to From Date subject Ron Bryan v. M. Fisher January 27, 1983 VOC Fugitive Emissions Register A system for tracking the VCM Plant's Volatile Organic Compound (VOC) fugitive emissions offsets has been developed to insure that increases from the Modernization Project are adequately offset and/or for use in offsetting the future expansion. Sometimes equipment modifications, because of either engineering changes or maintenance changes, qualify as VOC offsets. Currently, there is no way of keeping track of these offsets. To track these offsets a register has been set up. This register is a simplified ledger system providing a seeat-a-glance comparison between the equipment modification offset credits and the remaining offsetting potential. The Process Engineering and Maintenance Departments should be aware of these equipment modifications as specified in the VOC Fugitive Emission regulations. Also, both departments should be aware of the plant's equipment that is defined as VOC controllable fugitive emission sources (refer to Table 2). If any of this equipment is modified by either a process design or a maintenance field change, then the Environmental Coordinator should be notified. He should be notified in the following manner: 1) For maintenance field changes submit a copy of the work order to the Environmental Coordinator with a brief explanation. 2) For process design changes, a VOC Fugitive Emission Update would be included as part of the "Environmental Impact Statement". This update would state whether or not the design affects the status of the VOC offsets. If the design affects the VOC offsets, the Environmental Coordinator and the engineer issuing the design will follow the project until its installation in the field. Upon receiving notification that the modifications have been completed, the coordinator will enter the following information into the VOC Emissions Register: Date - Record the date the equipment was modified. Project Description - Give a brief explanation of the type of equipment modifica tion and a work order or a design number (This will help in verifying the offset's validity if necessary.). Offset Credit - Enter the estimated VOC fugitive emissions offset for the particular equipment modification, refer to Table 2. Offset Credit Balance - Compute the new total of offset credits from equipment modifications. CCR 000017657 The plant had an estimated VOC fugitive emissions offsetting capability of >1 lbs./hr (Note that this is a revision since the October 27, 1982 update): Existing Equipment in VOC Service Estimated VOC Emissions Offsets 47 Pumps 27 Sampling Connections 84 Safety Relief Valves 6 Compressors Total 5.1183 lbs./hr. 0.8910 lbs./hr. 19.2612 lbs./hr. 3.0156 lbs./hr. 28.2861 lbs./hr. These estimated offsets are the maximum credits which can be received for the equipment modifications. The actual credit which can be received depends on the number of new valves added in conjunction with the equipment modification: Maximum Emission Credit for Equipment Modification. (See Table 2) Number of New Valves x Added Emission Factor for Valves in Either Liquid or Gas Service. (See Table 2) Net Emission Offset Credit for the Equipment Modification. The Net Emission Offset Credit for the Equipment Modification is recorded in the TOC Fugitive Emission Register under Offset Credit. So far, 4.0645 lbs./hr. of offsets from equipment modifications have been credited. These credits have been already entered into the VOC Fugitive Emission Register. To counterbalance the estimated VOC fugitive emissions expected from the Oxy Modernization project, a total of 5.8060 lbs./hr. of offset credits are needed. Plans for other equipment modifications are discussed in a class "A" process design ("VOC Regulation Compliance -- VCM Modernization" issued March 12, 1982) by Jeff McCrary, PED. This design provides for the installation of rupture disks under thirty-five relief valves, and the removal of two relief valves which are in VOC service. The retrofitting of the safety relief valves will begin during the turnaround and will be completed after startup. However, eight relief valves will have to be modified by the startup date to have enough offset credits to counterbalance the modernization project. Once this retrofitting work is complete, it will result in additional offset