Document npNEQxKXqXE3BK8YR9YmZng51
--'N % ?'
P r*031!CTS . . O! V3SJON
RSQPZiST TOR TECHNICAL SERVICE
PAGE 1
APR 12 137?
BUM32R: T&A ^2977
GROUPS
ZONOLITE
BASS:
-
CHARGE NO.:--________ ,__
. REQUESTOR:
V. G. Monroe
KAKETIKG or MflJTOASEUKSEG APPROVAL: HAMS: R. C. Ericson
ii fAPPROVED:
PECBLE4 TITLE:
Run C-ll yield test on Wilders MK-3 bags selected from job site - First National Bank, Louisville, Ky.
SIGNIFICANCE:
Customer, Birdie Plastering, claims they are not getting the 28 bd. ft. yield.
SPECIFIC OBJECTIVE:
Two bags have been shipped to T.R. Wilders Q.C. testing ratio is 2.15/1.0 and target packing weight is 48# . Typical MK-4 mix density is 52.2#/cu.ft. at 23 vicat.
SUGGESTED APPROACH:
DEADLINE (Last day information will be of value):
April 8, 1972
DETAILS OF PROBLEM:
Run std. C-ll test, making sure that mix ratio of bags to be tested is appropriate.
ACCEPTED BY RESEARCH DEPT.
AD
W\J' 1'
DATE:
/ I'll z_
ASSIGNED TO: G. S. Orenstein
ADDITIONAL COPIES: Original to Library, W. R. Payment/T;R.
T. P. Fe'it,
pW*Tv,^.tertMi:L^derj sJ: .
S. N. Mangino/Milwaukeee9
H. C. Duecker , R. Lau3b/L/Louisville, T. Egan/Chicago. R. C. F5-i asoDm
. . n* A" D015945
25204978
REQUEST FOR TECHNICAL SERVICE
Page 2
NUMBER: 42977 GROUP: ZONOLIIE ACTUAL COST: REPORTING DATE: April II, 1972
SUMMARY:
The MONO-BOTE operation on the First National Bank, Louisville, Kentucky was found to he probably within specification with regard to yield but was close to the lower limit of 28 board feet. An improvement in yield and MQNO-KQTS quality was possible by better mixing technique and better air pressure control.
RELEVENT PRIOR TECHNICAL SERVICE: None
CONCLUSIONS: 1. Mixing time recommendations should be lengthened to at least 5 minutes. Six minutes would be even better. Alternatively, the mixer speed could be increased from 32 to 40.RFM and mixing time dropped by a minute to 4 to 5 minutes.
2,. Air pressure should be controlled at the nozzle to 20-25 psi.
3. Water should be held to 12 - 12 l/2 gal. per bag slightly less than what was being used.
DATA AND ANALYSIS: . 1. Pertenant data are presented on the enclosed data sheets.
2. We spent the morning monitoring the existing operation and spent the afternoon attempting to increase yield.
3- The following facts are apparent:
A. The water content could not be exactly established, but from the results of one test run with water measured at 12 gal. per bag it may be concluded that the amount of water being used is greater than 12 gal. per bag.
B. Yield can never be established exactly unless the amount of water being used has been established exactly. Nevertheless, it appears that Berti was getting greater than 28 board feet per bag.
5 015946
25204979
REQUEST FOR TECHNICAL SERVICE
PAGE 3
NUMBER; U2977 GROUP:ZONOLETE
ACTUAL COST: REPORTING LATE: April 11, 1972
C. The MONO-ROTE was not being mixed enough in the mixer. This is evident from the fact that Air-Off nozzle density is less than mixer density.
D. Yield was increased and water was reduced (important for prevention of cracks) by extending the mix time to five minutes. The fact that Air-Off nozzle density was still slightly below mixer densitymeans that a slight bit more mixing could be used to further increase yield.
E. The mixer operater refused to increase the mixer speed because he said that it would then throw the MONO-KDTE into his face. This would have had the same effect as increaseing mixer time.
F. Air pressure was uncontrolled. Air gage showed 35 psi was being used. When the pressure was reduced to 22-24 psi an adequate pattern was maintained. The nozzle-man expressed a preference for the higher air pres sure, but he could not explain why the lower air pressure was no good.
