Document nnxGRe6Z4bDE7LpJZMNOQD2G

SELLE INSULATION COMPANY Houston 7344 Stiles El Paso, Texas 79915 (915) 772-8525 Lubbock April 22, 1983 ASARCO, Inc. P.O. Box 1111 El Paso, Texas 79946 Attn: Mr. Carl Glaser RE: Antimony Plant Conversion 2- Chamber Baghouse and Ductwork Gentlemen: We are pleased to submit our bid on the above referenced project. We propose to furnish and install the thermal insulation and jacketing as follows: 1. Baghouse Sides, Top, and Hoppers 3" thick mineral wool secured with 10 gauge weld pins between stiffener ribs..016 corrugated aluminum sheets shall be screwed to the stiffener ribs. We have assumed that the space between each baghouse will not be filled; however, the two baghouse modules will be "boxed-in" with insulation and jacketing. 2. New Ductwork and Repair of Existing Ductwork 3" thick mineral wool secured to the duct in a similiar fashion as the baghouse. The metal finish will match the existing. Expansion joints, butterfly dampers, and access doors will be left open. NET PRICE FOR ITEMS 1 AND 2 $20,500.00 We have figured in all of our own scaffolding. This price is based on no overtime work. If you have any questions, please call me at 772-8525. We look forward to serving you again. Sincerely, -- SELLE INSULATION COMPANY Randy Hutton Contract Manager RH/djb COMMERCIAL / INDUSTRIAL / LOW TEMPERATURE / METAL BUILDING INSULATION / ROLL RUNNER ASARCO ELP 0009933 INSULATION & SPECIALTY CONTRACTORS 3518 DURAZNO AVE. EL PASO, TX. 79905 EL PASO, TX. (915) 544-2937 THIBODAUX, LA. (504) 447-5615 (24 HRS.) HARVEY, LA. (504) 348-9525 LAFAYETTE, LA. (318) 981-8434 April 6, 1983 Asarco Inc. P. 0. Box 1111 El Paso, Texas 79999 Attention: Hr. Carl Glaser Reference: Anitmony Plant Conversion Temp-Con, Inc. Proposal Number: 144/33 Dear Sir: We are pleased to offer this proposal to insulate and weather proof the new bag filters, cone's, transitions, duct and piping associated with the above referenced project. We propose to furnish all labor, tools, equipment, scaffolding, materials, insurance and supervision to complete our portion of the project. Our proposal is in strict accordance with drawings and specifications furnished. All materials will match existing equipment, duct and etc. Our lump sum price to perform the above work is $19,800.00. We would also propose to remove and replace insulation as required on a T/H basis.. All materials required will be invoiced at our cost plus 17%. All labor will be invoiced at our standard rates which are on file with Asarco. We sincerely appreciate this opportunity to quote on your insulation requirements and arc looking forward to working with you on this and future projects. Yours very truly FNii/klw Fred N. HcGeliee, Sr. MS<- **C&* ** ASARCO ELP 0009934- ALL temp insulation C.Q, 3200 Gateway East El Paso, Texas 79905 (915) 533-1910 April 20, 1983 ASARCO Company P.0. Box 1111 El Paso, TX 79999 Re: Antimony Plant Conversions 2 bags Gentlemen: We propose to insulate the above referenced project for the total sum of $29,000.00. The project will be insulated in strict compliance with the owner's specifications. The insulation shall be 3" fiberglass and the finish will be .016 aluminum jacket, matching the existing one. We also propose to replace any damaged insulation for $9.65 per square foot. We also propose to remove only, any insulation required to be removed for $12.00 per hour. Very truly yours Carlos R. Escobar ASARCO ELP 0009935 INSULATION & SPECIALTY CONTRACTORS TVemopn v> INC 3518 DURAZNO AVE. EL PASO, TEXAS 79905 EL PASO, TX. (915) 544-2937 THIBODAUX LA (5041 447-56'5 (24 HARVEY. LA (504) 340-9525 LAFAYETTE LA (3181 901-8434 . November 9, 1982 Asarco Inc. P. 0. Box 1111 El Paso, Texas 79999 Attention: Mr. Carl Glaser Reference: Time and Material Quotation Temp-Con, Inc. Proposal Number 362/82 Dear Sir: We are pleased to offer this proposal for your consideration to perform time and material work in your plant. LABOR RATES CLASSIFICATION STRAIGHT TIME OVERTIME Superintendent $27.50 $37.40 Foreman $20.00 $27.20 Mechanic $17.00 $22.50 Helper $10.50 $14.50 The above rates include base labor, payroll taxes, insurance, overhead and profit. Overtime is time in excess of eight hours per day and all work on Saturdays, Sundays, and plant observed holidays. Wfwtl* O* AJTfA Cl< 4h14* ASARCO ELP 0009936 ASARCO ELP 0009931 To: PURCHASING DEP'T. NE# YORK OFFICE EQUIPMENT . EQU I/WENT - _________- O ; Hi ft1 iUotx*f 1 'SA^ l-bose. t (Ucft 1 OSXrtTlCa; BID TABULATION Form PD 8-B Revised 9 60 DATE ____ APPRO. I REQN. I ; Name of Bidder I Manufacturer Model Number Soec. Evaluation j Bidder * 7'u/i^sU. . _ ^U-TgU^____ > OT Bidder * *Cl Bidder # 4 XC Bidder df l0l>Ou4rre k ) Oocr ''Q&pMtA fo i^Ypri^L {}jcr ~Z oftoo AIdcl_ i ikus /980o looo `Z.'t'oOo 1 OQo . ... J > oz i 1l | l 1 1 ' : Tom\u 1 "StASsT /Ur 5 > ''2'0'5'jxo 'Lokao S-Irfo.. . _____ !bo.Q'AO_._ i 1 I /W? 'STAETilK r ____ Tc? M ^S&. fu4u '1___ TO "TM. DpriL-t-nov. ft,At QcU-f-OOci) Qc (Ex^nlU'e O.Oc At Jrtiu l-foa.^ >uu<,r (\n(~ Q&J<&A 1 { j ii i ' t i I ; j : V { 1 -' ! ii ; ii i | DEP'T. - BY Page of Pg' ASARCO ELP 0009932