Document nkL8p1V1LrQg7KwG7jknXrLwX

T&R Mechanical Contractors, Inc. 4013 Taylor El Paso, Tex. 79930 13 February 1981 T&R Mechanical Contractors, Inc. intends to man the Plant 33 Isolation project with a work force of one foreman, five qualified welders and an equal number of pipefitters and/or apprentices. Laborers will also be provided as necessary. Addition or subtraction of workers will be made as progress warrants. Feb 17 - Familiarize men with job, set up fab area with Chevron representative, transport material, begin fuel gas from knockout drum. . Feb 18 - Continue fg $iCeDrWko drm, ' begin fg to ko drum, begin jacket water, trans . port material, ditchwork for jacket water. Feb 19 -.Continue fg from ko drum, continue fg to ko drum, continue jacket water, ditchwork for jacket water. . Feb 20 - Continue fg from ko drum, continue fg to ko drum, continue jacket water, begin instrument air, begin 110# steam. Feb 23 - Continue fg from ko drum, continue fg to ko drum, finish jacket water, continue instrument air, continue steam. Feb 24 - Complete fg from ko drum, continue fg to ko drum, continue instrument air, continue steam. Feb 25 - Complete fg to ko drum, finish instrument air, continue steam, completely do condensate from water jacket cooler. Feb 26 - Finish steam, test up to tie in fg (2 lines) and instrument air, begin. . condensate to water jacket cooler. . ' Feb 27 - Continue condensate to water jacket cooler, begin utility air, test , steam to tie in, begin nitrogen. Mar 2 - Continue condensate to water jacket cooler, continue nitrogen, continue ' utility air, begin hydrogen sulfide, begin plant 38 product. Mar 3 - Continue condensate to water jacket cooler, continue nitrogen, continue utility air, continue hydrogen sulfied, continue plant 38 product. Mar 4 - Finish condensate to water jacket cooler, continue nitrogen, finish utility air, continue hydrogen sulfide, -ksg-in-aafeural gas., continue plant 38 product. Phone: (915)-562-8444 or (915)-566-7194 CHEVB8 5818 Page 2 Mar 5 - Begin sulfide chemical injection, finish nitrogen, finish hydrogen sulfide, begin natural gas, continue plant 38 product. Mar 6 - Continue sulfide chemical injection, begin feed to plant 38, continue natural gas, continue plant 38 product. Mar 9 - Cold cut and move ko drum, tie in instrument air, tie in jacket water, tie in steam, prepare for concrete foundation. Mar 10 - Tie in both fg lines, finish steam and jacket water, test, prepare for concrete foundation. Mar 11 - Continue plant 38 product, finish sulfide chemical injection, continue natural gas, continue feed to plant 38, pour foundation. Mar 12 - Finish natural gas, finish plant 38 product, continue feed to plant 38. Mar 13 - Finish feed to plant 38, and miscellaneous. CHEVB8 5819 T&R MECHANICAL CONTRACTORS, INC. 4013 Taylor El Paso, Texas 79930 PIPE WORK - PLANT 33 ISOLATION Contract # C-15-022-81 CHANGE 1 A) 2/26/81 - Add dummy leg to fuel gas line 1 welder, 1 fitter - 2 hrs ea regular time @ $16.28/hr 65.12 B) 3/ 6/81 - Add to Jet-A desulfurizer feed, 120' of 4" pipe and necessary fittings 1 welder, 1 fitter - 6 hrs ea regular time @ $16.28/hr 195.36 C) 3/12/81 - Reroute fuel gas from knockout drum to miss conduit bank as instructed by engineer 1 welder, 1 apprentice (6th period) - 3.5 hrs ea @ 1 1/2 overtime (3.5 hrs x$22.21/hr = $77.74 3.5 hrs x$17.00/hr = $59.50) 137.24 D) 3/12/81 - Begin reroute of fuel gas from knockout drum to miss existing platform 1 welder, 1 apprentice (6th period) - 2 hrs ea regular time (2 hrs x $16.28/hr = $32.56 . 