G. It is seen in the data that when the mixer density had been adjusted prop erly (afternoon) an extra 0.6 board feet can be obtained by proper air pressure control
GS0:nmh
G. S. Orenstein
DO 1 5947
25204980
V. ' r\
REQUEST FOR TECHNICAL SERVICE
PAGE 4
NUMBER: 42977 GROUP: ZONOLITE Actual' Cost: REPORTING HATE: April 11, 1972
First National Bank, Louisville, Ky.
Set U|p: Two Thompson A 3*75 pumps on Floor 19 #1 pumping to 33rd floor @ 76 strokes per minute #2 pumping to 32nd floor @ 86 strokes per minute
Mixer: Unknown Breed - Plaster (Muller) type -32 RIM 1 Mixer for two pumps
Vertical Rise 170' to 33rd floor 50' Surge hose
121' Pipe 250 ' 2 1/2" hose + 1 1/2" whip line 1/2" nozzle orifice
Morning Operation : At the Pump
Mixing
Avg Density*
Mix Time Vicat (pcf)
R Comment
Note
1 2:00 2 2:10 3 2:10 4 2:05
5 2:10
25 58.1 25 56.0 36 55.2 19 54.8
14 58.2
2.2-2.3 2.2-2.3 2.3-2.4
2.2-2.3
Water Estimate
2.12 Water Measured
Gal/Bag
11.8 12.4 13.0
R
2.1 2.2 2.3
t o w >
Samule
Pressure
35 psi 35 35 23
Morning Operation : At the Nozzle
Air Off
Vicat
4 3
-feg*)-
53.2 54.0
Air On
Density*
Vicat
(pcf)
1 64.4 3 58.9? 3
Density**
(pcf)
Yield**
66.0
64.5
64.5 65.1
27.3-28.2 28.0-28.9 28.0-28.9 27.7-28.6
Avg. 28.2
Estimated Dry
Density
23.1-22.4 22.6-21.9 22.6-21.9 22.8-22.1
Based upon 5 02. cup measurement yy
Based upon 10 qt. pail measurement
Note: Yield range is for R range of 2.2-2.3 ditto for estimated dry density
D015948
25204981
'I
REQUEST FOR TECHNICAL SERVICE
PAGE 5
^977_____________________ GROUP; ZONOLITS ACTUAL COST: REPORTING BATE: April 11, 1972
AFTERNOON OPERATION : At the Pump
Mixing Mix `i'irno
1 4:00 2 4:00 3 4:00 4 4:00 5 5:00 6 4:00 7 5:00 8 5:00
Avg. Vicat
18 20 16
17 26 26 20 21
Density* (per)
53.5 56.0 54.0 54.6 55.2 54.2 51.7 51.3
. _R_
2.2-2.3 2.2-2.3 2,2-2.3 2.2-2.3 2.2-2.3 2.2-2.3
J2.1-2.2 1
2.1-2.2
Comment Water
was Estimated
Assumed Conditions "" ror tne Nozzle
Measurements Below.
Sample
A B C D
Air Pressure
35 22 35 22
Density* Vicat (pcf)
10 50.6 6 52.7 8 51.0 6 51.9
Vicat
1 2 3 2
Density* Density**
(pcf)
(pcf)
61.0 60.2 60.6
58.9
61.8 60.6 61.8 60.6
Yield**
Estimated Dry
Density
28.3-29.2 28.9-29.8 28.3-29.2 28.9-29.8
22.3-21.6 21.9-21.2 22.3-21.6 21.9-21.2
Based upon 5 oz cup measurement **
Based upon 10 qt. pail measurement
Note: Yield range is for Rrange of 2.1-2.2
Results of C-ll Test, at Travelers Rest
R - 2.19 (12.3 gal/bag)
Mixer
Mix - 3 minutes Vicat - 25 mm Density - 49.2 pcf
Nozzle
Pressure - 12 psi Vicat - 4 mm Density - 60.0 pcf
Yield: 29.99 bd. ft./47# bag
D015949
25204982