Document npNEQxKXqXE3BK8YR9YmZng51

--'N % ?' P r*031!CTS . . O! V3SJON RSQPZiST TOR TECHNICAL SERVICE PAGE 1 APR 12 137? BUM32R: T&A ^2977 GROUPS ZONOLITE BASS: - CHARGE NO.:--________ ,__ . REQUESTOR: V. G. Monroe KAKETIKG or MflJTOASEUKSEG APPROVAL: HAMS: R. C. Ericson ii fAPPROVED: PECBLE4 TITLE: Run C-ll yield test on Wilders MK-3 bags selected from job site - First National Bank, Louisville, Ky. SIGNIFICANCE: Customer, Birdie Plastering, claims they are not getting the 28 bd. ft. yield. SPECIFIC OBJECTIVE: Two bags have been shipped to T.R. Wilders Q.C. testing ratio is 2.15/1.0 and target packing weight is 48# . Typical MK-4 mix density is 52.2#/cu.ft. at 23 vicat. SUGGESTED APPROACH: DEADLINE (Last day information will be of value): April 8, 1972 DETAILS OF PROBLEM: Run std. C-ll test, making sure that mix ratio of bags to be tested is appropriate. ACCEPTED BY RESEARCH DEPT. AD W\J' 1' DATE: / I'll z_ ASSIGNED TO: G. S. Orenstein ADDITIONAL COPIES: Original to Library, W. R. Payment/T;R. T. P. Fe'it, pW*Tv,^.tertMi:L^derj sJ: . S. N. Mangino/Milwaukeee9 H. C. Duecker , R. Lau3b/L/Louisville, T. Egan/Chicago. R. C. F5-i asoDm . . n* A" D015945 25204978 REQUEST FOR TECHNICAL SERVICE Page 2 NUMBER: 42977 GROUP: ZONOLIIE ACTUAL COST: REPORTING DATE: April II, 1972 SUMMARY: The MONO-BOTE operation on the First National Bank, Louisville, Kentucky was found to he probably within specification with regard to yield but was close to the lower limit of 28 board feet. An improvement in yield and MQNO-KQTS quality was possible by better mixing technique and better air pressure control. RELEVENT PRIOR TECHNICAL SERVICE: None CONCLUSIONS: 1. Mixing time recommendations should be lengthened to at least 5 minutes. Six minutes would be even better. Alternatively, the mixer speed could be increased from 32 to 40.RFM and mixing time dropped by a minute to 4 to 5 minutes. 2,. Air pressure should be controlled at the nozzle to 20-25 psi. 3. Water should be held to 12 - 12 l/2 gal. per bag slightly less than what was being used. DATA AND ANALYSIS: . 1. Pertenant data are presented on the enclosed data sheets. 2. We spent the morning monitoring the existing operation and spent the afternoon attempting to increase yield. 3- The following facts are apparent: A. The water content could not be exactly established, but from the results of one test run with water measured at 12 gal. per bag it may be concluded that the amount of water being used is greater than 12 gal. per bag. B. Yield can never be established exactly unless the amount of water being used has been established exactly. Nevertheless, it appears that Berti was getting greater than 28 board feet per bag. 5 015946 25204979 REQUEST FOR TECHNICAL SERVICE PAGE 3 NUMBER; U2977 GROUP:ZONOLETE ACTUAL COST: REPORTING LATE: April 11, 1972 C. The MONO-ROTE was not being mixed enough in the mixer. This is evident from the fact that Air-Off nozzle density is less than mixer density. D. Yield was increased and water was reduced (important for prevention of cracks) by extending the mix time to five minutes. The fact that Air-Off nozzle density was