STATUS OP PROGRAM TOR AROCLOR POLLUTION CONTROL
TO Hr. J. R. Savage - 0,0
Messrs.
G. L. Dratseh C. F. Buckley/M. R. Poresman B. W. Coi'lcw P. E. Heir.ler P. 13. Hodges - G.O. 1). W. Jfic'Ksori W. A. Krull R. M. McCutcharv >* P. McDora Id - Newport A. L. Rasmussen W. R. Richard - G.O. J. Corder - Anniston 1!. Young
This Is the February 1, 1971 status of the PCB pollution control program.
I PC11 Levels In Sewer!
A. Aroclor. losses from the Aroclor Department averaged about 0.6 Ibs/day with a high of about 1.1 Ibs/dr.y.
Losses from the treatment plant for the period 1?/17 1/15 averaged ?.? Ibs/day (11*1 ppb). Range for 6 samples was 2 to 55 lbs/day (9-270 PPb).
B. Data gathering on Aroclor In the various plant sewer:; is in progress. Samples are being composited twice weekly for analysis.
11. Projects to Reduce Sewered PCB's from Aroclor Department
A. Design package for Estimate 2*t22 to pave and tr non loading -and storage areas wan completed and issued in January,
III. Programs to Eliminate Sewered PCB's from Using ])gartnents
A. Therminol system In OUA (Dept. 222) was changed to Therminol 66 during the month.
B. Completion of design packages for 15 additional units is scheduled for 2/15/71. Changeout of all units Is targeted for completion by 6/1/71.
C. Several alternates including use of a eutectic salt are being evaluated for the Dept. 2A5 (PeSs) therminol unit. Evaluation is scheduled to be completed by fc/l/Yl.
HONS 045072
Mr. J . I!. Savage - G.O.
Stall's of Program for Aroclor Pollution Control
Page 2 February ?, 3971 WGK
D. Decision on what hydraulic fluid to use to replace the PCI) Pydraul In Dept, 251 villi be made by 3/1/71.
E. In order to reduce the risk of PCB's being sewered from washing Aroclor trailers at Rogers Terminal, all Rogers trailers containing PCB's will he washed at WGK's Rip Track.
IV. Reach 10 ppb In the Treatment Plant Effluent
At this time. It appears probable that PCB losses to the sewer can be controlled at less^than 2 lbs/day (equivalent to 10 ppb at the treatment plant) by 9/1/71. This will be accomplished by:
1. Continuing current control of losses from Dept. ?A6,
2. Changeout of all therinlnol units to non-PCB fluids.
3. Installation of pads and catch basin at the loading and storage areas In the Aroclor department.
A. Installation of a catch basin at the Rip Track.
Losses at the treatment plant are expected to remnln shove 10 ppb by 9/1/71 due to past sewer contamination. Projects-to clean sewers could run several hundred thousand doJl-v's. A preliminary estimate to clean the sewer from the ChJo-i-io department to the plant fence was $70,000 and another $70,000 would be required to clean from the fence to the treatment plant.
Both main plant sewers appear contaminated with PCB's (;>0ar PAW). Our plan Is to continue monitoring the main sew:ru to determine extent of locoes and loss dissipation rate. By li/l/71, when essentially all thermlnol units have b-:-n changedout, we should be able to extrapolate to when the PCB level should reach 10 ppb at the treatment plant without sewer cleaning. Based on this Information, we should decide promptly on whether or not sewer cleaning is Justified.
V. PCB Levels In the Atmosphere
Estimate 2675 for $6,000 expense was approved to replace the nitrogen purge with a nitrogen blanket at the mix tanks. Project package Is scheduled for completion by 3/15/Yl.
MQNS (H5073
Mi'. J. li. Savapce - G.O. Status of Program Tor Aroclor Poll.ut3.on Control
1'UKC 2 February ?, 1971 ViG,<
VI. PCD ncworh Project (list. ?09'j) Project package was Issued in January.