;aiSER EHGINESBS VJSEKLI FIELD ACTIVITY REPORT
Week Ending September 12, 1967
WHITHER:
Clear and cool
throughout the period.
Client:
Armeo Steel Corporation
Location: mddlstowuJMa
Job Humber: 64.71
TEIjPSRATURE: Maximum - 85 degrees Minimum - 44 degrees
JOB VISITORS
B. Prochozka, II. V/, Schuchaan, I. D. Thunder, P. Zorena S. J. Wolf, J. Robinson, Bill Frank, 0, H. Hanson
SUMMAIff FORCE REPORT
Management General Supervision Field Engineering tfarehs. & Mtl. Control Survey Office Srv. & Repro. Clerical Craft *
TOTAL
Kaiser Engineers
53 18 3 47 28 39
2 23 9
----. hisk
75 1,926
Foothill Subcontractors Stegfeste Total
22 11
4
16 1*222
1,232
19 6 49 12 98 2 34
29 9
21 37 &L 2*65.5
667 3,900
* Average for week of men on payroll.
Average for week of Crafts is as follows:
Kaiser Engineers
Subcontractors Foothill Electric
1,697
1,129 575
Total Crafts Y/orking 3,401
KEN 003952
-3 -
tfEEKLT PIED) ACTIVITY REPOST Ueek Ending September 12, 1967
PROJECT PROGRESS
1, 71A3 - HOT gPBTP T-TTT.T.
1.1 Pcccavatlcn and Backfill: 6,339 cubic yards of backfill was caspleted during the period for a total to date of 337,334 cubic yards.
1.2 Concrete: 325 cubic yards of concrete was placed for a total to date of 209,139 cubic yard3. The major concrete pour this period was the slab-on-grade between the steam trench and the slab reject car near colum line 1.
1*3 Structural and Miscellaneous Steel: At the Clarifier Building, the miscellaneous steel platforms and walkways are now complete. Remain ing work consists mainly of outside ladders and monorails, lliscellaneous ironwork in the Hot Strip Mill was continued during the period in all areas. Progress was continued at Toughers #4, 5 and 6 on floor plates and pipe covers in the flame area. S'1 handrail work is new near com pletion at the extractor side of the furnaces. The dry scale removal plates, rails and walkways at the furnace charging side and extractor side was continued during the period. This work is now 75$ complete. Rails and rail stops for the transfer cars in the slab yard are now 30$ complete. Assembly of transfer cars is now in progress. Progress was also maintained on stairway entrances in the main mill aisle cf the Hot Strip Mill. Installation of lay down blooms are complete and the lay down slabs in the main mill aisle are now 35$ complete. Pro gress continued on grating installation at the charging end of furnace #1 and in the dcwncoiler area. Floor plate and handrail installation for the coil conveyor facility was also in progress during the period. An estimated 500 tens of miscellaneous steal and hatch covers remain to be installed in the Hot Strip Mill.
1.4 Hoofing and Siding: 600 square feet of Stealox siding was installed during the period at the X-ray house facility for a total Hot Strip Mill quantity of 653*693 square feet.
1.5 Haafc-frip mad Ventilating: Progress was continued during the period on bag house installation at the Hot Strip Mill. Bag house units #8, 9 and 3 are now ccuplete. At bag houses #4* 5 and 15, the sain work re maining consists of electrical lighting and power wiring. The elec trical work at these three bag houses is now 3C$ complete. At Bag house #1, the electrical work is 30$ complete. Bag houses #2, 6 and 7 are now 75$ complete. Remaining activities consist of electrical power wiring, limiting, intake duct work, fan guards, clean-up sod painting. The remaining five bag houses are now 70$ complete. During the period, fan plenum installation was continued at bag houses #11, 12 and 13. At the Clarification Plant, no progress was recorded on heating and ventilating systems; however, the work areas are being made available for progress to continue on the completion cf these
KEN 003953
-4-
iJESKUf PISUD ACTI73TT REPORT Week Ending September 12, 1967
unite next period. At the finishing mill director, R2 director, and extractor director roan, the diffusers are now being installed. This installation wi.il couplets these three units. At the downcoiler director roaa, remaining air conditioning consists of setting the condsnsing unit -with piping and electrlcan installation to follow. At the downcoiler conveyor director room, duct wrk is scheduled to pro ceed next period. During the period, progress continued on installa tion of heating and ventilating ducts at the slab yard scheduling office. At the boiler house control room and the instrument repair house, diffusers were installed for completion of these air condition ing units.
