Document o2yaNgO3jQKzqmVnBV1B5Gz3

JOB HO. 002-1026 COMPANY CONFIDENTIAL GENERAL OFFICES J. T. V. R. R. A. G. L. L C J. C. A, G. G. W. B. 0. H. L. ANNISTON Bell Haupt ------- Haydel/T. E. Lackey/J. E Jeasea Mund LdhotfQ . Landwehr McCarty Millar Severaon William. PROGRESS REPORT TECHNICAL SERVICES DEPARTMENT ANNISTON. ALABAMA PLANT REPORT HO. I DATE February 16, 1970 TITLEi OBJECTIVE! Work Plan for Identifying and Quantifying PCB Loaaea at Annlaton To iletermlne how much Aroclor la being loat and to pinpoint aa cloaely aa poeiible where theae loaaea ara occurring. Alao, to determine aoma economical (If poaalble) meana of reducing theaa loaaea. PERtOHHELt REPORTED BYi lUMMARYi E. t. Wright (C W. Millar) E. fe. Wright The1 2p3urpose of thla work will be to quantify the PCB loaaea from the Annlaton Plant. The aourcaa of theaa loaaea are already known by the preWoua aampling which waa dqne In the Aroclor department during 1969. Sailing will be conducted at four polnta within the Aroclor department: (1) Aroclor chlorinetor aewer, (2) Aroclor atill room aewer, (3) HCl department aawer, (4) warehouse aewer. The other aanpla polnta which wilT be monitored will be the total plant effluent and the HCl neutrallsa'tlon pit influent. FUTURE: Extrema cara will ba exarclaed In the handling and the preparation of the aamplee for analyala. Thla la being dona because of the extremely sensitive analytical method which will be used to analyse the samples (i.je,, PPB range). Eqi ipment la presently on order to provide an "Aroclor-free" lab and alto to provlda the necessary analytical instrumentation. Prepent attlmates ar that the "Aroclor-frse" lab will ba lnatalled by May 31, 1970. In th< meantime, an off-alta lab will be set up. A technician is presently being trained and will spend full time on this work. 1. Continue sampling through 1970 to evaluate cleanup work. 2. Make recommendations on the locations of sumps. 3. Provide analytical support for PR&D work on Aroclor pollution. I I 0SW 013804 ANNliTON Technical Services Department WATER PCB-SD0000055611 TSD ProgressjReport Mo. Job No. 002-JD26 I -2 - De flit .1 SamplingI Sampling of the vaate atreama will be acconpllahed by ualng amali perlstalllc type pumpa. All aamplea vlli be 24 hour compoalte aamplea with the exception of aamplea collected outalde the plant (l.e.t Choccolocco and Snow's Creek). These aamplea will be "grab" type aamplea. All of tne realdue (mud) aamplea will be "grab" aamplea. Preaent thinking la that sampling will begin during the week of March 16. Samplea from out alde thejplant and realdue samplea will be collected a minimum of one time per mont! .2 Flow Heap urements: Flow measurements will be made and recorded at each of the e points daily. These measurements will be made by fabricating and instk lllng Weirs for each of the sewers which will be sampled. 3. Sample Collection: Extreme caution to prevent contamination will be exercised during tie collection of theae aamplea. This la necessary due to the high sensitivity of the analytical method (PPB). All sample bottles will be preweshei with C.P. acetone, rinsed with' distilled water and capped tightly to prevent contamination. All sample collection bottles (i.e., bottles used to collect 24 hour samples in flald) will be inspected each time a sample le taken, and if any visible organics are left in the bottle, it will be taken to the laboratory to be washed with C.P. acetone. Only glass bottles will be used both for the collection of the samples and transporting the samples to the laboratory since polyethylene or other synthetic bottles could possibly absorb some Aroclor and consequently contaminate later samples. 4. Analytical Method: The method which will be used Is a gas chromatographic electron capture method which was developed by Dr. E. S. Tucker at Organic Research. The necessary equipment has been ordered and delivery is expected by Marcn L. Setting up the equipment ahould take approximately two weeks. Therefore, sample analysis can probably begin March 16. 5. General: The first phase of sampling will be of two months duration. Approx Ifimately lve to six samples per day will be analysed for FCB. This will require full time (8 hrs./day) for a technician and about half time for the pollution control engineer. The second phase of the sampling period will continue through all of 1970. The primary purpose of the second phase of sampling will be to evaluate the effectiveness of any cleanup measures taken (l.e., sumps, coalescing units, carbon treatment, etc.). Analytical support will also be provided for^tJee'TWJ) study on Aroclor cleanup. This program will represent a coat oi/^50 M donlars in 1970; this Includes new Instru mentation, laboratory facilities^smd required manpower to execute this program^ OSU 013805 WATER PCB-SD0000055612