Document nR970nvzyMQL4q1vb1dpja6m

r- Manville September 4, 1953 Study of Desired Specification New Process Magnesia Pipe Insulation E.C. Llndstrom'8 letter of 8/18/53 _____ ^ 5/ / In accordance with E.C. Lindstrom's letter to you of August 18, 1953* on study of Desired Specification, Thermobestos Pipe Insula tion, it was suggested that a similar report be prepared on Hew Process Magnesia and Superex. The following information was compiled from detailed inspection re ports which represent each first and one-hundredthpiece from all New Process Supers* Pipe Insulation inspected. This represents a cross-section of approximately 3000 pieces made in the Lever Moulder and 100 pieces from the Reciprocating Moulder inspected 6/3/53 to 8/31/53. J.R. Robson LGHsMB cc: H.E. Bird R. Jacobs R. C. Parlett, DHQ. S. Collier, GHC. E.C. Lindstrom, DHC. 2 Superex Pipe Insulation - Lever Houlder. Size No. Pieces 12" x 2-1/2" x 36" 2 12" x 3-1/2" x 36" 2 14" x 2" x 36" 16" x 2" x 36" 5 2 16" x 2-1/2" x 36" 7 18" x 1-1/2" x 36" 2 18" x 2-1/2" x 36" 5 20" x 1" x 36" 1 x 1-1/2" x 36" 3 23" x 2" x 36" 4 Totals 33 Passed Desired Spec. No! % 0 o.og 0 0.0 0 0.0 0 0.0 1 14.3 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 1 3.2g Passed Tentative Uo: S%pec. 2 100.0g 2 100.0 5 100.0 2 100.0 6 86.0 2 100.0 100.0 0 0.0 0 0.0 4 100.0 28 85.Og Re.lecte No. * 0 O.C 0 O.C 0 O.C 0 0.0 1 1*.3 0 O.C 0 O.C 1 100.C 3 100.C 0 0.0 5 15.0 c O CM Superex Pipe Insulation - Reciprocating Moulder Size v. 4" x 2" No. Pieces 36" 2 Passed Desired Spec. Wo. ?> 0 0.0 Passed Tentative Spec. No. 5 2 100.Og Rejected ` HUT 0 0.0?