credits of 8.2381 lbs./hr. The offset credits, in excess of the 1.7415 lbs./hr. needed for the modernization project, will be accumulated to counterbalance future fugitive emission increases, such as for a plant expansion. Attached are a list of the existing equipment in VOC service (Table 1), the equipment fugitive emission factors (Table 2), revised projected fugitive emissions for Oxy Modernization and Plant Expansion (Table 3), a copy of the "VOC Impact on Future Plant Process Designs" letter, and a copy of the actual entries made in the register. The register and Table 1 should be updated by the Environmental Coordinator as equipment modifications are completed. This register is for internal use only. CCR 000017658 If there are any questions or comments please contact me. VirgiVM. Fisher Process Engineer br cc: JAD-JWW-MLA-JRH-JMT-SRA-PLF-DLD-JGC-PDD-MWC-MJA-SJR-SWS-SCR MGH-HOA-LKC-PFF-JKM Oooi *65 9 Pumps 1. P-102A *2. P-102B 3. P-103A 4. P-103B 5. P-104A 6. P-104B 7. P-105A 8. P-105B 9. P-106A 10. P-106B *11. P-108 *12. P-109A *13. p-noA *14, P-110B *15. P-110C 16. P--112 17. P-115 18. P-255 *19. P-402 *20. P-405A 21. P-425 22. P-450 !3. P-451A 24, P-451B 25. P-452 Table 1. Existing Equipment in VOC Service Description Caustic Wash Caustic Wash L. E. Column Feed L. E. Column Feed L. E. Column Reflux L. E. Column Reflux H. E. Column Feed H. E. Column Feed H. E. Column Reflux & Product Transfer H. E. Column Reflux & Product Transfer EDC Tar Still Overheads EDC Tar Still Bottoms Water Wash Recycle Water Wash Recycle Water Wash Recycle EDC Transfer Oil Pump (BL-301) EDC Circulating Pump Light Ends Transfer Pump EDC Tar Transfer EDC Unloading EDC Transfer Pure EDC Transfer Pure EDC Transfer EDC Transfer Status Tandem Seals 12/6/82 CCR 000017660 Pumps Description Status 26. P-453 Wet Crude EDC Rerun *27. P-454 T-453 Water Pumpout 28. P-460 Slop Tank Transfer 29. P-500 EDC Phase Transfer *30. P-503A T-512 Water Phase Transfer *31. P-512A T-514 Ejector Pump *32. P-512B T-514 Ejector Pump *33. P-504 C-500 Transfer Pump *34. P-605A Lube Oil Console *35. P-605B Lube Oil Console *36. P-606A Main Oil Pump (BL-501) *37. P-606B Main Oil Pump (BL-501) *38. P-607A Main Oil Pump (BL-605) *39. P-607B Main Oil Pump (BL-605) *40. P-902A Liquid Feed to Incinerator *41. P-902B Liquid Feed to Incinerator *42. P-902C Liquid Feed to Incinerator *43. P-902D Liquid Feed to Incinerator *44. P-911 Flame Arrestor Pumpout *45. P--911 B Flame Arrestor Pumpout *46. P-912 Flame Arrestor Pumpout *47. P-912B Flame Arrestor Pumpout *Equipment requires extensive modifications or replacement to qualify as an offset 0001^661 CCfc 0 Compressors Description Status *1. BL-410A *2. BL-410B 3. BL-501 *4. BL-502 *5. BL-602A *6. BL-602B Freon Freon Propylene Freon Freon Freon Iso-seals with a closed loop system for vents *Equipment requires extensive modifications or replacement to qualify as an offset. CCR 000017662 Sample Connections 1. C-102 EDC Feed 2. C-102 EDC Bottoms 3. C-103 EDC Reflux 4. R-101 EDC 5. R-102 EDC 6. R-103 EDC 7. T-101 EDC 8. C-203 Bottoms 9. T-103A EDC 10. P-110A Discharge 11. P-110B Discharge 12. P-1 IOC Discharge 13. P-102A Discharge 14. P-102B Discharge 15. T-102 EDC 16. S-309 EDC 17. S-307 EDC 18. S-306 EDC 19. H-201A 20. H-2018 21. C-204 Make 22. Vaporizer Feed 23. S-102 pH 24. EDCTS Pumpout EDC 25. S-109 EDC 26. VTS Overhead 27. VTS Pumpout EDC Status Closed Loop Sample - G1 ove Box #1 Closed Loop Sample - G1 ove Box #1 Closed Loop Sample - G1 ove Box #1 Closed Loop Sample - Glove Box #2 Closed Loop Sample - Glove Box #2 Closed Loop Sample - Glove Box #2 Closed Loop Sample - Glove Box #2 Closed Loop Sample - Glove Box #1 Closed Loop Sample - Glove Box #3 Closed Loop Sample - Glove Box #3 Closed Loop Sample - Glove Box #3 Closed Loop Sample - Glove Box #3 Closed Loop Sample - Glove Box #3 Closed Loop Sample - Glove BOX #3 Closed Loop Sample - Glove Box #3 Closed Loop Sample - Glove Box #4 Closed Loop Sample - Glove Box #4 Closed Loop Sample - Glove Box n Closed Loop Sample - Glove Box #5 Closed Loop Sample - Glove Box #5 Closed Loop Sample - Glove Box #5 Closed Loop Sample - Glove Box #5 CCR 000017663 Safety Relief Valve 1. RV-101A (1) 2. RV-101B (1) 3. RV-102 (1) 4. RV-103A 5. RV-104(1) 6. RV-106C (1) 7. RV-106D (1) 8. RV-108A (1) 9. RV-108B (1) 10. RV-108C (1) 11. RV-108D (X) 