still slightly below mixer densitymeans that a slight bit more mixing could be used to further increase yield. E. The mixer operater refused to increase the mixer speed because he said that it would then throw the MONO-KDTE into his face. This would have had the same effect as increaseing mixer time. F. Air pressure was uncontrolled. Air gage showed 35 psi was being used. When the pressure was reduced to 22-24 psi an adequate pattern was maintained. The nozzle-man expressed a preference for the higher air pres sure, but he could not explain why the lower air pressure was no good. G. It is seen in the data that when the mixer density had been adjusted prop erly (afternoon) an extra 0.6 board feet can be obtained by proper air pressure control GS0:nmh G. S. Orenstein DO 1 5947 25204980 V. ' r\ REQUEST FOR TECHNICAL SERVICE PAGE 4 NUMBER: 42977 GROUP: ZONOLITE Actual' Cost: REPORTING HATE: April 11, 1972 First National Bank, Louisville, Ky. Set U|p: Two Thompson A 3*75 pumps on Floor 19 #1 pumping to 33rd floor @ 76 strokes per minute #2 pumping to 32nd floor @ 86 strokes per minute Mixer: Unknown Breed - Plaster (Muller) type -32 RIM 1 Mixer for two pumps Vertical Rise 170' to 33rd floor 50' Surge hose 121' Pipe 250 ' 2 1/2" hose + 1 1/2" whip line 1/2" nozzle orifice Morning Operation : At the Pump Mixing Avg Density* Mix Time Vicat (pcf) R Comment Note 1 2:00 2 2:10 3 2:10 4 2:05 5 2:10 25 58.1 25 56.0 36 55.2 19 54.8 14 58.2 2.2-2.3 2.2-2.3 2.3-2.4 2.2-2.3 Water Estimate 2.12 Water Measured Gal/Bag 11.8 12.4 13.0 R 2.1 2.2 2.3 t o w > Samule Pressure 35 psi 35 35 23 Morning Operation : At the Nozzle Air Off Vicat 4 3 -feg*)- 53.2 54.0 Air On Density* Vicat (pcf) 1 64.4 3 58.9? 3 Density** (pcf) Yield** 66.0 64.5 64.5 65.1 27.3-28.2 28.0-28.9 28.0-28.9 27.7-28.6 Avg. 28.2 Estimated Dry Density 23.1-22.4 22.6-21.9 22.6-21.9 22.8-22.1 Based upon 5 02. cup measurement yy Based upon 10 qt. pail measurement Note: Yield range is for R range of 2.2-2.3 ditto for estimated dry density D015948 25204981 'I REQUEST FOR TECHNICAL SERVICE PAGE 5 ^977_____________________ GROUP; ZONOLITS ACTUAL COST: REPORTING BATE: April 11, 1972 AFTERNOON OPERATION : At the Pump Mixing Mix `i'irno 1 4:00 2 4:00 3 4:00 4 4:00 5 5:00 6 4:00 7 5:00 8 5:00 Avg. Vicat 18 20 16 17 26 26 20 21 Density* (per) 53.5 56.0 54.0 54.6 55.2 54.2 51.7 51.3 . _R_ 2.2-2.3 2.2-2.3 2,2-2.3 2.2-2.3 2.2-2.3 2.2-2.3 J2.1-2.2 1 2.1-2.2 Comment Water was Estimated Assumed Conditions "" ror tne Nozzle Measurements Below. Sample A B C D Air Pressure 35 22 35 22 Density* Vicat (pcf) 10 50.6 6 52.7 8 51.0 6 51.9 Vicat 1 2 3 2 Density* Density** (pcf) (pcf) 61.0 60.2 60.6 58.9 61.8 60.6 61.8 60.6 Yield** Estimated Dry Density 28.3-29.2 28.9-29.8 28.3-29.2 28.9-29.8 22.3-21.6 21.9-21.2 22.3-21.6 21.9-21.2 Based upon 5 oz cup measurement ** Based upon 10 qt. pail measurement Note: Yield range is for Rrange of 2.1-2.2 Results of C-ll Test, at Travelers Rest R - 2.19 (12.3 gal/bag) Mixer Mix - 3 minutes Vicat - 25 mm Density - 49.2 pcf Nozzle Pressure - 12 psi Vicat - 4 mm Density - 60.0 pcf Yield: 29.99 bd. ft./47# bag D015949 25204982