Document nmVxbYJXRygwJajxKaoq7Ko7R
UNITED STATESUNITED STATES ENVIRONMENTAL PROTECTION AGENCY
* *REGION 1
AGENCY5 POST OFFICE SQUARE, SUITE 100
ENVIPRROTOECTNIOMN
ENTABOSTON, MA 02109-3912
Drafted Date:23 December 2020
Finalized Date:11 January 2021
Subj:Inspection Report
Clean Water Act - National Pollutant Discharge Elimination
System (" NPDES ")
Lunenburg Water District Office Construction
From:Andrew Spejewski
Thru:Stephanie Tougas
To:File
I. Facility Information
A. Facility Name:Lunenburg Water District Office Construction
B. Facility Location:496 Massachusetts Avenue
Lunenburg, MA 01462
C. Facility Contacts: Fran McNamara
fmcnamara@lunenburgwater.net
D. NPDES ID No (s).: MAR1000KM
II. Background Information
A. Date(s) of inspection: December 15, 2020
B. Weather Conditions: Clear, below freezing, partial light snow cover on the
ground
C. US EPA Representative(s): Andrew Spejewski
D. State / Local Representative(s): None
E. Federally Enforceable Requirements Covered During the Inspection: EPA
Construction General Permit
ED_019088A_00020042-00001
F. Previous Enforcement Actions: None known
III. Type and Purpose of Inspection
Evaluation of Compliance with Construction General Permit
IV. Facility Description
The site is a construction site for a new office / garage building for Lunenburg Water
District. It lies south of and uphill from Mass Ave, with a single driveway leading up to
the building & parking lot. To the west of the building, up a short rise, is an unpaved
staging area.
The site slopes down to the south. The southern section is below the terrain to the east
and west, while the northern section slopes down to Mass. Ave. and is more or less the
same height as terrain on either side.
A stormwater basin lies to the east and slightly south of the building.
At the time of the inspection, the project was nearly complete. The building was
complete and occupied, and most of the site had well - established grass or hydroseed.
V. Inspection
Mr. Spejewski called the facility in the afternoon of December 14 (the day before the
inspection) and reached Christie Schwinger. Mr. Spejewski arranged to inspect the
facility the next morning. As Mr. Spejewski did not know the exact time he'd be at the
facility he arranged to call the facility when he arrived, and Ms. Schwinger would meet
him outside with relevant paperwork.
On December 15, Mr. Spejewski arrived at the site about 10:30, called Ms. Schwinger
and met her outside the building.
A. Opening Conference / Records Review
Mr. Spejewski presented his credentials to Ms. Schwinger and re - iterated the purpose of
the inspection. Ms. Schwinger explained the project, saying that the Water District had
acted as their own general contractor for the project, doing most of the site work
themselves.
Mr. Spejewski asked to review the Stormwater Pollution Prevention Plan (SWPPP) and
the records of inspections of site erosion controls. Ms. Schwinger said that, due to the
recent move of offices, she had been unable to locate the SWPPP or reports. Mr.
Spejewski requested that she email copies to Mr. Spejewski, and she agreed. [See
addendum below.]
B. Facility Tour
2
ED_019088A_00020042-00002
Mr. Spejewski and Ms. Schwinger left on a tour of the site, and were joined by Fran
McNamara, superintendent of the Water District.
The building appeared complete, as did the parking lot on the east and north side and
paved drive on the west. The building and parking were surrounded by well - established
grass. To the west of the building, a short grass slope led up to an unpaved staging area,
itself below the terrain to the south and west of the site.
East of the building, a drainage swale led north to a stormwater basin. The swale was
constructed of dirt and the drainage in the center was slightly eroded in places. Mr.
Spejewski noted to Ms. Schwinger that some rip - rap or gravel could stabilize that and
prevent sediment build - up in the basin.
The basin had walls of dirt with well - established grass. A rip - rap wall divided a forebay
from the other half of the basin. Ms. Schwinger said the basin discharged to the north,
near Mass Ave.
The slope down from the basin to Mass Ave. was grass and / or hydroseed. At Mass Ave.,
a pipe discharged east from the driveway to a swale / drainage along Mass Ave. Ms.
Schwinger said it led through a culvert going north under Mass Ave. just to the east.
On the west of the driveway, a short stretch of grass led to the property line, with a grassy
area on the property adjacent to the site. A line of silt fence was in place along the site
border, though now fallen down in multiple places. There was no sign of sediment
carried into the adjacent cleared area (possibly a wetland near the road). Mr. Spejewski
mentioned that the silt fence should be removed at some point, Ms. Schwinger said they
were waiting for spring.
At the top of the slope, west of the drive was a section that had been hydroseeded, but no
grass was growing yet. Mr. Spejewski noted that attention needed to be paid to this area
in the spring, as the binder in the hydroseed might not hold the area in spring.
D. Closing Conference
Finishing the tour, Mr. Spejewski thanked Ms. Schwinger and Mr. McNamara for their
time and left the site at approximately 11:00 AM.
Picture List:
[Note: time on camera was set to Eastern Daylight Time, therefore timestamps are one
hour later than actual Eastern Standard Time in effect]
IMG 2179.JPGFacing north along west side of site
IMG 2180.JPGFacing south, along sw of site
IMG 2181.JPGFacing north over basin on east of site
IMG 2182.JPGBasin on east of site
IMG 2183.JPGFacing east along Mass Ave. from site entrance
IMG 2184.JPGFacing west into wetlands from site
IMG 2185.JPGFacing south into site, just west of entrance at Mass Ave.
3
ED_019088A_00020042-00003
Addendum: On Dec 21, 2020, Ms. Schwinger emailed Mr. Spejewski several documents
now saved in the inspection file, including a SWPPP and inspection reports.
Unless otherwise noted, this report describes conditions at the facility / property as
observed by EPA inspector(s), and / or through records provided to and / or information
reported to EPA inspector(s) by facility representatives and as understood by the
inspector(s). This report may not capture all operations or activities ongoing at the time
of the inspection. This report does not make final determinations on potential areas of
concern. Nothing in this report affects EPA's authorities under federal statutes and
regulations to pursue further investigation or action.
4
ED_019088A_00020042-00004