2 hrs x $12.54/hr = $25.08) 57.64 E) 3/13/81 - Reroute fuel gas to knockout drum to miss existing platform and reroute relief from knockout drum for tie in to knockout drum drain 1 welder, 1 fitter - 6.5 hrs ea @ 1 1/2 overtime ($22.21/hr) F) 3/13/81 - Reflange hydrogen sulfide sour gas line in five places using fresh air equipment and resteam as required by r'l t;-V ("operators and test fuel gas due to delay caused by j rerouting fuel gas lines as instructed by engineer C,3 fitters, 6 hrs ea @ 1 1/2 overtime ($22.21/hr) G) 3/13/81 - Replace 3/4" valve on existing line at hydrogen sulfide tie in 1 welder, 1 fitter - 1 1/2 hrs ea regular time @ $16.28/hr 288.73 399.78 48.84 H) 3/13/81 - Add supports on 1" and 2".condensate lines and on 3/4" instrument air line . 1 welder, 1 fitter - 4.5 hrs ea regular time $16.28/hr 146.52 I) 3/16/81 - Add supports on 6" steam line, 1" condensate line, and 3/4" instrument air line 2 welders, 1 apprentice (2nd period), 1 foreman fitter, 4 hrs ea regular time (8 hrs x $16.28/hr = $130.24 4 hrs x $ 9.53/hr = 38.12 4 hrs x $17.33/hr = 69.32 237.68 CHEVB8 5820 T&R MECHANICAL CONTRACTORS, INC. Change 1 Page 2 PIPE WORK - PLANT 33 ISOLATION Contract C-T 5-022-81 J) 3/16/81 - Begin dismantle of 6" relief loop station by gas and oil control house 2 welders, 1 apprentice (2nd period), 1 foreman fitter - 2 hrs ea @ regular time (4 hrs x $16.28/hr = $65.12 2 hrs x $ 9.53/hr = $19.06 2 hrs x $17.33/hr = $34.66, . Boom truck - no charge K) 3/17/81 - Dismantle 6" station by gas and oil,control house 2 welders, 1 apprentice(2nd period), 1 foreman fitter - 3 hrs ea @ regular time (6 hrs x $16.28/hr = $97.68 3 hrs x $ 9.53/hr = $28.59 3# hrs x $17.33/hr = $51.99 Boom truck - no charge L) 3/17/81 - Add supports for new lines at north end of new pipeway 1 welder, 1 foreman fitter - 2 hrs ea @ regular time (2 x $16.28/hr = $32.56 2 x $17.33/hr = $34.66) M) 3/19/81 - Add 3/4" yard air and repair yard air valve 2 fitters - 6 hrs ea @ regular time @$16.28/hr N) EQUIPMENT RENTAL AND FUEL CHARGES Welding machines 3/13/81 10 hrs 3/16/81 4 hrs 3/17/81 2 hrs 3/19/81 2 hrs 18 hrs Rental 18 hrs x $.86/hr Fuel cost 18 hrs x $.70/hr Oxygen-Acetylene Rigs 3/13/81 10.hrs 3/16/81 4 hrs 14 hrs Rental 14 hrs x $.38/hr -- Pickup truck 3/13/81 3/16/81 3/17/81 10 hrs 4 hrs 5 hrs T9 hrs Rental 19 hrs x $.82/hr Fuel cost 19 hrs x $.70/hr TOTAL, CHANGE 1 $ 118.84 $ 178.26 $ 67.22 $ 195.36 $ 15.48 $ 12.60 $ 5.32 $ 15.58 $ 13.30 $2,198.87 CHEVB8 5821 T&R MECHANICAL CONTRACTORS, INC. 4013 Taylor El Paso, Texas 79930 PIPE WORK - PLANT 33 ISOLATION Contract # C-l5-022-81 CHANGE 2 3/7/81 - Overtime pay for Saturday worked due to rain-outs during week. Classification General foreman Fitter foreman Journeymen Apprentice (1st period) Apprentice (5th period) Operator Operator Laborer O.T. hrly - Reg. hrly ' Rate No. of ' Men $6.48 1 $6.34 1 $5.93 13 $2.97 1 $4.16 2 $4.96 1 $4.96 T $3.42 1 Hrs. Each 8 8 8 8 8 8 6.5 8 $ 51.84 $ 50.72 $616.72 $ 23.76 $ 66.56 $ 39.68 $ 32.24 $. 27.36 $908.88 CHEVB8 5822 Change r.~K-fl22-8l Contract Number Change Number, Date 2^1981 Company _ -VtF^fti>^ U 4 &____ \.t^ Contractor. T h R KA FCJAfcM \ CJXL^_____C.OK\TKfidJP^ ^ \.U_C> The requirements of the above-designated Contract are changed as follows: F\.TP> t)OKAfcA>{ LJEGs TC> FUEL- C=KS \-UAE 2. \7-D OF TO PEED G5VT4 1^5.^ 3>. fuel. gkvl F-^cw VXEA.S_ LxtUTLUT 4. R-Efdote fuse. G&S FT-Cft-vv v^cxLADurV D?T)tA DEOfA P LA.TF Op.WV * 5. Rs^nDOTE FUEL G/YL TO VJ^LCJALOT &KUNA. TO UAS^ J3T^4 57 *4*4 EXVfST t KbLa ?uATFORA AteT PJ5TOOT& PJFLiEF FRDTv^ Kl^OLKDOT EOT- TVEL LVA TO DRA\t^ . 