Enclosed Is our fiber analysis summary from Libby for year end 1984. Personnel samples as determined show 203 samples with an average TWA of 0.10 f/cc. Since our sampling Is performed In areas of highest known exposure, the amount shown overstates the average employee exposure. Based on the number of persons employed and the areas of exposure, our 1984 average employee exposure was determined to be 0.07 f/cc.
JWW:del Enclosure
bcc: R. M. Vlning R. C. Walsh
Vice President Manufacturing & Engineering
10001685
GRACE
Monthly Fiber Exposure Summary December 198**
Zonolil* C*ntln*cK*n htdvcri OUiiion
TOTAL PERSONNEL YEAR-TO-DATE
TOTAL PERSONNEL j MO. 1 |*
T.V.A.
liU Ur
|
T.V.A.*S 1 (f/cc) ii 1!
i
j 203
i
i
1 ! 0.10 1
i
*
i
22 0.06 I
` (2J 7.W.A. DISTRIBUTION, RANGES Iff f/cc
1 j
0-00-Q.2D ' 0.20-0.50 t
11 92* 1
6* ! i
o0
o1
IT
d
1.5*
1.00"*- | 0.5*
1
186 13
31
sn 9* 0* 0* \ | 20 2 0 0
1
10001686
GRADE
1984 REVIEW OF LIBBY OPERATIONS PAGE 10
Zonolil* CMittiwNM Product* Division
CONCENTRATE INVENTORIES
The table below shows comparison between year-end 1983 and 1984.
It is interesting to note that the traditional size distribu tion of inventories have switched from an excessive inventory of fines to an excessive inventory of coarse material. With the market trend expected to continue, we will be attempting to shift our production distribution to accumulate at least 3,000 tons of both No. 3 and No. 4, in addition to what we have now during the first quarter of 1985, at the same time attempting to de-emphasize as best as possible the production of No. 2 product and eliminate production of No. 1 product. Permanent installation of the Fitzmill grinder in the screen plant will give us better control over this balance.
PRODUCT
1983 INVENTORY
1984 INVENTORY
L-1 L-1 SBO L-2 L-2 SBO L-3 L-3 SBO L--4 L-4 SBO L-5 TOTAL
2882.0 -
3112.0 -
8281.0
-
6830.0*
-
Q 21,105.0
4741.5 0
100.0 4071 .0
309.0 5309.0 2740.4* 1820.9
0 19,091.8
We also have 218*000 pounds of LTEV in inventory which was produced in 1984.
*Includes approximately 2600 tons of dead storage in the bottom of silos which is of questionable quality and would have to be loaded by hand.
[LLUTION CONTROL/FIBER EXPOSURE
During 1984* 203 TWA measurements of personnel exposure
were made at Libby. The average TWA exposure measured was 0.10
F/CC.
92.0% of all exposures measured were less than 0.20 F/CC,
6% fell below 0.20 and 0.50 F/CC, 1.5% fell between 0.50 and
1.00 F/CC and only one of the measurements taken exceeded 1.00
F/CC.
A statistical analysis was attempted to try and develop
an average exposure for workers at Libby from the measurements
taken in the various job categories and the number of people
10001487
GRACE
1904 REVIEW OF LIBBY OPERATIONS PACE 11
Zonolit*
ConttnKtbMi Much DMtleii
working in those categories.
The result of this analysis is
that Libby employees, on average, were exposed to 0.07 F/CC
on a TWA.
All of these statistics are accumulated utilizing
Dr. Julie Yang's discriminatory counting method.
These results are very encouraging since they represent
a very substantial improvement over the measurements taken during
the last seven months of 1983, utilizing the same counting tech
nique. During that period approximately two-thirds of the counts
were less than 0.20 F/CC and the estimated average employee
exposure was 0.14 F/CC.
Most of this improvement is due to
a more enhanced employee awareness and caution in this area
rather than the result of physical changes in the plant or work
ing conditions.
Spray shields were installed on the Derrick
screens in the wet mill and they are somewhat effective, although
we are still not satisfied with the exposures we are experiencing
in the tower section of the mill. The SBO system is now treating
all concentrates which are added to inventory, and other than
the No. 1 inventory, we have turned over the inventory during
the last half of the year and have very little dry material
in storage. This, of course, has had a dramatic affect on fiber
exposures in the storage and load out areas, as well as screening
plant employees shuttling material from the screen plant to
storage.
In October we initiated a service to all employees which
should in the future result in further reduction of fiber expos
ure at Libby. We completed a laundry facility and began a manda
tory program of laundering work garments used by all employees
on a frequent basis.
At these extremely low exposure rates,
we confirmed with a few tests that a substantial amount of the
exposure was being carried around by employees on their cloth
ing.
Frequent laundering, a free service provided by the com
pany, will eliminate this portion of the exposure. The program
is well accepted by employees in general and being utilized,
and on the basis of November and December, the only two months
statistics available, showed a reduction of 40 to 50% in the
time weighted average fiber exposures measured. At least one
year's accumulation of data will be required to draw a definitive
conclusion.
Mark Murphy has developed a program which will be used
in 1985 to generate a more rigid statistical analysis of our
fiber exposure measurements.
To make it possible to estimate
a confidence interval on our estimation on the average fiber
exposure being experienced at Libby, we believe by changing
some of the work area listings so that unlike areas are measured
separately, and by placing more emphasis on the listing of meas
urements taken in abnormal situations, where respirators are
10001668
GRACE
1984 REVIEW OF LIBBY OPERATIONS PACE 12
Zonolit* Construction Product* Division
used* for example, separate from the averaged figures that we can fit to a "Student t" statistical distribution and make possi ble the estimate of a 90% confidence interval without significant ly adding to the number of samples taken during the year.
PROCESS CONTROL/ RESEARCH GROUP
ed :
The major efforts of the research group during 1984 includ
1. Sampling evaluation of the slot screen circuitry
which was added to the screening plant and started
at the beginning of 1984.
There were several
bugs to work out regarding the selection of screen
ing cloth, etc.
Sampling and test work in this
area has continued throughout the year in a declin
ing rate and by year-end most of the problems
have been resolved. This circuit is very success
ful; see Quality Control section of this report.
2. Start-up support for the SBO coating circuitry installed at the screening plant. Testing and calibration, etc. required substantial research efforts for brief periods of time during the latter half of the year.
3. Evaluation of a Cyroter air classification machine developed by MPSI. The machine, although success ful in making a size split, did not appear to make tremolite reductions hoped for.
4. Additional heavy media separation work which
has also failed to come up with effective practi
cal tremolite rejection scheme.
However, the
work did confirm previous knowledge that heavy
media could be used to reject substantial quanti
ties of gangue material in the head feed and
may yet prove to be a justifiable circuit modifica
tion .
5 Continued monitoring of seasonal changes in our process water have identified changes in both calcium and temperature which may be significant. In 1985 we plan to continue sampling on a weekly basis and include the 6X20 flotation water in i00l689.4