IN GAS SERVICE Last Unit Shutdown: 10/15/91 Next Turnarounds 04/92 Location ttl Rx Etnylene Last Unit Shutdown: 03/87 Next Turnaround: 03/92 Location TOP #1 CRUDE EDC STORAGE Last Unit Shutdown: 11/11/91 Next Turnaround: 01/12/92 Location ETHYLENE JET Last Unit Shutdown: 10/91 Next Turnaround: 10/92 Location EC REACTOR COOLER PIPING Last Unit Shutdown: 07/90 Next Turnaround: 01/92 Location ETHYLENE PCV SL 025225 ATTACHMENT V, pag 1 Darbonne Services Inc. PPG INDUSTRIES. INC. P.Q. BOX 1000 LAKE CHARLES LOUISIANA 70602 EDC #1 TEST ACTIVITY SUMMARY FOR THE PERIOD 10/01/91 through 12/31/91 COMPONENT TYPE SERVICE ------------------ NUMBER OF COMPONENTS ------------IN UNIT TESTED LEAKING REPAIRED -------- PERCENT -------LEAKING REPAIRED Va 1 ve GAS 27 27 0 0 Valve LIGHT LIQ. 596 391 n Valve HEAVY LID. 1 00 F'UfflD LIGHT LIQ. 22 16 0 0 Compressor GAS 00 PRV GAS 4 00 PRV LIGHT LIQ. 5 4 0 0 0 .51 0 0 0 0 0 0 100 0 0 0 0 0 SUMMARY BY COMPONENT TYPES COMPONENT TYPE SERVICE ------------------ NUMBER OF COMPONENTS ------------IN UNIT TESTED LEAKING REPAIRED -------- PERCENT --------LEAKING REPAIRED Va 1 ve ALL Pump ALL Compressor ALL PRV ALL 2=;a=:3;==== == = == GRAND TOTAL 625 419 r 2 22 16 0 0 00 9700 = =t3===t=35== "====!*== ==a=ss=3Sttsa 3Ssa3====saa 658 *444 i-ji .47 0 0 0 .45 100 0 0 0 100 * 214 COMPONENTS WERE OUT OF SERVICE THIS QUARTER. SV 02 TAG I TYPE TEST DATE STATUS SATE REP. ATTACHMENT V, page 2 REPAIR DETAILS REPAIR METHOD REPAIR SUC. REMQN. READINS=DATE DATE REPAIR ANT. Valve 10001 4670 Valve u-ii-91 I COO I 11-11-91 TIGHTENED PACKIN5 11-11-91 TIGHTENED PACKING YES 3000 = 11-11-91 YES 3000 = 11-11-91 SL 025227 ATTACHMENT VI Darbcnne Services Inc. PPG INDUSTRIES INC. P.O. BOX 1000 LAKE CHARLES LOUISIANA 70602 EDC #2 TEST ACTIVITY SUMMARY FOR THE PERIOD 10/01/91 through 12/31/91 COMPONENT TYPE SERVICE ------------------ NUMBER OF COMPONENTS ------------IN UNIT TESTED LEAKING REPAIRED -------- PERCENT --------LEAKING REPAIRED V=tl Vfc? GAS 67 59 0 0 V*1 - ~ L IGHT I.IQ. 290 274 0 0 'a rtw *? HEAVY LIQ. 1 1 00 jr | ^ LIGHT LIQ. GAS 12 1 12 1 0 0 0 0 - RV LIGHT LIQ. 2 0 0 0 00 00 00 00 00 00 il ll li ll II II U II It (1 II II II II It II II II !1 II II SUMMARY BY COMPONENT TYPES COMPONENT TYPE SERVICE NUMBER OF COMPONENTS ------------IN UNIT TESTED LEAKING REPAIRED Valve ALL P Assip ALL PRV ALL =.- = = = = aa-======== GRAND TOTAL 358 12 373 ll If ll II tl II ll II 334 12 1 *347 0 0 0 ========== 0 0 0 0 0 -------- PERCENT --------LEAKING REPAIRED 00 00 00 =3SBSS= r=: 00 * 1 COMPONENT IS A PREVIOUS SHUTDOWN ITEM AND 25 COMPONENTS WERE OUT OF SERVICE THIS QUARTER. SL 025228 ATTACHMENT VII, page 1 Darbonne Services Inc PPG INDUSTRIES, INC. P.G. SOX 1000 LAKE CHARLES LOUISIANA 70602 VDCM 'EST ACTIVITY SUMMARY FOR THE PERIOD 10/01/91 throuoh 12/31/91 