Document np36o7opN78vm38zJ4BygzwgG

Performance of 765-kv system > is called good ^ S'! voltage*, harmonic r .<.t. f T\ # . *. J . . 111 ,, . onnefTr V * *' : _ -,-^l:t-k-,_ -V-*j --- CIGRE delegates early this month dis- cJosint l* cussed the findings of extensive tesu on stat- / the AEP 765-kv system. CIGRE paper pcrfniZ_r 31-06, by H. Barnes and V. Caleca of iVmi AEP. described the results of 159 within 10 .f switching tests on the first portion of the ferentiai h system to go into operation. Results JIKj j were compared to predictions made by Iee j transient network analyser (TNA) stud- /#jg` g f ic. m .hr deign ,, clcin. The system had been designed for a ,bilitv 0*ni 2.0-p.u. overvoltage. The possibility of i * ' exceeding this was recognized, but was ; accepted on the basis that any system must be able to sustain an occasional p a flashover. Studies predicted a 5% rO|(p probability of seeing a surge of 2.1-p.u., but actual test results gave a 5% probability of seeing a 1.8-p.u. surge, k with a maximum not exceeding 1.83. enter I ** Maximum overvoltages occur during a| . i,ocmi high-speed reclosing due to trapped-0. charges on the lines. The scheme used }|R W to dissipate these charges prior to re. closing was to pul resistors in the neu-^jv ***" Tests completed on 500-kv Dreyfuss towers trail of the shunt reactors at one end of... ' . ^ 9 the 69-mile line used in the tests. These^ *or resistors were nonlinear, to prevent **'^*0* f*** itial overvoltage at the neutral bu$hingjve^ Jx.**1 Modern towers for 500-kv construction are gargantuan, and require large-scale test of the reactor, and were applied on onlye *"* * ing facilities. These towers, shown under test this spring at the Hazelton (Pa.) plant of two phases. Calculations had shown-* u Meyer Manufacturing Inc, will be installed on Philadelphia Electric Co lines as part that this would be effective, whereas F ** ** of the PJMtransmission grid. Dreyfuss-type towers were chosen to make the line ac one would not have been. ln - n 7'* ceptable to environmentalists. But even so, legal intervention has, to date, prevented The resistors were normally shuntect_, 10 installation of the towers to the area for which they were intended. * by a high-speed, 15-kv vacuum switch.,.,,. This opened when the 345-kv breaker..,,, opened-there are no 765-kv breakers ark. r. *. /^ron't dump used Askarel this locaiion-and closed automaticall'.i| '.A *P* 30 cycles later to protect the resistoRy*,;.1*1?** and to obviate the need for a signa. * c , fm from the remote breaker. _ 10 .* Comparative tests with the resistor,,,,. P0,,t^ Askars) should not be disposed of care disposal of this material. Monsanto is s, and with them bypassed, proved thi * J**Pcr lessly, because of the posibillty that offering its disposal facilities to those their presence caused the trappelri en|c some species of wildlife may be ad who do not have such facilities, as a ser charge to decay to a negligible value a,n *** 11 versely affected, says W.B. Papageoree, vice to their customers. Askarel to be ter 20 cycles, and to disappear conn,.. ** ,7* manager of environmental control for Monsanto Co. Amounts actually being disposed of should be shipped to Mon santo. The material will then be stored pletely by 30 cycles, when the breake^L. 1 * reclosed. This scheme proved so *flaf 0ooJ* found in the environment are extremely until an incinerator to handle it can be live that it will be adopted in aU futuui small, ha adds, making the problem of installed later this year. reactor installations. This and other dq- r TM** ** environmental control very difficult. Utilities are asked to ship their scrap velopments should permit designing Monsanto, however, has been asked to control losses at levels considered im Askarel to: Monsanto Co, Sauget. 111. 62201. c/o Supervisor, Dept 246. ture lines for surges of 1.5 p.u. or less. ^ The necessity of using reactors to pre.a.P' '` possible in the past, to prevent Askarel The fluid should be shipped in vent dynamic overvoltages at light load^' e Phon** from entering the environment even in trace amounts. Safe disposal of Askarel that is con heavy-duty drums. Monsanto is presently charging 3c/lb of material re turned lor processing. This charge does ing raises the question of how to ope^^/k^nt*T'' ate should a reactor fail. Oiiginally>*"*0tt1, 05 plans called for the line to be cut ou?5 ,IBployi taminated beyond the point of recovery and reuse constitutes a major part of Monsanto's control efforts according to not include freight or container costs. After the incinerator goes on line and actual disposal costs have been deter until the reactor was replaced, but thi^, `!,en entailed extended outages of possibly*01"*; critical lines. TNA studies indicated tha, lo . * Papageorge. Many users do not have mined through experience, this charge operating with one reactor out of scr| fler *,n access to facilities that permit proper will be reviewed. / vice could generate intolerable overv 'bg emerge TrentmiMiM/OlcIrflwMn D*ctrtc*l WorW, tiplwlw IS HONS 085164