Document np734zoOkwxD6nKpw45pVzOd1

D COPYr i n a ? Vy * ; \J i tlii / Sub-Contract No. 7l6-2l83 January 28, 1969 This Sub-Contract is made pursuant to a Contract between Armco Steel Corporation (hereinafter called "Owner"), and Kaiser "Engineers, Inc. (hereinafter called "Contractor"), Agent for Armco Steel Corporation whereby Contractor agreed with Owner to furnish engineering, con struction and other services relating to the Expansion and Modern ization Program at Owner's Middletown Wbrks - Middletown, Ohio. Contractor and CWENS-CORNING FI32RGLAS CORPORATION (he re inafter called "Sub-Contractor") hereby agree that the following work shall be per formed ty Sub-Contractor for the compensation and upon the terms and conditions hereinafter set forth on Face Sheets A,B & C of-the SubContract and including Articles 1 through 37 of the General Terms and Conditions attached and made a part of this Sub-Contract. WORK TO BE PERFORMED: Furnish all labor. Supervision, Material, Supplies, Transportation, Tools, Services, Equipment and Rigging, and do all things necessary to furnish and install thermal in sulation on all steam piping, condensate piping, oil piping, and flash tanks for Nos. k and 5 Continuous Strip Pickle Lines, at Corner's Middletotn, Ohio Works,* all in strict accordance with, or to be in ferred from, Exhibit "A"; all such work being hereinafter sometimes called "The Work: PLANS, DRAWINGS AND SPECIFICATIONS: As per list attached marked Exhibit A and ty this reference made a part hereof. ITEMS TO BE SUPPLIED W CONTRACTOR:. As per list attached marked Ebchibit B and ty this reference'made a part hereof. LOCATION OF WORK: Armco Steel Corporation - Middletown, Chio. WORK ID COMMENCE: As of the date of this ebb-Contract, with field work to commence on date specified in Contractor's Notice to Proceed to be issued to Sub-Contractor. WORK ID BE COMPLETED; Time is of the essence of this Sub-Contract, and all work shall be completed by Sub-Contractor as soon as due diligence and good practice will permit, but in no event later than May 1, 1969, . or such extended completion date as may be applicable in accordance with and pursuant to the provisions of Article 15 of the General Terms and Conditions hereof. EACE SHEET "A" KEN 007077 BOND: Not required. COMIENSATION: Sub-Contractor agrees to perform The Work for the following compensation which includes all present and future. Federal, Local, Excise and Transportation Taxes, and all other taxes pertaining to the" transaction, except the Chio Sales and Use Tax applicable under the following circumstances: Any Chio Sales and 16e Tax liability on personal property transferred-under the Sub-Gontract by the Sub-Contractor to Owner, will be accounted for by Owner under its Direct-Pay ment Permit No. l6l-M. Any Chio Sales and Use Thx lia bility for materials transferred to Owner as improvements to Owner's real property will be determined by Sub-Con tractor in co-operation with Owner; such tax is Sub-Con tractor's direct responsibility, but Owner will reimburse Sub-Contractor over and above the price stated below for the amount of such tax. ' Lump sum amount......... ..$121.ijOO.00 UNIT IRICE FOR ADDITION AND/OR DELETION: Service Steam and Condensate Steam and Condensate Steam and Condensate Steam and Condensate Steam and Condensate Steam and Condensate Steam and Condensate Steam and Condensate Steam and 'Tondensate Steam and Condensate Steam and Condensate Steam and Condensate Steam and Condensate Pipe Size k ya 1 ik ik 2 2s 3 h 6 8 10 12 Thickness VS Vs UhitlPrice layers Iinl;Ft. Single $3.15 ti 3.20 Notes lk it 3.25 Ik u 3.35 lk It 3-itD 2 u U.10 2 II a. 2$ 2 n a. 35 2s Double 7.60 2s II 10.00 3 n 12.50 3 n 15.00 3 11 17.50 FACE SIEET "B KEN 007078 Steam and Condensate Steam and Condensate 12 Ik h Double 18.5b 3 n 20.00 Oil _ b & 3/U 1 ffi.ngle 2.60 Oil 1 & lk 1 It 2.70 Oil lb 1 tt 2.80 Oil 2 1 ft 2.90 Oil 3 1 ft 3.10 Oil h1 It 3.65 - Flash Thnks Desuper Htr. & Blow Down Tanks * 1 *' . Oil Heaters Oil Mix Tank - lb tt 385.00 ea. 16 Req'd % Double 10.95/ Approx. U90 Sq.Ft. Sq. Fb. 1 * 1 Single 7^55/ Approx. 