PLANT MANAGER'S SAFETY BOARD MINUTES OF MEETING MAY 19, 1982
Present were:
G.A. Danner G.W. Daues H.O. Reid for D.E. Kaldenberg B.C. Lancaster D.D. Ros C.M. McCullough D.W. Metten
C.F. Navarrete M.L. Owens G.T. Ryaq H.M. Lacy for J.G G.L. Tromblee J.A. Glass
Trafton
I. REVIEW OF STATISTICS--J.A. Glass A. Texas City Plant Safety Performance Summary - April 1982
(A) WITHOUT LOST WORKDAYS (medical treatment only)
(B) LOST WORKDAYS **Bi RESTRICTED ACTIVITY **B2 DAYS AWAY FROM WORK (C) FATALITIES
*TOTAL RECORDABLE CASES
1981
1982
1982
Apr. YTD Apr. YTD TARGETS
2 8 1 6 11
02 00 02 __ 0 __ 0
__ 2 10
1 0 1 0
2
22 0-- 2-- 0
8 13
INJURY RATES PER 200.000 MANHOURS
1981
1982
1982
APR YTD APR YTD TARGETS
TOTAL INJURY - TIR
11.52 12.26
TOTAL RECORDABLE - TRR
1.44 1.80
TOTAL LOST WORKDAY - TLWR 0.00 0.36
DAYS-AWAY-FROM-WORK - DAWR 0.00 0.36
11.49 1.44 0.72 0.72
9.19 1.39 0.35 0.35
--
0.75 0.12
--
YTD 1982 MCIC TARGET YTD ----
1.45 1.19 -- 0.37 -- 0.30
B. Comments on Statistics
We had two Recordable Injuries in April:
1. A boilermaker suffered fractured ribs and vertebra in a fall from an extension ladder. Although his long term prognosis for
SC 003249
LAM004263
MSB Meeting Minutes - May 19, 1982
Page 2
recovery is good, expected time from work will be six weeks to two months as a result of this major injury.
2. An HCN Complex operator slipped on a loose stud bolt that was lying on the ground in front of the stairway to the operating structure. He fell and hit his left shin on the base of the stairway causing a bad bruise and a cut that required five sutures to close. He reported back to work near the end of his shift and completed it.
This brings to a total of eight Recordable Injuries through the firBt four months. We are far off of our expected performance and the problem continues to be caused by a lack of safety awareness in all of these major incidents. Performance cannot be expected to Improve until safety awareness improves.
C. Contractor Safety--C.M. McCullough
The contractor injury reports are attached. Mike McCullough expressed concern over the fact that the total number of injuries were up in spite of the reduced number of persons working on the contractor payroll.
D. CEP Project Safety--B. 0. Lancaster
The CED Construction gioup experienced two Recordable Injuries in April. Both of these were lifting incidents. Details of the acci dent statistics are attached as an addendum to these minutes.
II. REPORT OF THE SAFETY ADVISORY COMMITTEE (SAC)--C. F. Navarrete
A. Comments on SHAC Recommendations
1. 1981 S&PP Survey--81-4 Combustibles in Control Rooms
Combustible goods inside control rooms must be minimized. A small, ordinary combustibles fire could cause a major business interruption loss. Combustibles which cannot be eliminated need to be stored in closed door metal cabinets. Examples of com bustible goods exposures to control rooms include:
a) Coats and rain gear are stored adjacent to and in the rear of the ethylbenzene control panel.
b) Cardboard boxes of plastic goggles are stored behind the east control panel in the HCN complex control room.
c) Instrument drawings are stored inside the rear access doors to the control cabinets in the AN-5 control room.
Sc
03250
LAM004264
PMSB Meeting Minutes - May 19, 1982
Page 3
d) Plastic trash cans in control rooms need to be replaced with containers of metal construction, preferably of approved self-extinguishing design.
SHAG Recommendation--J.J. McClellan
SHAC feels that combustible goods Inside control rooms must be minimized. However, it is not feasible or justified to comple tely eliminate these materials or require storage in metal con tainers. No smoking is allowed in control rooms, and personnel are in constant attendance; thereby, minimizing the probability of fire in these areas. Some guidance on what is and is not acceptable should be provided to the units. Answers to these specific examples stated are:
a) Supervision disagreed that this was a fire hazard, and no action is planned.
b) Although supervision did not feel this was a fire hazard, goggles will be stored in a cabinet for improved housekeeping.
c) I&E does not agree that the quantity and method of storing schematic drawings in the access doors of the control cabinets constitutes a significant fire hazard to justify the loss of efficiency by moving the drawings to another location. This method of storing the drawings is especially useful for emergency work. Neither AN-5 nor I&E supervision plan to take any action.
d) SHAC disagrees that this is a fire hazard especially since smoking is not allowed in control roans.