12. Rv-m 13. RV-115 14. RV-115A 15. RV-118 (1) 16. RV-125 17. RV-126 18. RV-127 19. RV-128 20. RV-129 21. RV-130 22. RV-131 23. RV-132 24. RV-133 25. RV-134 26. RV-135 27. RV-136 28. RV-137 Description F-101A F-1Q1B R-103 R-101 T-101 H-105A H-105B C-103 C-103 H-108A H-108B S-109 C-101 C-101A S-103 BL-602 BL-602 BL-602 BL-602 BL-602 BL-602 BL-602 BL-602 BL-602 BL-602 BL-602 BL-502 BL-502 Status Installed Installed Installed (2) (2) (2) (2) (2) (2) (2) (2) (2) (2) (2) 00001766* CCR (2) Safety Relief Valve 29. RV-138 30. RV-139 31. RV-140 32. RV-141 33. RV-147 34. RV-148 35. RV-149 36. RV-150 37. RV-155A/B 38. RV-162 39. RV-2Q3(1) 40. RV-206C 41. RV-206D 42. RV-213 43. RV-214 44. RV-230A 45. RV-230B 46. RV-231A 47. RV-231B 48. RV-240A (1) 49. RV-242 50. RV-246 51. RV-315 (1) 52. RV-316 53. RV-318 (1) 54. RV-415 55. RV-453 56. RV-456 57. RV-457 Description BL-502 BL-502 BL-502 BL-502 BL-502 BL-502 BL-502 BL-502 F-105A/B P-109A H-213 H-206A H-206B H-212 H--212 H-201A H-201B H-201A H-201B S--312 H-204 R-102 S--215 H-308 H-306 P-405 F-102 H--491 H-491 Status (2) (2) (2) (2) Installed RD-213 Installed RD-214 Installed RD-230A Installed RD-230B Installed RD-231A Installed RD-231B (2) Insatlled RD-102 (2) Installed RD-317 (2) (2) ccR 0000001766665 (2) rCoO 00 Safety Relief Valve 58. RV-458 59. RV-463 60. RV-464 61. RV-465 62. RV-466 63. RV-467 64. RV-468 65. RV-469 66. RV-505 67. RV-497 a) 68. RV-60Q u) 69. RV-601 a) 70. RV-604 CD 71. RV-605( 1) 72. RV-606 (i) 73. RV-607 (D 74. RV-617 (i) 75. RV-618 (i) 76. RV-623 77. RV-631 RV-644 79. RV-656 80. RV-677 81. RV-702 RV-904 83. RV-106A 84. RV-144 Description Status H-491 H-491 BL-410 Intercooler (2) (2) (2) BL-410 Intercooler (2) BL-410 Receiver (2) BL-410 Receiver BL-410 Oil Pot BL-410 Oil Pot S-505 (2) (2) (2) BL-501 (2) T-506 (2) T-502 T-503 (2) T-504 H-502 (2) (2) H-501 (2) S-105B S-105A H-103 (2) H-611 C-102 S-460 Tars Trailer (2) (2) T-461 T-902 C-102 S--313 Removed from Service qQQOI ?666 Notes: (1) Equipment requires extensive modifications or replacement to qualify as an offset. (2) Modification planned, class "A" process design, "VOC Regulation Compliance -- VCM Modernization1' issued by Jeff McCrary, FED. 0176&7 CCR 00 Table 2. Equipment Fugitive Emission Factors Source Average SOCMI Emission Factor Lb/Hr/ Source (1) Pumps - light liquid Valves - gas - light liquid Compressors Safety/Relief Valves - gas Sampling Connections 0.1089 0.0123 (2) 0.0157 (2) 0.5026 0.2293 0.0330 Notes: (1) In an addendum (47FR 19724, May 7, 1982) to the Background' Information Document (BID) (EPA-450/3-80-033a), the EPA issued these revised Synthetic Organic Chemical Manufacturing Industry (SOCMI) fugitive emission factors. (2) Use the appropriate valve emission factor for all new valves installed with an equipment modification to determine the net offset credit. Maximum Emission Credit for Equipment Modification Number of Emission Factor New Valves x for Valves in Added Either Liquid or Gas Service Net Emission Offset Credit for the Equip ment Modification CCR 00001T668 CCR 000017669 TABLE 3 REVISED PROJECTED FUGITIVE EMISSIONS for My Modernization and plant exFMsion Fugitive Emission Source 2 New Pumps (Controlled) New Relief Valves (Controlled)2 New Non-Vinyl Compressors (Controlled)2 New Valves Plant Expansion (1) Process Valves In Vapor Service Process Valves In Liquid Service Instrument Valves in Vapor Service Instrument Valves in Liquid Service Total Oxy Modernization^) Process Valves in Vapor Service Process Valves In Liquid Service Instrunent Valves In Vapor Service Instrument Valves In Liquid Service o To,il Number of Sources 2 6 3 241 500 29S 381 1.420 107 96 165 43 433 Uncontrolled Emission Factor lb/hr Total Uncontrolled Emissions lb/hr Controlled Emission Factor 0.00 0.00 0.00 .0123 .0157 .0123 .0157 .0123 .0157 .0123 .0157 2.964 7.850 3.665 5.9S2 20.461 1.316 1.539 2.276 0.675 5.806 NOTES: 1) A definitive estimate of the entire expansion from PED. 2) A preliminary estimate of the oxychlorination revamp and direct chlorination modification from PED. 3) Estimated valve split for the entire expansion is 40% in vapor service and 60% in liquid service. Estimated valve split for the oxychlorination revamp and direct chlorination modification is 70% in vapor service and 30% in liquid service. Total Controlled Emissions Ib/hr 0.00 0.00 0.00