Mechanical: Eichleay continued with a full wordc force in all areas of the Hot Strip Mill during the period. In the furnace area, erection of furnace pusher #2 drives, charging table #12, table #11, and furnace pusher #3 were in progress during the period. In the rougher area, pro gress consisted mainly of installation of vertical scalebreaker side guides and edger adjustments, installation of rougher8 #1, 2 and 3 spindles and carriers. In the finisher area, progress was continued on the looper drive shafts, air gap adjustments for the main mill drive motors and main drive torque tubes. At the downcoiler and coil conveyer facility, progress continued on installation of the #3 pinch roll ma chine, installation of hob runout table motors, installation of auxi liary drives and motors and coil conveyors #7, 3, 9 and 10. At Scale Pit #3, erection of the scale removal system ccntinusd diring the period. The structural framing at the north end of the scale pit was 60 complete at the dose of this period. Eichleay Corporation worked Saturday, September 9, cn mechanical items in the rougher and finisher areas of the Hob Strip Mill.
The following uncoupled tests were accomplished during the period: the finishing mill #2 and 3 turntables, vertical scalebreaker edger housing adjustments and vertioal scalebreaker centering aide guides. Uncoupled testa for the vertical scalebreaker are now completed. Uncoupled tests were started at the furnace approach table #3 during the period. Coupled tests were ccapleted for delay tables #1, 2 and 3 north of rougher #6. Coupled teats were initiated at the vertical scalebreaker cn the main drive with rolls in place. Vlestinghcuae initiated area sequence teats at render #6. Auto-roll sequence tests were started at rougher #5. Completion of lube oil #4 is presently affecting tbs testing schedule for the furnace pusher area. A test run was completed at the #2 roll grixder facility in the Roll Shop and cue roll waa successfully ground. This grinder is now essentially complete except for punch list items and Armco take-over.
KEN 003954
UESXLT FI3LD AGTI7ITT REPORT Week Ending September 12, 1967
lo7 Pipings During the period, 3,344 linear feet of piping was installed for a total to date of 243,118 linear feet. The rgraining quantity to complete is 103,631 linear feet, Major piping systems worked on during the period were: grease, hydraulic system 18, hydraulic system 17, hydraulic system 15, mill coaling water, fUraace cooling water, clari fied water sample system, plant air, chemical system, heating - venti lating and instrumentation piping. The Sier-Bath pomp fear lube oil #4 was returned from the factory after rework during tbs period. This completes all rework for the Sier-Bath pumps. Hydro testing was com pleted on hydraulic system 12 and pickling of this system is now in progress. Repickling end flushing was complete far lube oil #4 during the period and permanent oil will be installed in the tank on September 14th. Horgoil #1 is scheduled for repickling next period. Delta Pipe Line Contractors maintained good progress on service piping In the Hot Strip Ilill during the period. A total of 2,468 linear feet of service piping was installed during the period for a total to date of 14,102 linear feet. This contract is now 30$ complete.
1.8 Electrical: Foothill Electric Corporation installed 18,000 lbe. of exposed conduit during the period for a total to date of 1,198,000 lbs. or 98$ complete. 211 lbs. of embedded conduit was installed for a total to date of 1,493>000 lbs. or 93$ ecoplete. 2,400 feet of 2.4 7 cable was Installed for a total to date of 31,000 feet or 71$ com plete. 43,000 feet of lew voltage cable was installed for a total to date of 1,250,000 feet or 35$ complete. 700 low voltage terminations were accomplished for a total to date of 25,800 or 35$ ecoplete. 21.000 feet of control cable was installed for a total to date of 1.534.000 feet or 89$ complete. 1,300 control cable terminations were accomplished for a total to date of 36,400 or 63$ complete. 12.000 feet of computer cable was installed for a total to date of 506.000 feet or 62$ complete. 700 computer cable terminations were accomplished far a total to date of 12,400 or 41$ ecoplete. 4,000 lbs. of lighting conduit and 7,000 feet of lighting wire was installed during the period. 133 lbs. of structural grounding was installed for a total to date of 128,000 lbs. or 96$ casplete.
1.9 Miscellaneous Subcontracts: At the Clarifier facility. Bay Construction Company completed installation of the Walker Processing equipment, however, they are scheduled to return to the job site on September 13 for final check out of their equipment.
Bilbrey Masonry Contractary erected block work for the recorder roan at cduzm &L and 62 alcng 3-line. Hi3 remaining work will consist mainly of punch list items.