Safety Advisory Committee (SAC) Action--C. F. Navarrete
SAC supports the '81 SHAC Recommendations with a reminder that:
a) The space behind panels in control rooms is not a storage area for combustibles. (Should be a focal point for future inspections by General Superintendents.)
b) If in doubt, consult with the Fire Chief or his assistant.
B. MCI Plant Safety and Housekeeping Inspection 10/13-15/81
1. Recommendation No 3: There appeared to be some inconsistency in the enforcement of the guidelines covering hard hat requirements. We observed outside truck drivers and female office employees without hard hats. We recommend clarification of the rules covering hard hat requirements.
SC 003251
LAM004265
PMSB Meeting Minutes - May 19, 1982
Page 4
Responsibility: SHAC
Status: Action plan will include the following:
a) Posting of existing rules on hard hats, glasses, and shoes from "Monsanto Guide to Accident Prevention" as reminder. This reminder will include cautioning against cutting through exposure areas (units) to and from work.
b) Will further recommend and.submit to SAC a suggested new policy on hard hats, shoes', and glasses by July 1982
SAC Action On Above Recommendation: SAC supported the recommended action.
2. Recommendation No 4, Cover Goggle Signs: Signs on posts and painted on pavement Indicating the need for cover goggles are well below the normal line of sight. The background color is yellow with black lettering. You may want to consider a dif ferent color combination to highlight cover goggle requirements since yellow and black are used for other types of warning. Permanent signs at eye elevation should be installed.
Responsibility: SHAC
Status:
With SAC approval SHAC Alert will be Issued to the units requiring the posting of signs at eye level. Mo changes are recommended in the use of yellow color for marking boundaries.
SAC Action: SAC supported the recommended SHAC action, but pro posed to communicate to the units by memo to the Unit/Craft Contact Supervisors.
The Plant Manager rejected this action and was not satisfied with these reports. He plans to review this item with Mike McCullough to consider some alternatives that might involve a different color and posting requirements to highlight the need for cover goggles better.
3. Recommendation No. 8, Biennial Loss Prevention Reviews: Review present biennial audit procedure to determine if a two year time frame is correct. If it is, lay out a plan to get back on sche dule. If it is not, then set up audit timing to meet new sche dule.
Responsibility: LP&S, Hammann to review with SAC.
Status:
Procedure Bulletin has been revised and a schedule devised to show compliance. Hammann will review with SAC.
sc 003252
PMS3 Meeting Minutes - May 19, 1982
Page 5
The proposal for changing the biennial to triennial loss preven tion reviews has been reviewed and will be circulated for approval. .
SAC recommended that the existance or need for similar procedure be considered by the Laboratory, PT, and Central Shops. The power distribution system within the plant was reviewed a few years ago by an outside consulting firm. A number of revisions and additions to the system were made as a result of this review. Mike McCullough will review and comment on the timeliness of another review of the power distribution system.
C. Onit/Craft Safety Promotion Team Policy
SAC reviewed the charter of these teams and the Plantwide Safety Program Procedure Bulletin P-0100. The policy seemed adequate, giving the Unit/Craft team all the latitude necessary to "promote" safety. They did not recommend changing it.
The degree of activity on promotion can, and should be, geared to the needs of the plant and the units at any particular time, by providing the necessary leadership to these teams.
This recommendation was accepted by FMSB.
III. REPORT OF THE PLANT SAFETY AND HOUSEKEEPING ACTION COMMITTEE (SHAC)-- D. D. KOS
A. Armored For Safety Program
1. Kickoff news article was planned for week of May 10 as Wise Owl Award--canceled.
2. Armored for safety article to issue Plant News next week (with STOP special edition)--Riddle.
3. Cafeteria display of protective equipment and armadillo--June 1--OSC.
4. Unit/Craft team memo request for "Burma Shave sign" caption, to issue by end of May.
5. IMSB requested to initiate June safety meetings for "protective equipment used in unit or craft".
6. Safety messages on hourly checks began May 13.
B. Portable Buildings Action Request
Action request issued May 3. PMSB members are requested to issue a memo to G. L. Tromblee (copy to D. D. Kos) summarizing action plan
sc 003253
LAM004267
PMSB Meeting Minutes - May 19, 1982
Page 6
for each building by June 9. SHAC will pull together total plant summary for June PMSB report. Mainte'nance has agreed to identify Ed Crow's group as portable building coordinator, beginning third quarter. Recommend status be reported quarterly.
C. Hourly Safety Committee
Attendance was five of nine members (one - family illness, one - out of town, two - forgot). Dennis Kos will request unit/craft contact supervisor (through manufacturing superintendent) to counsel with
members who miss two sessions (mild but frank one-on-one). George Danner reviewed the Investigation P-Bulletin and the pumper gauger Injury resulting from a tank truck HC1 release. C. M. Cruse reviewed the special tank entry and cleaning procedure to be used in the near future on a trial basis.
D. Quarterly S/H Inspections
Scheduled for June. To concentrate on completion status of previous comments.
