Document nmxx2k8RyOJMo3EraK6vyNkoG
2195 Front Street Logan,OH43138
ONeEMi
State of Ohio Envirwinieatal PiMtectioa Agency Southeast District Office
TELfc (740) 38S-8B01 PAXs (740) 385-6460
AR226-2607
Bob Tatt, Governor Christopher Jones, Director
May 13,2002
Mr. Andrew 8. Hartten, Project Director DuPont Engineering Barley Mill Plaza - BIdg. 27 Lancaster Pike & Rte. 141 Wilmington, DE 19805
Re: Comments on April 2002 Proposed Sampling Investigation Plan for Little Hocking Water Association Well Field Washington County Little Hocking, Ohio
Dear Mr. Hartten:
On April 23,2002, the Ohio Environmental Protection Agency Southeast District Office received the April 2002 Proposed Sampling Investigation Plan for the Little Hocking
Water Association Well Field. The work plan outlines the technical approach to determine the horizontal and vertical extent of C-8 in ground water in the vicinity of test
well TW-4. Ground water C-8 concentrations were measured in TW-4 at approximately 37 ug/1.
Ohio EPA has completed a review of the work plan. In addition, the Little Hocking Water Association, Inc; and their consultants. Burgess & Niple, Limited: and Bennett & Williams Environmental Consultants, Inc. have collectively reviewed Ihe work plan. Ohio EPA comments are presented first, followed by Little Hocking's comments as submitted to the Ohio EPA by letter dated May 3,2002. Ohio EPA request that DuPont address each of the comments provided below.
Ohio EPA Comments
1.
Ohio EPA request that DuPont collect and analyze soil samples in the Little
Hocking Well Field to evaluate presence or absence of C-8. These soil samples
should be collected in the vicinity of TW-4 and at the locations and vertical
depths as indicated below in comment 3. Ohio EPA is aware that the
methodology to run soil samples for C-8 may not be fully developed by Exygen
at this time. Please provide a time frame for the collection and analysis of soil
from the Little Hocking Welt Field.
2.
Ohio EPA request that duplicates of water samples be collected at an
approximately 10% rate for analysis by the US EPA Laboratory in Colorado.
^@ Pfirttd on HRaiccyye<aedd Pappae:r
ASH028105 EID781385
EID781385
LITTLE HOCKINQ WATER ASSOCIATION WELL FIELD WASHINGTON COUNTY PAGE 2
Little Hocking Water Assoclatten_Cpmments
1.
The Plan proposes to use a Geoprobe for penetration into the ground. The
primary advantage of the Geoprobe is that it does not generate wastewater or
cuttings, and as such, there is no disposal required. The primary disadvantages
are that the method may not allow penetration to ths bottom of the aquifer and
that the sample obtained Is quite small and no sample may be recovered from
coarser material.
2.
The upper sample is proposed to be taken at the top of the saturated zone, but
the aquifer is more permeable (n its lower 20 feet of section. It will not be known
whether or not the upper pan of the aquifer is confined. We therefore propose
that, in the event that some wells do not fully penetrate the aquifer, the contractor be prepared to propose another method that will allow full penetration
of the aquifer. Because the complete chemical properties of C-8 are not known
to us at this time, we concur that collection of both shallow and deep samples address potential density Issues. According to the 3M Materials Safety Data
Sheet, the specific gravity Is 0.4-0.6. This means that C-8 In pure form should float. However, it is imperative that the bottom of the aquifer be reached for sampling in light of the information contained in Dupont's information contained
in "TE3170 PTFE Fluoropolymer Dispersions All In" wherein ammonium
perfluorooctanoate (0-8) is listed- as one of the compounds and the generic description of the compound include a notation that the specific gravity is 1.4 -
1.5. This means that the compound Is more dense than water and will sink in the water column. There Is no data provided to indicate that the surfactant, C-8.
becomes stable when combined with other compounds. Further, there is no
data to indicate whether or not the C-8 assumes the greater specific gravity of
the new compound and is therefore denser than water and in a form that
dissociates,
3.