105 Sq.Ft. Sq. Ft. lb n 7.75/' Approx. 195 Sq.Ft. Sq. Ft. ADERESSES: Owens-Corning Fiber'gLas Corporation 298? Exon Drive Cincinnati, Ohio U52lil Kaiser Engineers, Inc., Agent For Aimco Steel Corporation P. 0. Box F Middletown, Ohio LIQUIDATED DUMMIES: Hone. Article 31 of the General Tferms and Con ditions hereof is inapplicable and is hereby deleted. ADDITIOHAL EXHIBITS: The fecial Provisions attached as Exhibit "C", and the Standard Conditions attached as Exhibit "D", are by this reference made a part hereof. IN WITNESS WHEREOF, the parties have made and executed this Sub-Contract as of the day and year first hereinabove written. Owens-Corning Fiberglas (Sbb - Qbrxtractor) " By OruJ { tUL Title C & I Insul. Manager FACE SHEET KEN 007079 EXHIBIT "A" FLANS, DRAWINGS AND SPECIFICATIONS 1. SPBCIFICAHONs Standard Specification lb. ACS-i*00-35 Piping and equipment insulation.- 2. DRAWINGS: SERVICE PIPING 6i*8ll*7 Rl* 61*8169 R3 61*8170 R5 61*8171 Rl* 61*8172 HO 9-6-68 9-20-68 9-20-68 9-20-68 1*- 3-68 EESUPER HEATER 61*8167 R3 61*8168 R2 61*81*82 R2 . 8 -20-68 ' 9-9-68 7-3-68 NO. 1* LINE SECTIONS: 6l*8ll*0 R5 61*8 ll*? R3 61*81*71* R3 61*81*76 R3 61*81*79 R2 61*81*81 R2 8-15-68 6-28-68 7-3-67 8-12-68 8-26-68 9-6-68" NO. 1* LINE PLANS 61*8130 Rl* 61*8132 Rl* 6I1813I1 Rl* 61*8136 ?h 8-28-68 6-27-68 8-20-68 9-6-63 NO. 5 IINE PLANS 655232 Rl* 655231* R3 655236 R2 8-28-68 8-9-68 7-3-68 NO. 5 LINE SECTIONS 655239 R2 65521*1 R3 655272 PD 655271* in. 65551*2 I?5 6553*6 RO 8-9-68 8-9-68 U-3-68 6-20-68 8-12-68 1*--2--68 61*81*70 R3 61*81*71 Rl* 61*81*72 Rl 61*31*73 Rl* 655255 Rl 9-20-68 9-20-68 U-3-68 8-7-68 8-23-68 61*811*1 Rl* 61*811*9 R3 61*81*75 Rl* 61*81*77 Rl 61*81*80 KL 8-28-68 9-6-68 8-9-68 U-30-66 7-3-68 61*8131 R5 8-28-63 61*8133 Rl* 8-9-68 61*3135 R2 5-22-68 655233 Rl* 655235 R2 655237 Rl* 6-28 -63 5-27-68 . 3-27-68 65521*0 R3 655271 R2 655273 R2 65551a RL 65551*3 R2 65551*7 R3 8-9-68 8-9-68 8-12-68 7-3-6S 9-9-63 8-26-68 KEN 007080 Exhibit "A", continued FLASH TANKS " 6U8U3? R3 OIL FEFING 6U8ll;8 RQ 6U8U83 RD ' 6U8U8? EL -2- 8-6-68 7-17-68 9-9-68 8-9-68 6i|8lL R3 6U8180 RD 6U8U8U RO 8-6-68 7-17-68 7-17-68 j ken 007081 EXHIBIT "B" ITEMS TO 3S SUPPLIED BY CONTRACTOR 1. Potable water at area or areas designated ty (contractor. 2. Sanitary facilities at points designated by Contractor. 3. Nhter required for the work at points designated by Contractor. I 1*. Electrical power, UUO Volt, 3 phase and 310 vdlt, single phase at points designated by Contractor. KEN 007082 EXHIBIT "C" SPECIAL HOVESCONS 1. It is mutually understood and agreed that Contractor and other Sub-Contractors, will be working in the areas involved in this work and that these.areas will be congested. In this connection, storage space adjacent to the work site will be limited and such storage must be closely co-ordinated with Contractor. 2. It is mutually understood and agreed that Sub-Contractor will provide all required off-loading, handling, hoisting, material and equipment protection, to include weather protection for material in outside storage, rigging, scaffolding, picks, ladders, and all other equipment necessary for the proper in stallation of the work. 3. It is mutually understood and agreed that Section lit, "Use of Armco Materials" of Exhibit "D" is hereby modified by the addition of the following sentence at the end of the paragraph - "All other steel products used must be manufactured in the United States". h. It is mutually understood and agreed that measurement for payment will be per lineal Foot for pipe insulation, weather-proofing, and anti-sweat protection and per square foot for insulation on equipment