E. S/H Competition Program
SHAC is developing and evaluating a modification of the quarterly inspections to incorporate a competition program. If ready for PMSB review by May 26, recommend special PMSB meeting for approval. This would allow June implementation. The Plant Manager* suggested that SHAC contact Mr. Baxter Tilford, Plant Manager of the Avon, California plant about their use of "scoring sheets" for safety and housekeeping inspections.
IV. LOSS REPORTING--R.T. HAMMANN/J.A. GLASS
There were no outstanding loss reports at this time.
V. STATUS OF BREATHING AIR SYSTEM PROJECT--G T. RYAN
The new breathing air system was placed in service on Monday, May 17, so far it seems to be working properly.
VI. REVIEW OF INCIDENTS
Monsanto Incidents
Date Incident No
Description
4/19/82 82-12 (Not Issued)
Recordable Injury-Days-Away-FromWork-Major--Dept. 15, East side of CT-1; fell from extension ladder;
SC 003254
PMSB Meeting Minutes - May 19, 1982
Page 7
head lacerations, multiple fractured ribs, and a compression fracture of the twelfth thoracic vertebra. (P. Bailey)
4/28/82 82-13 (Not Issued)
Recordable Injury--Dept. 19; slipped on bolt and fell against stairway; laceration to left leg requiring five stitches.
5/10/82 82-14 (Not Issued)
Recordable Injury-Days--Away-FromWork-Major--Shops; caught index finger in threads of brass nut on lathe.
Contractor Incidents
5/10/82 C-82-08 (Not Issued)
Recordable Injury--Opel Pipefitter; Old Dept. 17, Utilities; cut index finger while removing pipe from vise--4 stitches. (C. Mata)
Mike McCullough reported on two incidents that had occurred that could have resulted in serious injury. One involved dropping a large bolt that landed on the shoulder of a boilermaker. Another involved the breaking of a sledge hammer handle the first time it was used. Investigation of bozh of these incidents are in progress.
VII. STATUS OF S-T-O-P PROGRAM--G.W. DAUES
As administrator for the STOP program, Greg reported progress in deve loping information on how the program would be instituted in the plant. The Plant Manager expects to be in St. Louis next week discussing it with other MCI Plant Managers who have used STOP programs in their plants.
Attachments JAG/es
J. Arnold Glass
SC 003255
LAM004269
1932 SAFETY - TOTAL CONTRACTORS T otal Injuries
C u m m u la tive T IR
C u m m u la tive RIR
0
Recordable Injuries Recordable Inju-ry Rate
SC 003256
LAM004270
TOTAL PLANT CONTRACTOR SAFETY 1
TOTAL INJURY CASES RECORDABLE CASES LOST WORK DAY CASES DAYS AWAY CASES
1982 YTD 11 3
1
TOTAL MANHOURS WORKED (MHW)
FREQUENCY RATES/200,000 MHW
TOTAL INJURY RATE TOTAL RECORDABLE INJURY RATE TOTAL LOST WORKDAY RATE TOTAL DAYS AWAY RATE
123,806.5
17.7 4.8 1.6
March 182 2 1
1981 Totals - 70 12
05
40,422.5
521,991
9.8 25.8 4.9 4 . 5
0 ' .9
J
SC 003257
LAM004271
1982 Safety - Captial Projects Total Injuries
----------------Total Injury' Rate
C um m ulative TIR
C u m m u la tiv e RIR
4
LO CU
r--
S3
a>
r--
-O
fO -ua o u
CU
or 1)
> ra
3
C =?..
;\N.
F9. *
var.
APR.
MAY
Recordable Injuries Recordable Injury Rate
fSP.
OCT.
1931
SC 003258
LAM004272
0 CAPITAL PROJECTS CONTRACTORS
TOTAL INJURY CASES RECORDABLE CASES LOST WORK DAY CASES DAYS AWAY CASES
1982 YTD 8 2
1
TOTAL MANHOURS WORKED (MHW) FREQUENCY RATES/200,000 MHW
57,313.5
TOTAL INJURY RATE TOTAL RECORDABLE INJURY RATE TOTAL LOST WORKDAY RATE TOTAL DAYS AWAY RATE
27.9 6.9
3.4
March '82 1 0
1981 T otals 22 4
0 16,711.5
2 161,709
11.9 0
0
27.2 4.9
2.4
*
J Sc 3lss
LAM004273
CED CONSTRUCTION TEXAS CITY PLANT
ACCIDENT STATISTICS
NUMBER OF CASES Without Lost Workdays
Lost Workdays (Days Away) Fatalities Total Injury Total Recordable
FREQUENCY RATES Total Injury Total Recordable Total Lost Workdays
MANHOURS WORKED
3/82
6 1 0 7 1
23.9 3.41 3.41
58,497
YTD 4/82
24 2 0
26 4
33.26 5.11 2.55
156,320
SC 003260
Lfcfd10042.74