COMPONENT TYPE SERVICE ------------------ NUMBER OF COMPONENTS ------------IN UNIT TESTED LEAKING REPAIRED -------- PERCENT -------LEAKING REPAIRED Vai ve GAS 69 ''al ve LIGHT LIQ. 676 Va1 v i HEAVY LIQ. 1 Pump LIGHT LIQ. 23 FRV LIGHT LIQ. 4 "V LIGHT LIQ. 4 '= = *ws: ==zz ^5 s=: a:s.;-u z== cs ss -- ^ 69 676 1 23 4 4 ^3SSS=z:SS^ 0 0 0 1 0 0 0 0 0 1 0 0 0 0 0 3.57 0 0 0 0 0 100 0 0 COMPONENT A TYPE SERVICE Valve Puirip PRV CV ALL ALL ALL ALL GRAND TOTAL SUMMARY BY COMPONENT TYPES ------------------ NUMBER OF COMPONENTS ------------IN UNIT TESTED LEAKING REPAIRED 746 746 0 0 28 28 1 1 4400 4400 ^732 782 1 i -------- F'ERC ENT-------LEAKING REPAIRED 0 3- 57 0 0 0 100 0 0 . 12 100 IS COMPONENTS WERE ADDED THIS QUARTER AMD 2 COMPONENTS WERE DELETED. li II It II II !1 II !1 II II ll II II II it ll ll ll II ll li ll It II II II II II !i <1 II il II II II lJ it II II II If i! Ji n II ii il ii II ii li ii li ll It ll il ll II ll ll ll ll ll ll ll ll ll ll II II it il ll ll it f1 II II II II II II li H II ll II II II II II It II II II 11 II II SL 025229 ATTACHMENT VII, PAGE 2 3 I TYPE TEST DATE STATUS DATE RE". REPAIR DETAILS REFAIR SETHGD "PAIR SUC. saw. R-AC!N3=SATE SATE REPAIR ANT. 333 Paoa 11-12-91 tOOCi !1-20-91 REPLACED PUHP SEAL YES ;-21-91 SL 025230 ATTACHMENT VIII, page 1 Darbonne Services Inc. PPG INDUSTRIES, INCP.0. BOX 1000 LAKE CHARLES LOUISIANA 70602 TRI-ETHANE II TEST ACTIVITY SUMMARY FOR THE PERIOD 10/01/91 through 12/31/91 COMPONENT TYPE SERVICE NUMBER OF COMPONENTS ------------IN UNIT TESTED LEAKING REPAIRED ------- PERCENT ------LEAKING REPAIRED it.? . , -- V t-A *. V Val ve Val ve r LUTiO PRV PRV - = " = rs GAS 175 LIGHT LIQ 1063 HEAVY LIG 1 L.IGHT LIQ . 42 GAS 4 LIGHT LIQ 2 II ll II II ll II ll 1! It II II II II II II 174 1039 1 42 4 10 00 00 11 00 00 ====;=:====::= 3SS = 2*"5335 S -- it II II II II lj II I! II 11 II II .57 0 0 2.33 0 0 0 0 0 100 0 0 COMPONENT YPE SERVICE Valve Pump PRV ALL ALL ALL GRAND TOTAL SUMMARY BY COMPONENT TYPES ------------------ NUMBER OF- COMPONENTS-------------IN UNIT TESTED LEAKING REPAIRED 1239 1214 10 42 42 1 1 6600 1287 *1262 2 **1 -------- PERCENT --------LEAKING REPAIRED .08 2.38 0 0 100 O . IS 50 * 1 COMPONENT IS A PREVIOUS SHUTDOWN ITEM AND 24 COMPONENTS WERE OUT OF SERVICE THIS QUARTER. ** 1 COMPONENT WENT ON SHUTDOWN THIS QUARTER. SL 025231 ________________________ TAS I TYPE TEST DATE STATUE DATE REP. ATTACHMENT VIII, PAGE 2 REPAIR DETAILS REPAIR NETHGD REPAIR ELC. SENG?!. READ INSTATE DATE REPAIR ANT. SS33 Valve 11-19-91 10001 s701 Puep 11-12-91 10001 < NO REPAIR ATTEMPTED > 11-13-91 REPLACED SEAL CAS HOT ISOLATE YES 0 = 11-14-91 SL 025232 ATTACHMENT IX, page 1 Darbonne Services Inc. PPG INDUSTRIES P.U. BOX 1000 LAKE CHARLES LOUISIANA 70602 ETHYL CHLORIDE TEsT ACTIVITY SUMMARY FOR THE PERIOD >0/01/71 throuoh 12/31/91 COMPONENT TYPE SERVICE ------------------ NUMBER OF COMPONENTS -----------IN UNIT TESTED LEAKING REPAIRED -------- PERCENT -------LEAKING REPAIRED ''aI v? GAS 161 143 1 1 Vai Vr LIGHT LIQ. 376 372 1 Vsl ve HEAVY LIQ. J 00 -'`.IfflD LIGHT LIQ. i 6 IS -> r PV n p\j GAS LIGHT LIO. 0o \ i) -- = = = SSSi:= = = := = " ---- -- -- .69 . 