In response to your request on July 24 for a concrete pad to cover the tank farra area, consideration was given to this eleruent when the project scope was prepared. The concrete pad was not incorporated in the scope and the background then and now is as followsi
When there is a leak onto a chatted surface, raost chemicals work into the void spaces of the chat and do not require dayby-day clean-up. Then, twice a year, or as needed, selected spots can be shovelled up and replaced by fresh chat. This approach has been acceptable at the ltrun&rich Plant Aroc lor Department.
A system of concrete floors, to be workable, would probably require trench sewers, grating, and detergent-steam cleaning stations. Further, it would require day-by-day action on leakage, which I doubt would be executed.
I propose that we proceed as planned, and if after actual ex perience it seems desirable to concrete over selected areas you could justify it.
R. w. Peterson Project Manager