KEN 003955
-6-
UBBCOT FISID ACTIVITT ESPOBT Week Ending September 12, 1967
I-Iooschl-Etfwards continued with installation of vent doors at tbs pump house. All doors are now at the job site for the pump house facility, During the period, field measurements were completed for twenty open ings along E-line of the Hot Strip Mill for doer fabrication. Seven mors openings are remaining to be framed and measured for door fabri cation,
During the period, I-fyron Cornish Company continued with accoustical calling Installation in the boiler house control room, the instrument repair room and director rooms along E-line,
The Owens-Coming Fiberglas Company insulated 204 feet of 165 lb, steam line during the period. Approximately 12,000 feet of 165 lb, steam lines have been insulated to date. Insulation of the deaerator and storage tanks 13 now 90# complete. Insulation of the condensate tanks at Elevation 154 remains at 70# complete.
Salam-Brosius maintained good progress on the three reheat aLab ihmacee during the period. At #1 furnace, refractory work was continued on the lining of the waste gas stack which will couplete next period. Gas refractories were installed in the unit #1 dampers during the period and up-take refractory installation was initiated this period. Progress continued cn the check out of furnace pipelines at unit #1 and revamping of water supply piping to fhraace 3* Wire pulling and termination work was continued at furnace #1 throughout the period. Furnace #1 is new 91.6# complete and the overall furnace contract completion is 79$ com plete.
Babcock and Wilcox maintained progress daring the period cn installation of ventilating ducts, combustion air ducts and lagging for unit #1. Work was also continued cn unit ife induced draft fhn, bearing and rotor installation, #3 inlet air duct and hot gas duet installation and in stallation of refractory lining in the 2 combustion air transition. This subcontract is now 65# complete.
The Mo Piping (Coribrector for the Waste Heat Boiler and over piping) is new 86# complete. During the period, progress consisted mainly of pipe installation as follows: 12" treated water piping, 12" toiler feed piping, 6" fuel oil headers, drain lines, steam piping to $3 boiler drum and steam piping to the F.D. and I.D. fan turbines. Piping changes are still being made by Bravo design in this area.
KEN 003956
--buIf
-7t-iSEgg FIEID ACTIVEX BEFORE Ueok Ending September 12, 1967
Nora Woolley (Contractor for the Waste Heat Boiler 2" and under piping) is now 33$ complete. This contractor is continuing to have difficulty in increasing his piping forces. During the period, progress was re corded on atomizing steam piping to the #1 bailer burners, condensate piping between the condensate pumps and idle desuperheaters, trim piping
at the forced draft fan turbines for unit #1 and the 2 fUel oil return
line below Elevation 154*
Ilinneapolis-Honeywell (Instrumentation Contractor for the Waste Heat Boiler Area) is now 22$ complete. During the period, installation of instrument piping was continued at #1 boiler between Elevation 173 and 192. l/2n stainless steel tubing was installed between the master con trol panel and the steam drums for units #1 and 2,
2. 7H6 - 5IAB LULL
2.1 Excavation and Backfill: 5,389 cubic yards of backfill was completed during the period for a total to date of 167,410 cubic yards.
2.2 Concrete: 802 cubic yards of concrete was placed for a total to date of 42,84 cubic yards. llajor concrete pours during the period were: idle perimeter walls for the Scale Pit #4, third lift, crop conveyor north wall, first lift, scarfer flume slab betvreen E-line and Scale Pit #4, the wall along E-line between column 9 and 10 and the mill office building foundation.
2.3 Structural and Miscellaneous Steel: Bag house support steel was com pleted for all five bag houses during the period. Side wall panels and hopper installation was initiated on bag house #1. Cover plates over the crop conveyor to Selina was started.
2.6 Mechanical: During the period, Eichleay Corporation installed landing table# for transfer car #1 and continued with progress on the slab shear motor generator in the mill aisle. Progress was maintained on the miU approach table #3 motor bases, mill runout table #10 motor bases, scarfer runout table #13, pilar #1, scarfer approach table #11, the vertical mill bed plates and the horizontal mill separators. Eichleay is maintaining a work force of 40 men on mechanical installa tion la this area.
2.7 Pining: Hunter (Piping Contractor for the Slab I-Iill Piping) dining
the period continued with installation of equipment setting and piping
in the slab
oil cellar and in the slab mill main aisle. Hunter's
work force is now 60 men on the job site with half the crews working
in the sain mill aisle and the other half in the oil cellar. During
the period, progress was continued on lube oil systems #3, 6 and 7
along the west wall of the basement. Mill water piping was also con
tinued in the basement. In the main mill aisle, progress was continued
on plant air piping, natural gas piping, o:<ygen and grease header piping.