53 0 13.33 0 0 100 50 0 100 0 0 il il ll il ll II H II II II II ii II II il II II II II II II 11 iItI ti 1! !! ii Ii II II II II Ii II II !1 11 COMPONENT TYPE SERVICE Valve ALL Pump ~RV 7T =. ITT rs ri ~ ALL ALL GRAND TOTAL SUMMARY BY COMPONENT TYPES ------------------ NUMBER OF COMPONENTS ------------IN UNIT TESTED LEAKING REPAIRED -------- PERCENT --------LEAKING REPAIRED 540 518 16 15 44 ==*=*= -- *== = == 560 *537 O . 57 66.66 13.33 100 00 0 === = =;= =;; s =s'==:ss =s7.s3:=:>^:,v2= 0 5 **4 .93 ao * 23 COMPONENTS WERE OUT OF SERVICE THIS QUARTER. ** 1 COMPONENT WENT ON SHUTDOWN THIS QUARTER. II 1) ll ll ll II ll ll II II ll St nii 91 II ii ii 1! 1! II II ii !l II II II ii ii il It II II II II II || 1! ii !! II Ii 025233 St ATTACHMENT IX, PAGE 2 REPAIR DETAILS TEST DATE STATUS DATE REP. REPAIR METHOD 6763 Valve 11-13-91 10001 7006 Fuao ii-13-31 10001 7091 Valve 11-13-91 10001 717S Puo 11-13-91 10001 7189 Valve 11-13-91 10001 11-13-91 TI5HTENED PACKING 11-13-91 REPLACED PUMP SEAL < NO REPAIR ATTEMPTED > 11-20-91 REPLACED PUMP SEAL 11-13-91 TIGHTENED PACKING 11-25-91 REPLACED VALVE REPAIR SUC. REHOM. REAOINS=DATE DATE REPAIR ANT. YES 100 11-13-91 YES 0 = 11-22-91 SHUTDOWN FOR REPAIR YES 0 = 11-20-91 NO 10001 11-13-91 YES 0 = 12-02-91 SL 025234 nc. PPG INDUSTRIES, INC. P.0. BOX 1000 LAKE CHARLES LOUISIANA 70602 PER TRI ACTIVITY SUMMARY FOR THE PERIOD 10/01/91 thrauah 12/31/91 COMPONENT 'YPE SERVICE ------------------ NUMBER OF COMPONENTS ------------IN UNIT TESTED LEAKING REPAIRED -------- PERCENT -------LEAKING REPAIRED v**1j. vfcf Valve Valve PUsTiD PPv PR',' GAS 403 LIGHT LIQ 2199 HEAVY LIQ. 1 LIGHT LIQ. 67 GAS LIGHT LIQ. 6 ======== 234 1952 1 60 O 5 1 66 00 44 00 00 ================== .42 .3 0 6.66 0 0 100 100 0 100 0 0 iS ii :i ii !1 i! ll ii II II il ii t! II II 11 II II II II II It II II II II II II li II II II It it II II II II II II il II 11 11 II 11 11 il II il ll II ll ll ll Ii II li II 11 11 II jIjI ii il n il II II COMPONENT ^ TYPE SERVICE Valve PumD PRV ======== ALL ALL ALL GRAND ~OTAL SUMMARY BY COMPONENT TYPES ------------------ NUMBER OF COMPONENTS ------------IN UNIT TESTED LEAKING REPAIRED 2603 2187 7 7 67 60 4 4 11 8 0 0 *2681 **2255 11 11 -------- PERCENT --------LEAKING REPAIRED a 32 6. 