Document nNRJn6Ryg17a8JYwMrDaVK6qz
Prepared by Personnel T 'rtmant Employee Communieativ. .(vision
PLAINTIFF'S
EXHIBIT CHV-475
*50 *->JJ--
Newsletter
Chevron
August 1972/No. 311
Cleaner refineries
El Segundo and Perth Amboy refineries are a conti nent apart geographically but they are first cousins environmentally. Each is situated in a vast population center and each is related to all other refineries, in the common need for careful environmental considera tions. The Company has spent some $40 million to protect the environment at El Segundo and about $8 million at Perth Amboy. Another S6.2 million will shortly be spent on the two for further environmental controls.
El Segundo
(This separation process is in lieu of large settling ponds which are used at Richmond Refinery. At El Segundo, there is not enough spare acreage for ponds.)
The entire project will be completed by mid-1976.
Perth Amboy
If you could peek inside the cat cracker at ChevronEast's Perth Amboy Refinery, you'd see among other things, a lot of silica-alumina catalyst pellets being jostled up and down and sideways under intense heat and slowly being abraded to dust.
Back in August of 1970, Corporation Engineering, Dust is a dirty word in these days of environmental
Chevron Research and the Western Operations Manu concern, especially in oil refineries and other manu facturing people at El Segundo started a three-month facturing plants. Perth Amboy's cracker already has
study of the waste water situation at the refinery. considerable equipment installed to prevent most of
The result was a l'A-inch-thick master plan defining this dust from escaping to the atmosphere. However,
the alterations necessary to meet state and Federal careful analysis has shown that up to 160 pounds per
regulations which at the time were only being talked hour is still escaping from two flue gas stacks.
about but were nevertheless clearly predictable.
More sophisticated equipment is now being added, at
The refinery plan will cost $5 million and has three a cost of $1.2 million, which will reduce the dust loss
major parts which are all under way.
by 99 percent. The project will be completed by the
The first, which is scheduled for completion by
end of 1973.
the fall of 1973, calls for a new large cooling tower. The refinery presently draws in about
Problem in Peru
24,000 gallons of sea water a minute for cooling
Last May 16, the tax court in Peru ruled that Refin-
and returns it to the ocean. The new tower will
eria Conchan Chevron S.A., a Socal refining and mar
' take over this cooling function by using fresh
keting subsidiary in Peru, must pay stamp taxes
water circulating within a closed system.
amounting to several millions of dollars for a period
dating back to 1967, and must continue to pay such
The second part provides a parallel drainage
taxes in the future. Subsequently, the government
system which will allow separation of the con
placed an embargo on Conchan's concession rights, its
taminated streams for different purification ' physical assets and its bank accounts.
processing.
Because of the embargo (attachment in U.S. terminoL--
Third is an air flotation tank in which bubbles of
ogy), plus restrictions on the importations of crude
air will rise up through the water, separating the
oil, Conchan was forced to suspend operations on
small quantities of oil from the water and send ing it to the surface where it can be removed.
June 3. Finally, on July 13, the Peruvian Government
took possession of the company's assets. CH 00826
TPffoj faU**
laiued monthly by Standurd Oil Company of California to inform luparvleon and other management on development* within tha corporate family (for ln-Comp#nv communications onlvl
CHEVB8 5616
The Conchan situation is complicated. It dates back to contracts signed with the Peruvian Gov ernment in the early 1960's which exempted the Conchan operation from all taxes except those on income. In 1966, the government modified the petroleum code to eliminate the tax exemp tions. In December 1967, the government tax office brought a claim against Conchan for pay ment of stamp taxes retroactive to 1964. Six months later, a special tax tribunal confirmed the scamp tax exemption.
OSHA and asbestos
Asbestos is a grayish or greenish fibrous mineral used for making incombustible or fireproof articles. In modem industry there are some 3000 applications of this unique mineral.
Early in this century, a scarring disease--asbestosis--of the lungs was found in individuals exposed to asbes tos-laden dust. Recent studies indicate that more serious complications can result.
The present government of Peru has seen fit to challenge the exemption once again; the decision of May 16 represents the culmination of that challenge.
Conchan management has made a strenuous effort to seek an agreement with Peru, which would result in a mutually satisfactory settlement of the tax dispute. This effort is continuing.
Aramco's Sea Island
Sea Island 4 ended its 9000-mile journey from Japan to Ras Tanura, Saudi Arabia, on June 27 and slipped into position within 1 inch of its design position. It joined its sisters, Sea Islands 1, 2 and 3 as part of the largest offshore loading facility in the world.
Sea Island 4 will accommodate simultaneously two supertankers ranging from 150,000 to 500,000 dead weight cons and brings the total berths at the Sea Island complex to eight.
This latest addition to the complex is larger than any of its three older sister installations. The central plat form measures 265 x 125 feet; walkways connecting it to the six mooring dolphins and to Sea Island 3 give it an overall length of 1750 feet. With its arrival, the length of the total Sea Island complex becomes 1.1 miles.
The giant loading facility is located about two miles offshore in 90 feet of water. Sea Island 4 is scheduled to go into operation in September 1972.
Socal has few employees who are exposed to asbestos dust and their exposure is very different than occurs in the asbestos manufacturing and construction indus tries where most health complications have occurred. No Socal employee has contracted asbestosis.
OSHA (Occupational Safety and Health Administra tion) recently established safety and health standards for exposure to asbestos dust. These were established only after much debate and disagreement. The dis putes have centered around the -determination of a specific level of asbestos fiber concentration in the air below which exposure is safe.
OSHA has established 10 regulations which:
1. Set maximum exposure limits; 2. Require engineering controls to achieve
compliance; 3. Require specific controls for certain operations; 4. Limit the use of respirators for compliance; 5. Require provision of special work clothing; 6. Specify monitoring of airborne dust levels; 7. Require caution signs and labels; 8. Require pre-employment, annual and termination
medical examinations; 9. Specify retention time and access of medical and
monitoring records; 10. Require disposal of wastes in sealed containers.
In keeping with Company policy and practice, and mainly as a matter of information, the Corporation Safety Division is preparing compliance guidelines for distribution to all organizations.
VXG'VA'V-
\<VU_ VW'IM
CHEVB8 5617