KEN 003957
ii. jd yw m
*es
-a-
IIEEKU FIEED ACTIVE?! HEPOST Ttfek Ending Septenfcer 12, 1967
2.8 Electrical! 3,000 lbs. of embedded eenduit was installed during the period for a total to date of 577,000 lbs. or 90$$ complete. 300 feet of cable tray was installed for a total to date of 11,COO feet or 79% complete.
3. 71A3 - SC&KDP PITS
3.1 Excavation and Backfpli 23 cubic yards of backfill waa accomplished for a total to date of 111,013 cable yards*
3.2 Concrete! 291 cubic yards of concrete was placed for a total to date of 24,388 cubic yards. Major concrete pours during the period were! charging track slabs, loading dock walls 7 to Z-line at eolmm 2.5, the 7-line trench wall between stack #4 and 5 and the drive house cable trench walls*
3.3 Structural and His<H*naois Steel! 25 tens of structural steel was erected during the period for a total to date cf 4,014 tone* Ohio Valley expects to complete structural steel erection at the east end of the mill this week. Erection of the east ingot buggy drive house was initiated during the pearled*
3.4 Rocfing and Siding! 4,300 square feet cf StedLcx aiding was installed far a total to date cf 37,268 square feet*
3*6 Mechanical: Loftus Engineering during the period consisted the refractory lining for the six soaking pit stacks* The refractory installation for arches and collecting flues for battery #6 is eccgiste and 85% complete on battery #5* The steel plats installation fer bsttexy #5 pits is essentially complete* Loftus also maintained good progress on pipe installation at battery #5 and 6 during the period. The 16" coke oven gae andl2* natural gpe amnifolda have been installed* The burner gas piping at battery #6 and battery #5 is near completion. Liner plate installation waa initiated in battery #4 and battery #5 and 6 recupera tors are nor being set In place* Progress was generally good in this area during the period*
4. 7128 yUaro aaraai shop
4.1 ExcavaiioQ- fi*kflll! 4,503 cubic yards of excavation was completed for a total to date of 167,578 cubic yards. 24,514 cubic yards of backfill was completed for a total to date of 165,547 cubic yards* Period excavation consisted mainly of the IJ2 sphere footings and back fill progress for the period was accomplished along G and H lines and at the hot metal reladling pit.
4.2 Concrete! 920 cubic yards of concrete was placed for a total to date of 15,294 cubio yards. Major concrete work during the period consisted of the bay slab for the ladle reUne pit, 8 footings along D-line and Biline, 14 piers along E, F and G column line and the reladle walkway slab.
KEN 003958
irjHp-i
ii"--1 " 1
9
UEBKLY FUSED ACTIVITT HSFOHT Uek fading September 12, 1967
4.3 structural and tascellaneoua Steal; 33 tens of structural steel was erected in the Ibid Yard for a total to date of 1,901 tons. Hoof trusses for this building are nor complete between column 24 and. column 2* Erection of girts and purlins are complete between coluan 24 and column 13 and bolt-up has been completed on the structural steel between column 24 and coluan 7* This building Kill be ready for roofing and aiding by next period. Seven car loads cf structural steel arrived at the job site for the main B.O Building.
5. teas - STRIPPER buhdiik
5.3 Structural and Miscellaneous Steel: 113 tons of structural steel swas erected for a total to date of &5 tons. 3 of the 13 roof trusses for this building were erected during the period and is expected to complete next period.
6.1 Excavation and Backfill: Backfill work was continued in the Green Coil Storage facility in both aisles. Grading and compaction was in progress and this area is almost up to grade.
6.2 Concrete* 526 cable yards of concrete was placed at the Fickle line facility during the period for a total to date of 5,647 cubic yards. 22 cubic yards of concrete was placed at the Pickle Coil Storage for a total to date of 2,493 ethic yards. 114 cubic yards of concrete was placed in the Orem Coil Storage for a total to date of 5# 537 cubic yards. Major concrete pour* during the period consisted of entry motor room, slab between coltaw 20 and 23 in the pdckLe facility, the and electrical underground duct cncosecant at the Green Coil Storage facility.
6.3 Structural m* fflf*rinaouo Steel* During the period, structural bolt-up and completion of girts sad purlins were cortbimed and portions of the building has been released for roofing and aiding.