66 0 100 100 0 100 II ll II II II II II II II ll ll CO 1! II * II II II II II il ll il It II II II II ll ll II ll il II II II II II 1! * 17 COMPONENTS WERE ADDED THIS QUARTER AND 43 COMPONENTS WERE DELETED. ** 426 COMPONENTS WERE OUT OF SERVICE THIS QUARTER. SL 025235 J "jCw i" TYPE n A TC STATUS SATE REP. REPAIR DETAILS ATTACHMENT X, PAGE 2 REPAIR METHOD REPAIR SUC. ROOM. READINSTATE DATE REPAIR ANT. r~ Li.J 4 4 r< f "k4l Valve 4 10001 Valve ii-h-vi 10001 -"TO PlllD ; 1-14.01 10001 9745 Pusp H-14-91 10001 '0019 Valve 11-14-91 10001 0142 Valve !1-14-91 10001 Sfc&i Faso li-14-=l 10001 3fc?6 Valve 1-14-91 10001 ri\ Faso ;t_i4_3i 10001 '-041 Valve 11-14-91 10001 9056H Valve 11-14-91 1000! 11-14-91 REPLACED VALVE 11-19-91 REPLACED VALVE END PLUS 11-18-91 REPLACED PIMP SEAL 11-18-91-REPLACED RUHR SEAL 11-20-91 TIBHTENED PACKING 11-21-91 TISHTENED PACKING 11-19-91 REPLACED VALVE END PLUS 11-15-9! REPLACED PUMP SEAL 11-19-91 REPLACED VALVE END PLUS 11-15-91 REPLACED PUKP SEAL 11-14-91 TISHTENED FACKINB 11-14-91 TIGHTENED PACKING YES 0 * 11-14-91 YES 0 = 11-20-91 YE5 0 11-20-91 YES 0 = 11-20-91 NO 10001 = 11-20-91 11-21-91 YES 200 = n-21-91 YES 0 = 11-20-91 YES 0 = 11-20-91 YES 0 = 11-20-91 YES 1500 = 11-20-91 YES 4000 = 11-14-91 YES 3000 = 11-14-91 SL 025236 DaA?55$r Inc. PPS INDUSTRIES, INC. P.O. BOX 1000 LAKE CHARLES LOUISIANA 70602 WASTE TREATMENT UNIT TEST ACTIVITY SUMMARY FOR THE PERIOD 10/01/91 through 12/31/91 COMPONENT TYPE SERVICE ------------------ NUMBER OF COMPONENTS ------------IN UNIT TESTED LEAKING REPAIRED --------- PERCENT --------LEAKING REPAIRED Valve GAS 52 52 O 0 Valve LIGHT LIQ. 240 222 0 0 Valve HEAVY LIQ. 1 0 0 0 Pump LIGHT LIQ. 4 4 0 0 Compressor GAS 1 1 00 PRV LIGHT LIQ. 1 0 0 0 00 00 00 00 00 00 SUMMARY BY COMPONENT TYPES COMPONENT TYPE SERVICE - NUMBER OF COMPONENTS ------------IN UNIT TESTED LEAKING REPAIRED -------- PERCENT --------LEAKING REPAIRED Val ve Pump Compressor PRV ALL ALL ALL ALL ii ll ll ll II tl II ii GRAND TOTAL 293 4 1 1 = = =;====r=s== 274 4 1 0 *299 **279 00 0 00 0 00 0 00 0 = ^==SS=S=SB=SStt35SS==aSSSS=SS 3ss=ssss=^:sis:= = 00 0 0 0 0 0 0 II II II II II II II II II ll ll H II II IE It II II ll ll II II ll ll ll ll bjLfitW * 3 COMPONENTS WERE ABDED THIS QUARTER. ** 20 COMPONENTS WERE OUT OF SERVICE THIS QUARTER. SL 025237 V Darbonne Services Inc. ~ PPG INDUSTRIES, INC. P.0. BOX 1000 LAKE CHARLES LOUISIANA 70602 WTU CPC ATTACHMENT Page X TEST ACTIVITY SUMMARY FDR THE PERIOD 10/01/91 through 12/31/91 COMPONENT TYPE SERVICE ------------------ NUMBER OF COMPONENTS ------------IN UNIT TESTED LEAKING REPAIRED --------- PERCENT -------LEAKING REPAIRED Val ve GAS UB 118 1 1 Val ve LIGHT LIQ. 329 315 0 0 Val ve HEAVY LIQ. 1 1 00 Pump LIGHT LIQ. 6 6 0 0 PRV GAS 2200 PRV LIGHT LIQ. 5 5 0 0 .84 0 0 0 0 0 100 0 0 0 0 0 SUMMARY BY COMPONENT TYPES COMPONENT TYPE SERVICE NUMBER OF COMPONENTS ------------IN UNIT TESTED LEAKING REPAIRED -------- PERCENT --------LEAKING REPAIRED II II ll li ll ll II ll ll ii ll 1) II ll ll II ll ll ll Hlv Pump PRV ALL ALL ALL ,======:=== GRAND TOTAL 448 6 7 *461 434 1 1 6 00 700 :=ss===3=== ==== = === = ============== **447 1 l . 