In order to bok at potential differential vertical densities and solubilities, we
suggest that at least two of the wells be sampled at five-foot intervals throughout
the entire section from the ground surface to the bedrock surface (which is
approximately 55 feet below ground surface). This includes sampling both
saturated and unsaturated sections (e.g. collecting both soil and groundwater samples). A surface sample of soil should also be collected at these locations,
The Geoprobe borings that we propose for this sampling include:
a.
the first Geoprobe boring south of TW-3 and
b.
the first Geoprobe boring east of TW-4.
ASH028106 EID781386
EID781386
LITTLE HOCKINQ WATER ASSOCIATION WELL FIELD WASHINGTON COUNTY PAGE 3
4.
In order to gather additional information between the two wells with the highest
detections to date (TW-4 and PW-5), we recommend that two additional borings
should be advanced between TW-4 and PW-5. These borings should be
advanced at approximately equal intervals between these two existing wells,
5.
In addition to the water sampling and analyses proposed in the Geoprobe
holes, existing test wells (TW-1 through TW-6 and TW-9 through TW-11) and
production wells PW-1 through PW-3 and PW-5) should be sampled and
analyzed at the same time as the Geoprobe Investigation. In addition, water
levels should be collected from all existing production and test wells prior to
beginning the Geoprobe investigation. Water levels should be recorded for the
Geoprobe borings as the borings progress. In addition, the level of the Ohio
River should be recorded at the time of the tests.
6.
The Work Plan does not contain a map that shows the location of all the test
wells. The Work Plan map should be revised to include all wells on the property.
(The Work Plan map is attached for reference. A plat map showing the location
of all the test wells and production wells is also attached).
7.
According to the Work Plan, "the probe assembly used will be decontaminated
between sample locations according to the procedures described in the Quality
Assurance Project Plan (Dupont, 2002)" However, the Work Plan Is not specific
as to whether or not other procedures in this document will be followed. For
example, the Work Plan states "The temporary welt points or Screen Point 15 Groundwater Sampler will be purged a minimum of three volumes before
groundw&twIs sampled." However, there are no stated requirements for
collection of indicator parameters such as pH, temperature, specific conductance, and turbidity in the event of Geoprobe sampling. The QAPP
addresses these types of procedures on page 14, but it is not clear If any of
these procedures will be used. Also page 11 implies that pH and specific
conductance meters will be calibrated, but does not mention other meters. Thts
needs clarification.
ASH028107 EID781387
EID781387
LITTLE HOCK1MO WATER ASSOCIATION WELL FIELD WASHINGTON COUNTY PAGE 4
8.
If the QAPP is to be used for determining water stability before sampling, pH,
temperature, specific conductance and turbidityshould be collected at a
minimum. PH is of specific importance because the well with the highest
reported value for C-8 (TW-4) had a field pH of 11.5 (as reported on the Chain of
Custody) during the January 22,2002 sampling event. This value was
significantly higher than TW-1 at 8.2 and the remaining wells in the 7.0 to 7.6
range, Turbtdity may also be Important In that Geoprobe samples typically
have a higher turbidity due to the temporary nature of the well screen Installation
and the lack of well development. Because not a lot of information is available
about C-8, sorption to the finer particles, sequestering of the finer particles and subsequent removal of the surfactant through filtering prior to laboratory analysis
may prove to be a factor in concentrations. A report by A. N. Welter for 3M dated March 23.1979 shows that FC-143 (aka C-8) sorbs only slightly (5%) to a
sandy loam soil and then is readily desorbed. However, no studies on clay-rich
soils or soils with appreciable organic content were Included. It has been
reported to the authors that Dupont currently uses granular activated carbon to
lower concentrations of C-8 prior to discharge. Turbidity may prove to be a
factor in interpreting the results, and therefore should be monitored and
recorded.
9.
The QAPP recognizes that three consecutive readings of the measured field
parameters are used as the criteria to indicate stabilization of the sampled water
and initiate sampling. However, the QAPP states that the readings of the
parameters must be within 10 percent on the three consecutive readings. In
fact, the 10 percent rule should only apply to specific conductance and turbidity.