4-.44I5 4 , ^.S5FEAK>(=>E V4.S SOOT^ OrAG ElKsF S FLRC_SS ~^9918 7. KePEFtLF 3/4." valve. om exi^ri^G uwe rt WS t>Ko gem SOL-Fioe tie iru, ' 48^84 COMPANY and CONTRACTOR agree that CONTRACTOR'S compensation shall be adjusted as follows: /&}&&&.. 7jj{\}Z-, 1 ^ /pAJg UlOL&QnJn Ajg tfurtbRED ^//AlTTV-7lk> P&^A ^ This adjustment covers the entire compensation for the Change set forth above and includes, but it is not limited to compensa tion for all engineering, material, equipment, subcontracts, labor, overhead, profit, changes in scheduling and delays resulting, directly or indirectly, from the Change. . CONTRACTOR By m 7LZ2 Work Completed: Signed. Invoice No._____ . Date. Charge Account No.. Charge Job No_____ Remarks___________ COMPANY . y*Ai_ a SliAyL(fgjftxiXy Date AmountDate Rec'd CHEVB8 5823 Q0-2S3-QHN (CD-9-76) Change Contract Number C-/S-OZZ-81 Change Number. Z- Date. Martin 30, H8I {L -Company. me vrou __ Iaul. T $/ RContractor. Mp.fXft.KndAV.__Cb.hlT^A^XOR The requirements of the above-designated Contract are changed as follows: \ . |\Dt) SUPPORT OW mb 2-" C-DKiDEKtSATG. UWeS D y1 3A" HlgZ. \W>5fTRxiM.tiAT MR. 1-AKiG. 2- $t>D SO'PPtiR.T'S ON (oU STEAM UN6 5 \" ej>N>t>EN5ATG LINE > AND 34*' VbSSTPJiJKA.eMT - AlK- UKie 3. Dismantle U'' R^uep dONTfePL \-\oOSG 4-. O^AN.T<.E. io1' STATION l&oP statiom ^ oil OIL CjE*3TRjekL WOOSE ]\%4 118.ZL 5", AbC> (4sw 4a A^c> F- NievM ume^ per ptPervOAY A-lP. A*fN>"C> FSPAVP- ^{ftR.D pNb OF A\^- YAIYG\ *7. Egd-HPvASSiT* ^JS-WTAL AvLiO Fuel-- ^zz (zlsZS COMPANY and CONTRACTOR agree that CONTRACTOR'S compensation shall be adjusted as follows:. Wt-esAsg \OQ(o.\to (. Ops TtAOU^AtOfr - Woo T^oLUAR^. 3________ This adjustment covers the entire compensation for the Change set forth above and includes, but it is not limited to compensa tion for all engineering, material, equipment, subcontracts, labor, overhead, profit, changes in scheduling and delays resulting, directly or indirectly, from the Change. Charge Account No------------------------------------------------------------------------------------------------------------------------ ----------- . Charge Job No Remarks.--------------------------------------------------------------------------------------------------------------------------------CHEV B8 5824 G0*283-GEN {CD-9-76) Printed In U.S.A. Change S-1-022-81 Contract Number _J5___________________ Change Number,_ Date _ IN/Uftim 27}n&l t4 r-- fUP.VRM. IJ 5 f)_____Im (U r-- 1~ I R Ur.t'Mmt'.RL____ CmTKtjUTod. y /uc. The requirements of the above-designated Contract are changed as follows: /. tOvefiT/ME PAH TO R.A(Ai-ouT$ Satof-drh imoso . Due THE. yjtEyc Z- - l * COMPANY and CONTRACTOR agree that CONTRACTOR'S compensation shall be adjusted as follows:.JaJRM ( Al/Mg NU/JDRED-e/^Ur &fy/oD DOLLAR^) This adjustment covers the entire compensation for the Change set forth above and includes, but it is not limited to compensa tion for all engineering, material, equipment, subcontracts, labor, overhead, profit, changes in scheduling and delays resulting, directly or indirectly, from the Change. CONTRACTOR By--------------- Work Completed: SignedDate Invoico NoDate;AmountDate Roc'd Charge Account No__________________________________________________________________ Charge Job No,________________________________________________________________________________ . Ilmtiarks.----------------------------------------------------------------------- -------------------- ---------,-------- --------- --- . ci-IEV 08 5825 C1D-28D G/> f CD-9-7G) Prlntsd In U,5.A.