Hocfins sad Sidinsi 1,600 square feet of aiding was installed at the Finds Building for a total to date of 96,364 square fet. 15,000 squart-feet of roofing was installed for a total to date of 66,752 squares:fbst. In the Green Coil Storage^ 13,680 square feet of roofing was installed for a total to date of 13,630 square feet.
KEN 003959
t 9*WW
mmz 10
HEEKLX FUSED AGTIV3TC BffiOHf VJeek Coding September 12, 1967
6.3 Electrical: At the Green Coil Storage facility, the embedded conduit installation along A-line coil conveyor is new 95% complete. Under ground conduit work at the control room and at manhole #104 la now 95% complete and backfill is in progress. Progress was continued during the period on the underground conduit bank connecting the Green Coil Storage control room to the Hot Strip Mill at colxszn 65* Installation of crane collector rails has been completed in the Green Coil Storage Building except for additional holes being added to the rail splices. In the Pickle line Building, work was continued during the period on installation of conduit brackets for lighting feeders.
7. utilities
7105 - Mater. - Work Order tar llcGraw - Water Treatment Plantt The Water Treatment Plant is new complete and reedy for full operation. During the period, the warm process system was checked out and final balancing of the system is near completion. Minor punch list items are being completed and a formal acceptance by Armeo is now being scheduled. At the River Pump Station, the factory representative for the Delaval pump was at the job site and checked out the pusp opera
tions. This pump is now on stream. The gland seel cooling water filter is not functioning correctly and the fhetesy representative has been notified of this filter condition and will cheek out the filter by next period.
71.09 - P-tTwi^iwea 233 cable yards of backfill was completed during the
period. During the period, progress was continued by Delta Pipeline on installation of gas reducing and metering station piping and equip ment at Xankee Road. Modifications to the valve station at Leffarson Road was also accomplished during the period.
7110 - Power Diartributiont During the period, B. II. Bcnllgy,Xhc.
coupleted installation of manhole #2 fbr the 13.8 X? underground
power line to the Basie Oaygen facility. Progress was continued on
the first section of underground electrical duct work to imnhole #3.
Foundation excavation for tower #14 was completed during the period
and the leveling ped was poured. Seven of the eight towers for this
power line ere now erected. At the cold finishing substation, the
ground met has been completed and the subgrade is being backfilled
up to KLnmtioa 107. Two of the three towers leading to the Mold
Preparation Building are now erected. Progress was continued on the
third tower (tower #22) during the period. Progress was also con
tinued on the underground duct run to the Stripper
rectifier
station.
KEN 003960
I7EFSIX ?mn ACTIOTT EEPOBT Week Siding September 12, 19#7
7111 - Sanitary Severs: 560 cubic yards of backfill was completed during the period for a total to date of 49?862 cubic yards. Delta Pipeline con tinued with installation of manhole covers and concrete tops have been placed for the E and F manholes from #570 through #578 la the Steelmaking Area. Forming for concrete placing has been completed at manholes #557 through #560, #553 and #554 in the south area.
7112 - Drainage -and Site Development* 35,795 cubic yards of excavation '.vas aceaoplished during idle period for a total to dote of 548,938 cable yards. 15,861 cubic yards of backfill was made for a total to date of 838,179 cubic yards. During the period. Delta Pipeline Contractors initiated excavation for storm sewer piping at the southwest comer cf the Basic Ojygon furnace area.
7113 - Trackwcrk? During the period, DIE Corporation laid 723 feet of track and one turnout along the east side of the Hot Strip 11111 near 3-ale Pit #3. 1,056 feet of track was laid north of the Hold Tard. Ballast was placed at the west end of the Stripper Building during the peried. Estimated trackwork at completion is now 171,700 feet* To date 78,720 feet has been installed.
7114 - Locker Socsta* David L. Smith Construction Ccapany continued with progress cf the south area locker roan during the period. Preparations for floor slab and underground drainage installation was continued during the period. Miscellaneous steel erection associated with the locker roast structural was also in progress throughout the period. At the Steelmaking Area, erection of the structural framing for the loctoer has been completed and the contractor is now waiting on delivery of miscellaneous steel. Granular backfill in preparation for the floor slab was initiated during the period. Fabrication of the columns for the locker room building was discovered to be in error by 1 foot too long. Metal Products is taking action in correcting this condition and project engineering is in the process of revising drawings to sheer necessary dianges resulting from this error.
7186 - Lagoon: 14,779 cubic yards of excavation, was accomplished during the period for a total to date of 77,203 cubic yards. 19,757 cubic yards of backfil l was completed for a total to date of 64,334 cubic yards.