and vessels and for metal jacketing, complete and inplace, in accordance with the specifications and drawings. Linear measurements will be made along the center line of straight runs and over the insulation outside.of all bends, all will include all insulated valves, flanges, tees, ells, and other fittings, fetal jacketing will be measured per square foot, in place, without allowance for laps. The area of pipe jacketing will be the product of the measured circumference of the finished jacketing and the Linear measurement thereof, taken as above. Measurements of area will be made over the outside of the insulation on vessels and equipment and will exclude all uninsulated areas in excess of one square foot. In addition to the Linear measurements above, the following table of equivalence for insulated fittings and valves will be allowed: Each pair of flanges - 3* Ehch mitered EU-exclusive of flanges- 2* Reformed Ells shall be used, where practicable. Each Tee-exclusive of flanges - 2* Each cross-exclusive of flanges - 2' Each valve-exclusive of flanges - 2* KEN 007083 Exhibit "O', continued -2- Each valve bonnet - 3* Bends exceeding radius of long radius Ell - 1.5 Times the Linear neasurement I t i i KEN 007084 Cl... <y\ DEVIATIONS FROM OR ADDITIONS TO SUB-CONTRACT AND SPECIFICATIONS y .. Sub-Contract No. 7156-2183 dated 1-28-69 Change Order No. _______5 Subject: Pipe InsulationDate of Change 1-26-70 Location: Armco Steel Corporation Middletown, Ohio Sub-Contractor Owens-Coming Fiberglas Corporation .2987 Exon Drive____________ Cincinnati, Ohio 45241 DESCRIPTION OF CHANGE: Pursuant to the provisions of Article 8 of the General Terms and Conditions, Sub-Contractor shall perform The Work in accordance with the following changes: 1) Furnish all labor, material, and equipment necessary to insulate twelve (12) electric heat traced water valves located at the cold mill waste area. EWO 1. Acct. 7182-735-405*51 .............................................. $ 814*15 2) Furnish all labor, material, and equipment and apply a one (l)inch thick anti-sweat pipe covering to well water system located at the Annealing line as directed by Contractor. EWo 2. Acct. No.7164-705-410.51 ........................................................................ 969*00 Total increase $1^783.15, CHANGE IN COMPENSATION: Total lump sumamount increased from: 8 157.078.09___________ to 8 158.86l.2k CHANGE IN COMPLETION DATE None' Except as herein expressly modified, said Sub-Contract as heretofore amended and all the Terms and Conditions thereof shall remain unaltered and in full force and effect and shall apply to all The Work performed hereunder. ACCEPTED: AUTHORIZED: Owens-Coming Fiberglas Corporation (Sub-Contractor) gy. /s/ Paul C. Gahn Title Contr. Supv. Kaiser Engineers, Inc., Agent For Armco Steel Corporation (Contractor) By /s/ Vem L. Frankson Title Manager- Procurement EOP:jp KEN 007085 4jU DEVIATIONS FROM OR ADDITIONS TO SUB-CONTRACT AND SJECIFICATXONi Sub-Contract No. 7156-2183 (fated 1-28-69 ' .. Changd'-Order No.-' 3. Subject: Pine InsulationIkte of Change: Location: Armco Steel Corporation - Middletown, Ohio 9-26-69 &b- Contractor _________Owens-Coming Fiberglas Corporation 2927 Exon Drive Cincinnati. Ohio A524L; DESCRIPTION OF CHANGE: Pursuant to the provisions of Article 8 of the General Terms and Conditions, Sub-Cbntractor shall perform The Work in accordance with the following changes: Install thermal' insulation and weather proofing on steam, condensate, electric traced MWo and water lines in Pollution abatement facility. DWGS. 679097 R5, 670900 R3, 679100 R5, 679101 R5, 679102 R5, 679105 Rl, 679109 R2, 679160 Rl, 665764 R4.......................... 