23 0 0 .22 100 0 0 100 li ll II ll ll 11 II II 1! ll II II ll ll II ll * 22 COMPONENTS WERE ADDED THIS QUARTER AND 3 COMPONENTS WERE DELETED. ** 14 COMPONENTS WERE OUT OF SERVICE THIS QUARTER. SL 025238 TAG I TYPE TEST BATE STATUS RATE REP. REPAIR RETAILS REPAIR METHOD ATTACHMENT XII, PAGE 2 REPAIR SUC. REMOH. READINB=DATE DATE REPAIR ANT. U8DA Valve 11-15-91 IQOOt 11-22-91 REPLACED PACKING YES 0 = 11-22-91 SL 025239 Darbonne Services Inc. PPG INDUSTRIES, INC. P.0. BOX 1000 LAKE CHARLES LOUISIANA 70602 VCM 11 ATTACHMENT XIII Page 1 TEST ACTIVITY SUMMARY FOR THE PERIOD 10/01/91 through 12/31/91 COMPONENT TYPE SERVICE ------------------ NUMBER OF COMPONENTS ------------IN UNIT TESTED LEAKING REPAIRED -------- PERCENT -------LEAKING REPAIRED V a 1 vs GAS 396 37S 4 4 1.05 100 Val vs LIGHT LIQ 1093 1093 1 1 .09 100 Val vs HEAVY LIQ. 1 1 00 00 PUifip LIGHT LIQ. 31 31 55 16. 12 100 Compress or GAS 2 1 00 00 PRV GAS 25 23 0 0 00 F'RV LIGHT LIQ. 6 6 0 0 00 = = ISS== =S ===============aa^= ============= ==aa;=== ========= ========================== SUMMARY BY COMPONENT TYPES COMPONENT TYPE SERVICE ------------------ NUMBER OF COMPONENTS ------------IN UNIT TESTED LEAKING REPAIRED -------- PERCENT --------LEAKING REPAIRED II II II li II II II II II 11 II II II ll li ll II ll ll Val ve Pump Compressor PRV ALL ALL ALL ALL GRAND TOTAL 1490 1472 5 5 31 31 55 2 1 00 31 29 0 0 ========ssssssxas ========= :$==ss3s==s^= *1554 **1533 10 10 . 33 16. 12 0 100 100 0 00 ===sss===s====:=i~ .65 100 * 2 COMPONENTS WERE ADDED THIS QUARTER AND 4 COMPONENTS WERE DELETED. ** 1 COMPONENT IS A SHUTDOWN ITEM AND 20 COMPONENTS WERE OUT OF SERVICE THIS QUARTER. ll li 1! II II II It II SL 025240 TAS I TYPE TEST DATE STATUS DATE REP. REPAIR DETAILS REPAIR METHOD ATTACHMENT XIII REPAIR ?&?E rBuM. READ1NS=DATE DATE REPAIR ART. P'ias 11-15-91 10001 12364 Fuep 10-05-91 1w 12379 Fmp 11-15-91 10001 12T20 Puep 11-15-91 10001 12145 Valve 11-13-91 10001 12480 Valve 11-15-91 10001 12482 Valve 11-15-91 10001 12597 Valve 11-15-91 10001 13054 Putp 11-18-91 10C01 13233 Valve M< t -1feQtrf .01fe 10001 11-19-91 ADJUSTED SEAL FLUSH 11-21-91 REPLACED PUMP SEAL 10-09-91 REPLACED SEAL 11-13-91 ADJUSTED SEAL FLUSH 11-19-91 REPLACED PUMP SEAL 11-18-91 ADJUSTED SEAL FLUSH 11-20-91 TIBHTEHED PACKING 11-21-91 REPLACED PUMP SEAL 11-15-91 TIGHTENED PACKING 11-15-91 TIGHTENED PACKING 11-20-91 ADJUSTED SEAL FLUSH 11-20-91 TISHTENED PACKING NO 1000! s 11-20-91 YES 0 11-22-91 YES 0 10-16-91 NO 10001 s 11-19-91 YES 200 = 11-20-91 YES 0 2 11-IS-91 YES 8000 = 11-20-91 YES 100 - 11-22-91 YES 500 z 11-15-91 YES 0 -- 11-15-91 YES 300 s 11-20-91 YES 1000 = 11-20-91