One tenth of a unit should be the criteria for pH and C. This is due to the large
nature of the increments in these measurements. For example, 10 percent of a
pH of 7 means that the pH can vary between as low as 8.3 or as high as 7,7 and
be considered stable. Considering that each pH unit is an order of magnitude
greater than the next whole number, this shows that 10 percent is not the correct
Interpretation for stability. However, a one tenth of a pH unit when used as the
criteria for stability means that a pH of 7 can be as low as 6,9 or as high as 7.1
and meet the stabilization criteria.
10. The QAPP Indicates on page 9 that the sample will be analyzed using a LC/MSYMS and that "Selectivity for C-B is demonstrated by the presence In the chromatogram of a peak of a daughter Ion at 369 amu from a parent of 413
amu" We recommend that. as part of the reporting process, a library search be performed and the results be reported for other chemicals present as indicated by peaks on the same chromatogram.
ASH028108 E1D781388
EID781388
LITTLE HOCKING WATER ASSOCIATION WELL FIELD WASHINGTON COUNTY PAGES
11. The Work Plan states, The sampling process wfll use a narrow diameter bailer, tubing/check valve system, and peristaltic pumps." The reviewed Materials Data Safety Sheet states that the compound is 33 to 40 percent volatlles by volume.
According to the Technical Guidance Manual for Hydrogeologic Investigations and Ground Water Monitoring (Ohio EPA, February 1995), peristaltic pumps promote "degassing and loss of VOCs; therefore, these devices are not recommended for collecting samples to be analyzed for volatile or semf-volatilQ compounds and dissolved gasses. The National Council of Industry for Air and
Stream Improvement (NCASf, 1Q84)found a 10 to 30 percent loss in VOC
concentrations from peristaltiGAfQcuum flask systems compared to results for bailers, bladder pumps, or submersible pumps." The sample extraction methodology should be revised to exclude peristaltic pumps or sampling method that uses suction lift (and thereby creates a vacuum). Other methods of sample extraction should be specified that minimize volatilization. In the Screen Point 15 Groundwater Sampler this may effectively limit the sampling device to a mini bailer.
12. The Work Plan does not specify the material to be utilized as screen in either the Ceoprobe or the Screen Point 15 Groundwater Sampler. Screens for these devices are manufactured in aluminum, stainless steel and PVC. The QAPP indicates on page 12 that aluminum foil should be avoided. Does this mean that the Work Plan will only accept stainless steel or plastic? If so, this'should be stated.
13. The Work Plan states on page 2 "Once groundwater is sampled, the wellbore wilt be backfilled with bentonite.' However, neither the type of bentonlte (pellets, slurry, etc.) nor the method of bentonite emplacement is specified. These penetrations into the subsurface are being made in the wellfield and if not sealed will provide a direct route for contamination from the surface. Given tile concern about the route of migration for the C-8 at Dupontto the wellfield (I.e. airborne and subsequent infiltration, groundwater migration, or combination of both), ensuring sealing of the boreholes is imperative. The Work Plan should specify that a bentonite/cement slurry or neat cement grout mixture will be emplaced from the bottom of the boring until returns are seen at the surface. Both the Geoprobe and Screen Point 15 Groundwater Sampler can meet these objectives and grout can be emplaced through a tremie tube.
14. The Work Plan should acknowledge that the Qeoprobe is good for preliminary screening efforts, but that permanent sampling points and further investigation may be necessary at the weltfield. These investigations would Include looking into the reasons for the high G-8 level In Production Well #5.
ASH028109 EID781389
EID781389
LITTLE HOCKING WATER ASSOCIATION WELL FIELD WASHINGTON COUNTY PAGES
15. Wwilet nweilel dretqhuisirienfcoorpmieastioonf ainll ofiredlderntooteinstearnpdre/ot rthdeatsaacmopllleectrieosnuslthseaentsd. toEfnagciinlietaetres
thsir investigations of this contaminant. If you have any questions, concerning the above comments, please contact me. Sincerely,
./-ish*^*- . w-ui^-^
Steven . Williams Hydrogeologist SEW/jmd Enclosures cc: Mike Preston, Ohio EPA, DDAGW, SEDO
Sarah Wallace, Ohio EPA, DDAGW, SEDO Mr. Robert L, Griffin, P.E. Little Hooking Water Association Ms. Linda Alter, Bennett & Williams Mr. Ron Schulte, Burgess & Niple
file
ASH028110 EID781390
EID781390