Document np5q1N5djMbQR0p4ZJ6a212VX

fcEPROOUCEU AT THE NATIONAL ARCHIVES Trade Name: Category: Color: CJuality: Elliott's Implement : Tractor Enamel Enamel Bed First Pigment: 19.8p Para Toner Deep, #533-11 Chrome Orange Deeo, #8110 Red Oxide #505 . Georgia Whiting Lb. V2% 12h 30 50 Vehicle: 30.2$ Mar Proof Floor Varnish Four Hour Varnish Four Hour Varnish Cobalt Drier Elvarco Seal 42.2 94.0 183.0 9.4 91.0 Calculated Yield Manufacturing loss Actual Yield Yield in GallonsUnit CostTotal Cost 1.00 .50 0*50 2.2$ .70 .21 .056 .0103 8.75 2.63 1.68 .52 5 5/8 12 h 25 1i 12b 61.07 3.57 57.50 .731 .75| . 75b 55-| .52 4.13 9.44 10.88 .69 6.50 53.22 COST AITALYSIS _ Material co3t per gallon (total cost divided by actual yield)------------------ -926 Direct labor cost per gallon------------------------------------------------------------------------------- .03/5 Factory overhead per gallon--------------------------------------------------------------------------------.16S0 Sulk Cost per gallon---------------------------------------------------------------------------------------------- 1.1323 Complete package cost per gallon (container plus filling expense)---------- <13 Factory cost in onckage per gallon------------------------:------------------------- ------------------ 1.26 PRICES Show'the highest net unit price which was charged or which would have been charged March 1942 to ea.ch of the following types of buyers or transferees: (A) To a company owned or controlled outlet----------------------------(3) To an independent wholesaler------------------------------------------------(C) By company owned or controlled outlet to retn.il customer (D) To on independent retailer (dealer)-------------------------------------- $1.95 (E) To other (specify)---------------------------------------------------------------------- (Our business i3 principally through the independent retail dealer and therefore we are shoving that price only OPA 15856 N 5055