Document nmN8v4M0pxOK5Jq3vEYKQR77G

744 CHAPTER 53 1960 Guide R. R. Bennett and S. N..Hawks: Tobacco Curing (University of Norik Carolina Extension Circular 332, January 1949). L. 8. O'Bannon: Principles of Burley Tobacco Bam Operalion (University of Kentucky Bulletin 501, May 1947). E. M. Matthews, M. II. McVickar, and R. B. Davis, Jr.: Fuels for Curing Tobacco (Virginia Agricultural Experiment Station Bulletin No. 396, May 1946). N. C. Teter and E. G. Moss: Beating Tobacco Bams with Stokers (North Carolina Agricultural Experiment Station Bul letin No. 352, May 1945). Irvin Lavine and O. D. Sutherland: Revised psychrometric chart assists high temperature design (Chemical and Metal lurgical Engineering, April 1928, p. 226). C. R. Wilkie and O. A. Hmigen: Maas transfer in the flow { gases through granular solids extended to low modified Rey nolds numbers (American Institute of Chemical Engineers Transaction*, Vol. 41, 945, p. 445). W. R. Marshall: Current Stattu of the Theory and Practice of Drying (University of Wisconsin, Engineering Experiment Station Reprint No. 265). CHAPTER 54 OWNING AND OPERATING COSTS Fixed Charges: Amortization, Interest, Taxes, Insurance, Rent/ Maintenance Costs,Labor hr Operation,- Energy and Water Costs: Operating Refrigerating Equipment, Condenser Water, Heating HE total cost for the use of heating, ventilating, and 2. Heat distributing equipment including direct radiation, Tair-conditioning systems may be divided into two classi piping, etc. fications. The first of these is the relatively fixed and unvary 3. Air handling equipment including fans, air heaters, air ing expense of ownership, and the second is the variable and conditioners, filters, controls, etc. somewhat controllable expenditure for actual operation of 4. Air distribution system including ducts, outlets, grilles, etc. the equipment. Owners and prospective purchasers of this 5. Refrigerating equipment including piping, pumps, etc. equipment are particularly concerned with both since the actual expenditure is generally predicated upon the possible 6. Water conservation devices including towers, evaporative condensers, etc. return on the investment resulting from increased patronage, 7. Insulation of pipes, ducts, and equipment. greater efficiency on the part of the employees, meeting of 8. Building alterations, furring-in ducts and pipes, structural work, etc. competition, or the improvement and maintenance of quality in a manufactured product. These costs may be grouped under four headings: (1) Fixed Charges, (2) Maintenance Costs, (3) Labor for Operation, and (4) Energy and Water Costs. To estimate the first cost of any system prior to installa tion, the best procedure is to determine the heating and cool ing load, and then after thorough engineering study, select the type of system. The installed cost of systems will vary FIXED CHARGES widely, depending upon the type of equipment selected, and the design of the.distribution system, equipment and labor Tired charges are the annual expenses arising from-the costs in the locality, demands for the particular installation, ownership of the installation, including use of the owner's etc. A reasonably approximate cost may be determined for a money, and protection of the equipment in the form of in selected design in a given locality from the sum of the es surance. Such costs are usually unchanged from year to year timated unit costs of the component parts of the system. regardless of whether the equipment is in or out of service, A reasonably precise estimate of the cost of the components fixed charges may be grouped under five headings: (1) may be obtained from cost records of recent installations of Amortization, (2) Interest, (3) Taxes, (4) Insurance, and a comparable design, or from quotations submitted by (5) Rent. manufacturers and contractors. Amortization Approximate costs are given in Table 1 for mechanieal air-handling systems including heating and cooling coils for As air-conditioning equipment becomes older, its ability or capacity to perform present and future service is reduced. Provision must be made for the owner to recover each year a portion of the initial value of the equipment as an expense to be charged against revenue, or to amortise the cost. This decrease in the value of property is usually determined by an accountant or engineer using some theoretical method and will depend upon (1) the total first cost, and (2) the amortization period. The total first cost of an installation is the actual capital expenditure required to buy and install the air-conditioning, heating, or ventilating system ready for operation. It repre sents the first cost of the equipment combined with addi tional costs incurred because of the installation of the system. The first cost of air-conditioning, heating, or ventilating systems includes the following: distributing Wt cfm per square foot of floor area and re frigeration equipment based upon a`requirement of one ton for every 333 sq ft of floor area. Different types of service demand may change the floor area per ton of refrigeration and air volume per square foot between wide limits and, con sequently, the table should be used with caution. Other first costs may be incurred because of the installa tion of the air-conditioning or heating and ventilating sys tem. These will include such items as electrical work, plumb ing, miscellaneous piping, building alterations, cutting, patching, furring-in of ducts or pipes, foundations, structural supports, remodeling or redecorating after installation, con sulting engineer's fees, licenses, and permits. As these costs vary widely no approximations are practicable. Therefore, each case must be considered individually. If a quotation can be secured from a manufacturer or contractor covering the complete job, it will usually include the items that have been mentioned. 1. Heat producing equipment including boilers, burners, The length of the amortization period to be used depends controls, etc. upon (1) the type and remaining life of the building or