22,100.02 Acct. 7182-735-405.51 Reference: Sub-Contractor's letter dated 8-12-69* CHANGE IN C0MH3NSATI0N: Total 1 mm sum amount increased from: $ 130.078.09 To $ 152.178^09 CHANGE IN COMPLETION DATE: None Except as herein expressly modified, said Sub-Contract as heretofore amended and all the Terms and Conditions thereof shall remain unaltered and in full force and effect and shall apply to all Tie Work performed hereunder. ACCEPTED: Owens-Coming Fiberglas Corp. (Sub-C cntrac tor) /s/ Paul ---------- :-------- Title Ind. & Comm. Dept. Supv. AUTHORIZED: Kaiser Engineers, Inc., Agent Fbr Armco Steel Cbrporation (Contractor) By /s/ Vem L. Frankson Title Manager - Procurement E0P:jp KEN 007086 c/1 IEVTATIONS FROM OR ADDITIDNS TO SUB-CONTRACT AND SH2CIFICA TIONS 'D C'OA Sib-Contract No. 7156-2183 _dated 1-28-69 ' .. Changd' Order N4 . r Subject: Pipe insulation Date of Change: 10-1 Location: Armco Steel Corporation - Middletown, Ohio Sub-Contractor Owens-Coming Fiberglas Corporation 2987 Exon Drive Cincinnati. Ohio 4.5241 DESCRIPTION OF CHAN: Pursuant to the provisions of Article 8 of the General Terms and Conditions, Sub-Cbntractor shall perform The Work in accordance with the following changes: Furnish and ifistall insulation on steam and condensate lines at the Annealing Line Facilities. Drawing Nos. 676442, 676443* 676444* 676445, 676457, 676458, 676459, 676460, 676464, and 676465. Acct. No. 7164-704-420.51........................................................................ -*k2222 Reference: Sub-Contractor's letter dated 9-10-69. CHANGE IN. COMPENSATION: Total lump sum $ 152,178,09 To $ 157,078.0$ amount increased from: . CHANGE IN COMPLETION EATE: None Except* as herein expressly modified, said Sub-Contract as heretofore amended and all the Terms and Conditions thereof shall remain unaltered and in full force and effect and shall apply to all The Vbrk performed hereunder. ACCEPTED: Owens-Coming Fiberglas, Com^ (Sub-C cntractor) Sy fa/ Paul .a.. Gahn______ :------------- Title nnmmfvrvH ai & Ind. Dept., Supv. AUTHORIZED: Kaiser Engineers, Inc., Agent For Armco Steel Corporation (Contractor ) 8y /s / Vem L. Frankson______ Title Manager - Promirement EOPsjp 007087 Owens-Corning '[I] CO No. 2 1. Insulate the following steam and condensate lines at the desuperheater station: 31 Lin. Ft. - 12" x 3i" double layer pipe covering $18.50 Lin. Ft................................................................................................. $ 573-50 7 LLn. Ft. - 8" x 3" double layer pipe covering $12.50 Lin. Ft.................................................................................................. 87-50 21 Lin. Ft. - !" x !" single layer pipe covering $3-40 Lin. Ft.................................................................................................. 71-40 60. Lin. Ft. 1" x li" single layer pipe covering $3-25 Lin. Ft.................................................................................................... Acct. 7159-706-465.51 195-00 2. Insulate the following electrical traced water lines at the pollution abatement building: 28 Lin. Ft. - 10" x 1" fiberglas pipe covering $7.40 Lin. Ft..................................................... 207-20 15 Lin. Ft. - 8" x 1" fiberglas pipe covering $6.05 Lin. Ft......... .......................................................................................... 90.75 15 Lin. Ft. - 6" x 1" fiberglas pipe covering $4.70 Lin. Ft................................................................. 70-50 l6l Lin. Ft. 4" x 1" fiberglas pipe covering $3.65 Lin. Ft. .................................................................................................. 587-65 186 Lin. Ft. - 2" x 1" fiberglas pipe covering $2.90 Lin. Ft........................ 539.40 116 Lin. Ft. - l" x 1" fiberglas pipe covering $2.80 Lin. Ft.................................................................................................... 324.80 27 Lin. Ft. - 1" x 1" fiberglas pipe covering $2.70 Lin. Ft................................ Acct. 7186-711-410.51 72.90 3. Insulate .the. following steam lines from main header to individual heating units at. pollution abatement building: 39 Lin. Ft. - 3" x 2" single layer pipe covering $4.35 Lin. Ft......................................................................................................169.65 KEN 007088 'iJULUEt - ^>/CQo, IEVIATIONS FROM OR ADDITIONS TO SUB-CONTRACT AND SffiCIFICATIONS Sub-Contract No. 7156-2183dated 1-28-69 .> Change Order Nov* 2. Subject: Pipe insulationEhte of Change: Location: Armco Steel Corporation - Middletown, Ohio 9-9-69 Sub-Contractor Owens-Coming Fiberglas Corporation 2987 Exon Drive Cincinnati, Ohio 4.5241 DESCRIPTION OF CHANCE: Pursuant to the provisions of Article 6 of the General Terms and Conditions, Sub-Cbntractor shall perform The Work in accordance with the following changes: [Please see attachment for description of change] Total amount of change $7t596.68_ CHANGE IN COMffiNSATION: Total / lump sumamount increased from: $ 122.LB1.LI To $ 180,078.09 CHANGE IN COMPLETION DATE: None Except as herein expressly modified, said Sub-Contract as heretofore'amended and all the Terms and Conditions thereof shall remain unaltered and in full force and effect and shall apply to all The Nbrk performed hereunder. ACCEPTED: Owens-Coming Fiberglas Corporation (Sub-Ccntractor) 9y f J Pul C. Gahn - __ __ Title Suov- Commercial & Indus. AUTHORIZED: Kaiser Engineers, 3hc., Agent Fbr Armco Steel Cbrporation (Contractorj By ^3 f Vem L- Frankson Title Manager - Procurement EOPsjp * KEN 007089 Owens-Coming [21 Change Order No. 2 Item 3 continued ... 59 Lin. Ft. - 2" x 2" single layer pipe covering. $4.10 Lin. Ft..........................................................................'...................... $ 241.90 231 Lin. Ft. - 1" x lr" single layer pipe covering $3.25 Lin. Ft.................................................................................................. 750.75 234 Lin. Ft. - 3/4" x 1%" single layer pipe covering $3.20 Lin. Ft......................................................................................... 74S.80 Acct. No. 7186-706-420.51 4. Repairs to insulation on steam condensate and oil lines on No. 4 & 5 Pickle Lines, due to revisions in design and rework...................... $ 3,244-98 Acct. 7159-706-894.51 5. Substitute 654 Lin. Ft. of 4" x 2k" thick single layer pipe covering for specified double layer pipe covering................($380.00) Acct. 7159-706-465.51 Total increase this change $7^596.68 ken 007090 DEVIATIONS FROM OR ADDITIONS TO SUB-CONTRACT AND SPECIFICATIONS Sub-Contract No.. 7156-2183 dated 1-28-69 . Change Order No. Subject: Pipe Insulation Date of Change 5-13-69 1 Location: Armco Steel Corporation Middletown, Ohio________________ ' .Sub-ContractorOwens-Corning Flberal'as Corporation 2987 Exon Drive ......................................_ ___________'Cincinnati, Ohio 45241________________ ' ______________ DESCRIPTION OP CHANGE: Pursuant to the provisions of Article 8 of the General Terms and Conditions, Sub-Contractor shall perform The Work in accordance with the following changes: `AUTHORIZED PREMIUM TIME FOR WORK PERFORMED ON 4-5-691 4-9-69, 4-10-69 and 4-12-69..........................................................$1,081.41 ' Acct. 7156-706-465.51 CHANGE IN COMPENSATION: Total i,,mp _________ amount increased, from: $ 121.400.00______________ to $ 122.481.41 1 CHANGE IN COMPLETION DATE None Except as herein expressly modified, said Sub-Contract as heretofore amended and all the Terms and Conditions thereof shall.remain unaltered and in full force and effect and shall apply to all The Work' performed hereunder. ACCEPTED: AUTHORIZED: Owens-Corning Fiberglas Corp. (Sub-Contractor) Dy @-/71 ^ - Kaiser Engineers, Inc,, Agent For Armco Steel Corporation ' [Contractpr)^,^ Title Mgr, I & C Dept._________ Title 'Procurement EOP:jp KEN 007091