Document npEb4Jmv173gKKrmZ0VK6ZEKw
BRANCHES DSPftRTKEH? - PLftMT BElOIfrnGKS j August 19, 1560
h99U Mew Hyda Park, L. I., H. Y. #>illl - Hew Branch Installation Expense
^ 3,51*11.26
5085 Oklahoma City, Okla. #61*91* - Branch Move Expense
1*,118.65
5130 Warren, Ohio #LlJih - Branch Move Expense
3,652.80
5135 SL Centro, Calif. #851*5 - Branch Moro Expense 5136 Hew York, W. I, #1*005 - 1 Taultehte Safe 5159 Columbus, Ga. #2052 - Hew Branch Installation Expense, incl, special sign
3,961.25 200.00
---- 6,168.21
5173 Baltimore, Kd. #510? - 1 fecial sign, ind, installation, electrical work, '
and cost of master mold for plexiglas faces
3,166.00
517U Atlanta, Ga. #2302 - 1 fecial sign, erection, rotating mechanism, electrical work 2,71*9.00
5lB2 Providence,' R. I. $051 - Branch !tove Expense
!* ,937.65
5187 Hew Orleans, La. #7320 - 1 new i960 Ford --ton truck, less disc., olus lettering;
2,137.01*
5LB8 Baton Rouge, La. #7303 - 3 new tires for delivery truck, truck repairs
78.01
5189 Miami, Fla. #2053 - New Branch Installation Expense
6,101,78
5190 Aurora, Iil. #3182 - Paint exterior store front
80.00
5191 Bay City,. Tex. #7721 - Paint exterior of Branch, overrun
1*5.00
5192 Lexington, Mass. #1**16 - Paint ceiling (l coat)
72.C0
5193 Baton Rouge, La. #7303 - Paint exterior feont and 1 side, paint ceiling and interior
t ^sGLXo 5191* Monroe, Wise. #3068 - 1 20" G. E. Ean
566.00 29.88
5195 Bisaarek, N. D. #3665 - 1 Modal 1M-A 17" Westinghousa Fan 5396 Lubbock, Tex. #71*1*9 - Repairs to delivery truck
61.15 78.86
5397 Crawford sville, Ind. #31)16 - 1 #30 1-gal. paint conditioner, 1 Colcrneter Table
205.50
5198 Henderson, Xy. #3229 - 1 KK-52 Electric stick-out sign, sign erection, repair and
paint facia sign
385.00
5199 Beaumont, Tex. #7713 - 2 tires and tubes for Branch truck 5200 Savannah, Ca. #2399 - Repairs to delivery truck
51.06
51*.55
5201 Stamford, Conn. #1*0?5 - 1 #30 1-gal. paint conditioner with pedestal hase
31*0.70
5202 Bhion, N. J. #1*988 - 1 tdjne clock
23.62
5203 Millville, K. J. #5757 - Remodeling,Expense
3,970.60
520U Kenosha, Wise. #381*1* - 1 Arrow inclined belt conveyor w/gravit feeder, etc,, 3
10' x 18" gravity wheel conveyor, 3 adjustable stands, installation
1,361* .03
5205 Coatosville, Pa. #5563 - Cost of replacing ceiling in sales area that pulled loose
when lighting fixtures dropped to floor, rehanging fixtures
301.00
5206 Poconoke City, Kd. #5011 - Brandi Move Expense - cost of lowering ceiling
550.00
5207 Whittier, Calif. #8oiil - Mew branch installation Expense -
"'5,71*8.01*
5209 Canton, 0. #1109 - 10 sec. 18" x 36" x 783* steel shelving
H10.00
5210 St. Augustine, Fla. #2361* - 2 chrome chairs
19.00
52H Atlanta, Ga. #23l*3 - Repairs to delivery truck 5212 Kaehington, D. C. #5870 -j Emergency repairs to freight elevator
51.05
5l*.oo
5213 Flint, Mich. #1828 - li units mi steel shelving, 20 7'3" steel posts 5211* Wilmington, Bela. #5867 - 1 Biebold Safe .
78.1*0 200.00
5215 Leesburg, Fla. #2031 - Repairs to air conditioner
52.19
5216 Belleville, N. J. #1(113 - Hew Branch Installation Expense
- __ I*,598,73
5217 Hew Orleans, la. #7375 - 1 MK-52 stick-out sign, sign erection .
393.00
5238 Beekddll, N. Y. #1*031* - 1 2l*B signal fan 5219 Oebkojts, Wise. #3183 - 1 peed #30 paint conditioner, 1 pedestal hase v/feet- '
95.00 l*6.2a
5220 Seymour, Ind. #3762 - 1 16^*' O. E. oeciHating fan
1*7.50-
5221 Queen's Tillage, N. I. #1*175 - Emergency repairs to elevator
215.25
5222 Stoneham, Mass. #1*009 -1 AT-210 ELactasr Barrel Ptuap
5223 Crawfordsville, Ind. #311*6 - 1 electric fan
21.1*0
1U.88
522k Woodstock, 111. #3002 - 2 display tables
150.00
522? LaMirada, Calif. #8027 - Replacing snail letters on facia sign with larger letters
and adding emblem, 1 Plexiglas 1*2" emblem, letters and labor
367.63
5226 Savannah, Ga. #2399 - Repairs to air conditioner
267.00
0007-SWP-000025928A
beas c hs s
- h as t rggpiPigicss
August, 19, I960
(Continued - Page 2)
5227 Porterville, CA if. #8035 - 1 display table, 1 set glass, 12 shelves only
1H.52
5228 Seattle, Wash, #8607 - Installation of intercom system
162,1?
?229 1-B.meaoolis, Minn. #307? - New Branch Installation Expense
rr--" U, 769.91
230 Branches Dept, - 95 units wall Kelvin?, 80 units studio shelving, U5 display tables,
13 wrapping counters, 10 office counters, 50 Cclormeter tables, 100 Burroughs
adding machines
3h,629,50
5231 lias Vegas, Nev. #8977 ~ Repaire to cooling unit
53*18
5232 Holyoke, Mass. #lt06l - li chrome chairs
37,60
5233 Durham, N. C. #5272 - Paint interior walls and ceil'ng
100.00
523li Decatur, -da. #2329 - Paint ceiling, walls and fixtures
365.00
5235 Baltimore, '.'A. #$086 - 1 L-21 PsngaKo Time Clock
23.62
825 Twin Falls, Ida. #8555 - 1 2i gal. foas.-fire extinguisher
22,60
IOTA1,,..
$101,118 a 35
0007-SWP-000025928B T
0007-SWP-000110661