Document nmDo5ago0R7kbwayv8EDkbj7w

. . Section 2QI.1S9 Signatures All applications and supplements thereto shall be signed by the owner and operator of the emission source or air pollution-control equipment, or their authorized agent, and shall be accompanied by evidence or authority to sign . the application. . Section 201.160 Standards for Issuance . No operating permit shall be. granted unless the applicant submits proof to the Agency that: a) The emission source or air pollution control . - equipment has been constructed or modified to operate so as not to cause a violation of the' Act or. of this Chapter, or has been granted a variance therefrom by the Board;and Is In full compliance with such variance; and b) The emission source or air pollution control equipment .has been constructed or. rodtf led In accordance.*!th all conditions In'the construction permit, where applicable: and .. c) The emission source or air pollution control equipment has been .shown by tests' In accordance with the provisions of 'Subpart J to operate in accordance with the'emission limitations set forth-In this Chapter, provided that the Agency may Waive the requirement for actual tests where sufficient standard testing Information is available: and 4)'The. Applicant .has taken all technically ' feasible measures. Including changes In work . rules,- to minimize the duration and frequency ,, of startups and to reduce the quantity of ` emissions, during startup; and e) If subject to. a future compliance date, the .applicant has an approved compliance program and project completion'schedule In accordance with the provisions of Subpart H; and O' If required, the-applicant has an approved . episode action plan In effect th accordance with the provisions of IS 111. Adm. Code 240. Sect Ion. 201.16.1, Conditions 1 .. . the-Agency-may impose such-condltldns In an operating permit as may be necessary to accomplish the purposes of the Act. and as are not inconsistent with the regulations pronulgated by the.Board thereunder. Except as herein specified, nothing In this Chapter shall be deemed to limit the power of the Agency In .this regard. When deemed appropriate >s a condition to .the- Issuance of an operating permit, the Agency may require that the permittee adequately maintain the-alr pollution .control, equipment covered by the permit. To assure that such a maintenance program Is planned, the Agency may require that the permittee have a maintenance program and keep . such maintenance records as are necessary to demonstrate compliance with this rule; provided. however, the Agency shall not have the authority . to approve the maintenance- programs requiredthereunder. Section 201.162 Duration Mo operating permit shall be.-valid longer than five years or such.shorter period as the Agency . may specify, in the operating-permit as necessary to accomplish the purposes, of the Act and this Chapter. Applications for renewal of an operating permit shall be .submitted to the Agency at least 90 days :prtor ,lo the expiration of the prior penult, and shall, conform to Sections-2W-.-W; IthtSTand 201.IS9. The standards.far Issuance of renewal.permits shall be as'set forth.in Section 201.160. (Sources. haed<tit.yiVt, Beg. 124*-.effective-- . July 28. 1979) SecHcn- lW.M-i Joint-Construction -and-.... ' Operating Permits -In'cases'idiere the Agency determines that an emission source.or air pollution control equipment is sufficiently.standard-;so as to obviate the need fori separate construction and ' operating permits, the Agency may issue a Joint construction aqd operating permit. Hie Agency may adopt procedures whtchrset forth-lhe --circumstances under which Joint construction and operating permits may be Issued: require data . and 1nTqraarTcn derTgyied^nr'dCTenatffe compTtznce" with this Chapter, and ambient .air quality standards: and which set forth.the'rormst by which alV data and Information shall be submitted. The standards for Issuance of Joint construction and operating permits shall be as set forth In .Sectioes 201.155 and 201.160. Except ar herein provtdedr'iwtlrtng'-tirthis .... Chapter shall be deemed to limit the power of the Agency in this regard.- No-Jotnt construction-and operal-tAg-pernSt-shaVl be valid lor longer than five years-or .such.sh'prter period as, the Agency may specify'thei.Joint construction'and opertiwg~pewrtt~-<^necessary- -to-accomplish the: purposes of: this.Chapter. Applications.for. renewal of a>.permit shall be $ubmltte(i..lo the Agency;at..least M.dajcLprior to the'1expiration of tlie prior permits and shall conform to such procedures as may have been adopted by the Agency; and the standards for issuance of renewal permits shall be-as'set forth In Sections 201.155 and 201.160. The term "operating..permit* as usetf"eTTewhenrrhr-Hrtr~ Chapter shall be deemed to include-jf-Joint construction and operating permit. (Source: Amended at i 111. Beg. 124, effective July 28. 1979) Section rar.rsr resign criteria'-- a) The Agency may adopt procedures which set forth criteria for. the design, operation or ma1ntenance..of emission sources and air pollution control equipment. These procedures shall be revised from time to time -7 -